Loading...
HomeMy WebLinkAboutPW CNT 11-04/CNG 2(Lalonde) • DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O. Box 1130 Oshkosh,Wisconsin 54903-1130 Ph. (920)236-5065 fax(920)236-5068 OJH<OJ_ ON THE WATER December 14, 2011 Mr. Mike LaLonde LaLonde Contractors, Inc. P.O. Box 070420 Milwaukee, WI 54307-0420 Re: Change Order No. 2 Contract 11-04 Dear-Mr. LaLonde: Enclosed is an executed copy of Change Order No. 2 between the City of Oshkosh and LaLonde Contractors, Inc. regarding the above-mentioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, e David C. Patek Director of Public Works DCP/tIt Enclosure: Change Order No. 2 cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, Assistant City Attorney (w/copy) File (w/original) L9EoginceiingA1I.1)4 Concrete['toting and Utilities Northeast AProjcct_InfonnutionAContract IntoACHANGE ORDERS V I I- Page 1 of I 1)4 Executed Cheege Order g2 Leiter_I 2-4-1 Ldoc CHANGE ORDER# 2 DATED: November 11, 2011 TO: La Londe Contractors, Inc. P.O. Box 070420 Milwaukee, WI 54307-0420 Your present contract with the City of Oshkosh, Contract No. 11-04 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING $260.50 NET INCREASE TO: SECTION II - STORM SEWER $6,822.20 NET INCREASE TO: SECTION III -SANITARY SEWER $18,732.83 NET INCREASE TO: SECTION IV-WATER MAIN $3,736.79 NET INCREASE TO CONTRACT: $29,552.32 CITY OF OSHKOSH BY: rek. _ Recommended: City Manager 6 Pop, Director of Public Works it Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Pe401/4 omptroller Ap j oved as to for 4. City Atli")e CONTRACT:11-04 CHANGE ORDER#2 SECTION I-CONCRETE PAVING ADDITIONAL WORK REQUIRED: C.O.#2-SECTION I ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 10003 Additional equipment, labor,and materials to re- grade the subgrade due to adjustment in grade,per Invoice(048),for work performed on 8/16/11, Lump complete as specified Sum 0.00 1.00 1.00 $260.50 $260.50 ADDITIONAL WORK: C.O.#2-(BID ITEM 10002)-SUB-TOTAL $260.50 $0.00 NET INCREASE TO: SECTION I $260.50 SECTION II-STORM SEWER ADDITIONAL WORK REQUIRED: C.O.#2 - SECTION II ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 20012 Additional equipment, labor,and materials to re- core a 14"hole into MH E- 66 due to telephone conduit conflict,per Invoice(038) for work performed on 7/8/11,complete as Lump specified Sum 0.00 1.00 1.00 $1,656.39 $1,656.39 20013 Additional equipment, labor,and materials to reset an inlet to match field conditions,per Invoice (041),for work performed on 8/12/11,complete as Lump specified Sum 0.00 1.00 1.00 $600.00 $600.00 20014 Additional equipment, labor,and materials to core new holes into MH and inlet due to field design changes, per Invoice(042), work performed on 8/10/11,compelte as Lump specified Sum 0.00 1.00 1.00 $822.83 $822.83 Page 1 of 4 CONTRACT: 11-04 CHANGE ORDER#2 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 20015 Additional equipment, labor,and materials to core hole into MH E-45 to match field conditions, per Invoice (046),for work performed on 8/12/11,complete as Lump specified Sum 0.00 1.00 1.00 $167.90 $167.90 20016 Additional equipment, labor, and materials to remove an old storm sewer stone tunnel in the intersection of Church Avenue and Division Street,per Invoice(049), for work performed on 8/29/11,complete as Lump specified Sum 0.00 1.00 1.00 $1,308.42 $1,308.42 20017 Additional mobilization charge to install an 8" storm lateral at 917 Elmwood, per Invoice (051),for work performed on 9/8/11,complete as Lump specified Sum 0.00 1.00 1.00 $287.50 $287.50 20018 Additional equipment, labor,and materials to excavate for further investigation of stone storm tunnel on Division Street, per Invoice(053),for work performed on 9/14/11, complete as specified Lump Sum 0.00 1.00 1.00 $822.83 $822.83 20019 Additional equipment, labor,and materials to cut a hole into MH C-20 to match field conditions,per Invoice (054),for work performed on 9/22/11,complete as Lump specified Sum 0.00 1.00 _ 1.00 _ $1,156.33 $1,156.33 ADDITIONAL WORK:C.O.#2 -(BID ITEMS 20012-20019)-SUB-TOTAL $6,822.20 $0.00 NET INCREASE TO: SECTION II $6,822.20 SECTION III-SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O.#2-SECTION III ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 30007 Additional equipment, labor,and materials for Rock Excavation,per Invoice(037)for work performed 7/5/11,complete Cubic as specified Yards 0.00 1.00 1.00 _ $100.00 $100.00 Page 2 of 4 CONTRACT: 11-04 CHANGE ORDER#2 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 40011 Additional equipment, labor,and materials to install the 8"water main underneath the 20" concrete water main,due to elevation conflict,per Invoice(050),for work performed on 8/29/11, Lump complete as specified Sum 0.00 1.00 1.00 $1,704.16 $1,704.16 40012 Additional equipment, labor,and materials for downtime waiting for Water Department to shut down main so they could connect water service for the Bed and Breakfast on Church Avenue,per Invoice(052), for work performed on 9/9/11,complete as Lump specified Sum 0.00 1.00 1.00 $935.53 $935.53 ADDITIONAL WORK: C.O.#2 (BID ITEMS 40010-40012)-SUB-TOTAL $3,736.79 $0.00 NET INCREASE TO: SECTION IV $3,736.79 NET INCREASE TO SECTIONS I,II,III,IV $29,552.32 NET DECREASE TO SECTIONS I,II,III,IV $0.00 NET INCREASE TO CONTRACT: $29,552.32 Page 4 of 4 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 Fax(920)236-5068 OfHKOfH ON THE WATER November 11, 2011 Mr. Mike LaLonde LaLonde Contractors, Inc. P.O. Box 070420 Milwaukee, WI 543 07-0420 RE: Contract 11-04 Dear Mr. Parkhurst: Enclosed please find three (3) copies of Change Order #2 to Contract 11-04 in the amount of $29,552.32. It would be most appreciated if you would sign all three (3) copies as Contractor and return them to me as we would like to get this on the next agenda for the Council approval. Enclosed is a self-addressed envelope for your convenience. Sincerely, Pete Gulbronson, P.E. Civil Engineer II PG/ld Enclosures-3 copies cc: File-I1-04 I:\Engineering\11-04 Concrete Paving and Utilities Page 1 of 1 Northeast\Project_Information\Contract Info\CHANGE ORDERS\Change Order #2 letter.doc