HomeMy WebLinkAbout11-537 DECEMBER 13, 2011 11-537 RESOLUTION (CARRIED__7-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 11-08 WITH STONE CREEK CONTRACTORS, LLC FOR THE HUGHES STREET CULVERT REPLACEMENT AT GLATZ CREEK (+$256.45) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: STONE CREEK CONTRACTORS, LLC E1684 Canyon Creek Lane Luxemburg, WI 54217 Net Increase to Contract: $256.45 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. Nos. 561-2010-1799-00000 Storm Water Utility Constr. Work in Progress OfHKOIH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: December 8, 2011 RE: Change Order#1 for Public Works Contract No. 11-08 Stone Creek Contractors, LLC for Hughes Street Culvert Replacement at Glatz Creek (+$256.45) BACKGROUND Change Order #1 for Contract 11-08 is scheduled for consideration by the Common Council at the December 13, 2011 meeting. The contract was originally awarded to Stone Creek Contractors, LLC in August of 2011. This change order finalizes the quantities. ANALYSIS There were no major changes in quantities for this project. The pavement removal and restoration limits were increased slightly over plan, resulting in the small increase in paving cost. The storm sewer costs are lower than bid, due to the elevation of the bedrock being slightly lower than anticipated. The design was modified slightly during construction to eliminate the need to excavate bedrock. FISCAL IMPACT Contract Section Change Order Amount CIP Budget Amount New Contract Total Paving $2,119.65 $28,310.65 Storm Sewer ($1,863.20) $207,200.00 $156,932.80 Total $256.45 $207,200.00 $185,243.45 The entire contract is being paid for by the Storm Water Utility. There is adequate funding available in the 2011 Capital Improvements Budget. RECOMMENDATIONS I recommend approval of the Change Order#1 to Contact No. 11-08 in the amount of$256.45 for Stone Creek Contractors, LLC. Respectfully Submitted, Approved: Steven M. Gohde M k A. Rohloff Asst. Director of Public Works City Manager SMG/tlt I:\Engineering\11-08 Hughes St-Glatz Crk Culvert Replace\Project_In formation\Correspondence\Memd,l 1-08 CO Ol Council Memo_12-8-I1.doc CHANGE ORDER# 1 DATED: November 30, 2011 TO: Stone Creek Contractors, LLC FINAL E1664 Canyon Creek Lane Luxemburg, WI 54217 Your present contract with the City of Oshkosh, Contract No. 11-08 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING $2,119.65 NET DECREASE TO: SECTION II -STORM SEWER ($1,863.20) NET INCREASE TO CONTRACT: $256.45 CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works City Clerk Approved and abcepted: (... S r 1't 1i A i Y'nrl Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 11-08 CHANGE ORDER#1 SECTION I-CONCRETE PAVING ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 1000 Saw cutting,complete as Linear specified Feet 48.00 48.00 $4.00 1010 Pavement removal, Square complete as specified Yards 240.00 270.00 30.00 $4.45 $133.50 1020 Furnish and install gravel Linear shoulder restoration, Feet complete as specified 202.00 202.00 $5.50 1030 8"non-reinforced concrete Square pavement, HES,including Yards 5"aggregate base and grading,complete as specified 240.00 247.50 7.50 $74.70 $560.25 1040 Furnish and install Each pavement ties(epoxy coated),complete as specified 16.00 18.00 2.00 $12.00 $24.00 1050 Furnish and install cold Square weather covering, 1-layer Yards visquine,complete as specified 240.00 247.50 7.50 $1.00 $7.50 1060 Furnish and install cold Square weather covering,2-layer Yards visquine, complete as specified 240.00 0.00 -240.00 $1.50 ($360.00) 1070 Furnish and install cold Square weather covering,2-layer Yards visquine and 6"hay, complete as specified 240.00 0.00 -240.00 $2.00 ($480.00) 1080 Asphaltic concrete Tons pavement, complete as specified 44.00 65.28 21.28 $105.00 $2,234.40 SECTION I-(BID ITEMS 1000-1080)-SUB-TOTALS $2,959.65 ($840.00) NET INCREASE TO: SECTION I $2,119.65 SECTION H-STORM SEWER ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 2014 Remove culverts, complete Lump as specified Sum 1.00 1.00 $10,000.00 2270 Furnish and install 5'x 12' Lump CONSPAN Bridge System, Sum complete as specified 1.00 1.00 $137,000.00 2900 Furnish and install topsoil Square 6"depth,complete as Yards specified 336.00 336.00 $4.00 Page 1 of 2 CONTRACT: 11-08 CHANGE ORDER#1 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 2920 Furnish and install turf Square grass,complete as Yards specified 336.00 336.00 $4.00 2932 Furnish and install Class I, Square Urban,Type A erosion Yards control mat,complete as specified 58.00 58.00 $9.00 2934 Furnish and install Class II, Square Type B erosion control Mat, Yards complete as specified 278.00 278.00 $7.00 2944 Furnish and install light rip- Square rap with filter fabric, Yards complete as specified 230.00 237.60 7.60 $18.00 $136.80 2960 Rock excavation, complete Cubic as specified Yards 20.00 0.00 -20.00 $100.00 ($2,000.00) 2970 Structural fill for concrete Cubic footings,complete as Yards specified 20.00 _ 20.00 $25.00 SECTION II-(BID ITEMS 2014-2970)-SUB-TOTALS $136.80 ($2,000.00) NET DECREASE TO: SECTION II ($1,863.20) NET INCREASE TO SECTIONS I,II $3,096.45 NET DECREASE TO SECTIONS I,II ($2,840.00) NET INCREASE TO CONTRACT: $256.45 Page 2 of 2