Loading...
HomeMy WebLinkAboutPW CNT 09-21/CNG 1 (Buteyn-Peterson) DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O. Box 1130 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 Fax(920)236-5068 Of-<Of ON THE WATER December 14, 2011 Mr. Jon Kleist Buteyn-Peterson Construction Co., Inc. N7337 Dairyland Drive Sheboygan, WI 53083 Re: Change Order No. 1 Contract 09-21 Dear Mr: Kleist: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Buteyn-Peterson Construction Co., Inc. regarding the above-mentioned contract. If you have any questions, please call our office at (920) 236-5065. Sincerely, D3{4).-4 C j 2 j David C. Patek Director of Public Works DCP/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, Assistant City Attorney (w/copy) File (w/original) I:vEnginecringA09-21 Oakwood Rd Storm VVatcr Facility Trojeet,hdor, utionAContract IntoACHANCE ORDERSVR-2I Page 1 of I Executed Change Order aI Lctter_12-14-II doe CHANGE ORDER# 1 DATED: November 29, 2011 TO: BUTEYN-PETERSON CONSTRUCTION CO., INC. N7337 DAIRYLAND DR SHEBOYGAN WI 53083 Your present contract with the City of Oshkosh, Contract No. 09-21 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I -CONCRETE PAVING $2,259.38 NET INCREASE TO: SECTION II -STORM SEWER $5,334.11 NET INCREASE TO CONTRACT: $7,593.49 CITY OF OSHKOSH BY: �a- Recommended: City Manager axA ,-F' �._ �� , 1 Director of Public Works _f- i Cit t►l= k Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ,114,- C6tiriptroller Ape •ved as to form: City Atto' CONTRACT:09-21 CHANGE ORDER#1 SECTION I-CONCRETE PAVING ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 100. Pavement Removal Square Yards 925.00 922.50 -2.50 $6.22 ($15.55) 101. Driveway Removal Square Yards 50.00 78.80 28.80 $16.42 $472.90 102. 8"Concrete Pavement Square Including Integral Curb Yards 925.00 922.50 -2.50 $40.47 ($101.18) 103. Asphalt Driveway Square Yards 50.00 78.80 28.80 $46.30 $1,333.44 104. Furnish&Install Terrace Square Seed,Fertilizer,and Yards Erosion Mat 545.00 742.15 197.15 $2.89 $569.76 SECTION I-(BID ITEMS 100-104)-SUB-TOTALS $2,376.10 ($116.73) NET INCREASE TO: SECTION I $2,259.38 SECTION II-STORM SEWER DESCRIPTION INCREASE IN DECREASE IN ITEM UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Mobilization 200. Sump 1.00 1.00 $18,683.00 Furnish, Install,Maintain, 201. and Remove Silt Fence Linear 2,400.00 2,400.00 $2.13 Feet Furnish, Install,Maintain, 202. and Remove Inlet Each 11.00 11.00 $100.00 Protection Furnish, Install,Maintain, 203. and Remove Tracking Pad Each 1.00 1.00 $986.00 Strip and Stockpile Topsoil 204. Square 27 860.00 27,860.00 $0.32 Yards Excavation of Detention 205. Basin Lump 1.00 1.00 $144,252.00 Import Clay Material 206. Cubic 12 285.00 0.00 -12,285.00 $0.01 Yards ($122.85) Install Clay Liner 207. Lump 1.00 1.00 $7,985.00 Furnish&Install Medium Square 208. Riprap and Filter Fabric Yards 260.00 285.00 25.00 $20.39 $509.75 Abandon Storm Sewer 209. Linear 439.00 439.00 $33.35 Feet Furnish&Install 29"x45" Linear 210. HERCP Class HE-III Storm Feet 652.00 631.00 -21.00 $82.98 ($1,742.58) Sewer Furnish&Install 29"x45" 211. HERCP Apron Endwall w/ Each 1.00 1.00 $1,582.00 Grate Page 1 of 2 CONTRACT:09-21 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE Furnish&Install Outlet 212. Structure Each 1.00 1.00 $15,120.00 Furnish&Install Manholes Vertical 213. Feet 12.50 12.72 0.22 $435.20 $95.74 Furnish&Install Inlet 214. Maholes Vertical 15.20 15.36 0.16 $431.98 $69.12 Feet Furnish&Install Standard 215. Type 3 Inlet with 18"Sump Each 1.00 1.00 $1,200.00 Install Salvaged Topsoil- Square 216. 6"Depth Yards 14,020.00 14,020.00 $0.26 Install Salvaged Topsoil- Square 217. 12"Depth Yards 5,100.00 5,100.00 $0.52 Haul Excess Topsoil 218. Cubic 4,220.00 4,220.00 $0.53 Yards Furnish&Install Erosion Square 219. Mat Type 1,Class A Yards 7,125.00 7,054.40 -70.60 $0.85 ($60.01) Furnish&Install Wetland 220. Plantings Square 2,815.00 2,815.00 $7.50 Yards Furnish&Install Native Square 221. Seeding and Mulch Yards 11,450.00 10,448.00 -1,002.00 $0.79 ($791.58) Furnish&Install No-Mow Square 222. Fescue Seeding,Mulch, Yards 2,860.00 3,193.20 333.20 $1.07 $356.52 and Fertilizer SECTION II-(BID ITEMS 200-222)-SUB-TOTALS $1,031.13 ($2,717.02) ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION II ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 223 Furnish&install Each Permanent De-watering Well,Re-compact failed liner area due to groundwater,Controlled fill of detention basin. 0.00 1.00 1.00 $7,020.00 $7,020.00 ADDITIONAL WORK:C.O.#1 -(ITEM 223)-SUB-TOTAL $7,020.00 $0.00 NET INCREASE TO: SECTION II $5,334.11 NET INCREASE TO SECTIONS I,II $10,427.23 NET DECREASE TO SECTIONS I,II ($2,833.75) NET INCREASE TO CONTRACT: $7,593.49 Page 2 of 2