Loading...
HomeMy WebLinkAbout11-536 DECEMBER 13, 2011 11-536 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT 11-04 WITH LALONDE CONTRACTORS, INC. FOR VARIOUS CONCRETE PAVING & UTILITY PROJECTS – CENTRAL CITY AREA (+$29,552.32) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: LALONDE CONTRACTORS, INC. P.O. Box 070420 Milwaukee, WI 54307-0420 Net Increase to contract: $29,552.32 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 311-0410-7480-00000 Sidewalk Construction Fund 315-0410-7480-00000 Street Improvement Fund Expenditures 317-0410-7480-03301 Special Assessments Fund – Streets 317-0410-7480-03302 Special Assessments Fund – Sewer 317-0410-7480-03303 Special Assessments Fund – Water 317-0410-7480-03304 Special Assessments Fund – Sidewalks 317-0410-7480-03305 Special Assessments Fund – Storm Water 541-1810-1799-00000 Water Utility Construction Work in Progress 551-1910-1799-00000 Sewer Utility Construction Work in Progress 561-2010-1799-00000 Storm Water Utility Construction Work in Prog. OfHKOIH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: December 7, 2011 RE: Approval of Change Order #2 for Public Works Contract No. 11-04 with LaLonde Contractors Inc. for Various Concrete Paving and Utility Projects—Central City Area (+$29,552.32) BACKGROUND Change Order #2 for Contract 11-04 is scheduled for consideration by the Common Council at the December 13, 2011 meeting. The contract was originally awarded to LaLonde Contractors Inc. in March of 2011. This change order is for additional work required to complete the project. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Concrete Paving—Additional work to match field conditions. • Storm Sewer — Additional work was required to avoid existing utilities and remove/fill a previously abandoned stone sewer. • Sanitary Sewer—Additional work to connect to existing utilities and remove abandon facilities. • Water Main —Additional work was required to avoid existing utilities and to reconnect water laterals. FISCAL IMPACT Contract Section Change Order Amount CIP Budget Amount New Contract Total Concrete Paving $260.50 $1,897,900 $1,453,506.61 Storm Sewer $6,822.20 $2,644,000 $2,239,861.34 Sanitary Sewer $18,732.83 $1,595,300 $1,223,215.34 Water Main $3,736.79 $1,131,800 $1,091,207.84 Total $29,552.32 $7,269,000 $6,007,791.13 Adequate funds are available in the related sections of the 2011 Capital Improvement Budget. RECOMMENDATIONS I recommend approval of the Change Order#2 to Contact No. 11-04 in the amount of+$29,552.32 to LaLonde Contractors Inc. Respectfully Submitted, Approved: 11/7j12.06_ Steven M. Gohde Mark A. Rohloff Asst. Director of Public Works City Manager SMG I.1Engineering\11-04 Concrete Paving and Utilities Northeas0Project_lnformation 1Correspondence\lemo\11-04 CO#2.doc CHANGE ORDER # 2 DATED: November 11, 2011 TO: La Londe Contractors, Inc. P.O. Box 070420 Milwaukee, WI 54307-0420 Your present contract with the City of Oshkosh, Contract No. 11-04 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I -CONCRETE PAVING $260.50 NET INCREASE TO: SECTION II -STORM SEWER $6,822.20 NET INCREASE TO: SECTION III -SANITARY SEWER $18,732.83 NET INCREASE TO: SECTION IV-WATER MAIN $3,736.79 NET INCREASE TO CONTRACT: $29,552.32 CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 11-04 CHANGE ORDER#2 SECTION I-CONCRETE PAVING ADDITIONAL WORK REQUIRED: C.O.#2-SECTION I ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE'IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 10003 Additional equipment, labor, and materials to re- grade the subgrade due to adjustment in grade,per Invoice(048),for work performed on 8/16/11, Lump complete as specified Sum 0.00 1.00 1.00 $260.50 $260.50 ADDITIONAL WORK: C.O.#2-(BID ITEM 10002)-SUB-TOTAL $260.50 $0.00 NET INCREASE TO: SECTION I $260.50 SECTION II-STORM SEWER ADDITIONAL WORK REQUIRED: C.O.#2 - SECTION II ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 20012 Additional equipment, labor,and materials to re- core a 14"hole into MH E- 66 due to telephone conduit conflict,per Invoice(038) for work performed on 7/8/11,complete as Lump specified Sum 0.00 1.00 1.00 $1,656.39 $1,656.39 _ 20013 Additional equipment, labor,and materials to reset an inlet to match field conditions, per Invoice (041),for work performed on 8/12/11,complete as Lump specified Sum 0.00 1.00 1.00 $600.00 $600.00 _ 20014 Additional equipment, labor,and materials to core new holes into MH and inlet due to field design changes,per Invoice(042), work performed on 8/10/11, compelte as Lump specified Sum 0.00 1.00 1.00 $822.83 $822.83 Page 1 of 4 CONTRACT: 11-04 CHANGE ORDER#2 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 20015 Additional equipment, labor, and materials to core hole into MH E-45 to match field conditions, per Invoice (046),for work performed on 8/12/11,complete as Lump specified Sum 0.00 1.00 1.00 $167.90 $167.90 20016 Additional equipment, labor, and materials to remove an old storm sewer stone tunnel in the intersection of Church Avenue and Division Street, per Invoice(049), for work performed on 8/29/11,complete as Lump specified Sum 0.00 1.00 1.00 $1,308.42 $1,308.42 20017 Additional mobilization charge to install an 8" storm lateral at 917 Elmwood, per Invoice (051),for work performed on 9/8/11,complete as Lump specified Sum 0.00 1.00 1.00 $287.50 $287.50 _ 20018 Additional equipment, labor, and materials to excavate for further investigation of stone storm tunnel on Division Street, per Invoice(053),for work performed on 9/14/11, complete as specified Lump Sum 0.00 1.00 1.00 $822.83 $822.83 20019 Additional equipment, labor, and materials to cut a hole into MH C-20 to match field conditions, per Invoice (054),for work performed on 9/22/11,complete as Lump specified Sum _ 0.00 1.00 1.00 $1,156.33 $1,156.33 ADDITIONAL WORK:C.O.#2 -(BID ITEMS 20012-20019)-SUB-TOTAL $6,822.20 $0.00 NET INCREASE TO: SECTION II $6,822.20 SECTION III-SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O.#2-SECTION III ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 30007 Additional equipment, labor,and materials for Rock Excavation,per Invoice(037)for work performed 7/5/11,complete Cubic as specified Yards 0.00 1.00 1.00 $100.00 $100.00 Page 2 of 4 CONTRACT: 11-04 CHANGE ORDER#2 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 30008 Additional equipment, labor, and materials to re- excavate to main to install a 10"X8"tee to match field conditions of lateral,per Invoice(039)for work performed on 8/1/11, Lump complete as specified Sum 0.00 1.00 1.00 $1,344.63 $1,344.63 30009 Additional equipment, labor,and materials to re- excavate the lateral for Harrington Hall and relay with an 8"to match field conditions,per Invoice (040)for work performed on 8/2/11,complete as Lump specified Sum 0.00 1.00 1.00 $6,184.71 $6,184.71 _ 30010 Additional equipment, labor,and materials to cut- in a 8"x6"wye into main for lateral for 942 Elmwood, which was not shown in planset due to section of main not being televised and no record of lateral, per Invoice(043)for work performed on 8/10/11, complete as specified Lump Sum 0.00 1.00 1.00 $3,838.96 $3,838.96 _ 30011 Additional equipment, labor,and materials to remove an old sanitary main 2 feet below the proposed main and repalce with stone backfill, per Invoice(044),for work performed on 8/11/11, Lump complete as specified Sum 0.00 1.00 1.00 $7,264.53 $7,264.53 ADDITIONAL WORK: C.O.#2-(BID ITEMS 30007-30011)-SUB-TOTAL $18,732.83 $0.00 NET INCREASE TO: SECTION III $18,732.83 SECTION IV-WATER MAIN ADDITIONAL WORK REQUIRED: C.O.#2-SECTION IV ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 40010 Additional work,labor,and materials to locate a water service which was 33'off of original locates,per Invoice (045),for work performed on 8/12/11,complete as Lump specified Sum 0.00 _ 1.00 1.00 , $1,097.10 $1,097.10 Page 3 of 4 CONTRACT: 11-04 CHANGE ORDER#2 INCREASE IN DECREASE IN ITEM BID INSTALLED NET NET UNIT DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 40011 Additional equipment, labor,and materials to install the 8"water main underneath the 20" concrete water main,due to elevation conflict,per Invoice(050),for work performed on 8/29/11, Lump complete as specified Sum 0.00 1.00 1.00 $1,704.16 $1,704.16 40012 Additional equipment, labor,and materials for downtime waiting for Water Department to shut down main so they could connect water service for the Bed and Breakfast on Church Avenue,per Invoice(052), for work performed on 9/9/11,complete as Lump specified Sum 0.00 1.00 1.00 $935.53 $935.53 — ADDITIONAL WORK: C.O.#2 (BID ITEMS 40010-40012)-SUB-TOTAL $3,736.79 $0.00 NET INCREASE TO: SECTION IV $3,736.79 NET INCREASE TO SECTIONS I,Ii,III,IV $29,552.32 NET DECREASE TO SECTIONS I,II,III,IV $0.00 NET INCREASE TO CONTRACT: $29,552.32 Page 4 of 4