HomeMy WebLinkAbout0100741-Building (patio)OSHKOSH
ON THE WATER
.lob.Address 2400 NICOLE CT
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner GERALDA/HEIDI TURNER
Contractor OWNER
Category 142 - Decks, Patios, Ramps
No 0100741
Create Date 04/10/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation (~ Poured Concrete (~ Floating Slab (~ Pier (~ Other
(~ Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Concrete patio off the rear of the house, 750 sq. ft. 30' x 20' irrg shaped. Plan on file.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$2,600.00 Plan Approval $0.00 Permit Fee Paid
$30.00 Park Dedication $0.00
Date 04/10/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
Signature
Date
Agent/Owner
OSHKOSH
Address 2400 NICOLE CT WI 54904 - 6400 Telephone Number
OSHKOSH
ON THE WATER
Job Address
Designer
Category
Type
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
2400 NICOLE CT Owner GERALD A/HEIDI TURNER
Contractor OWNER
142 - Decks, Patios, Ramps
· Building (~) Sign (~ Canopy (~ Fence (~) Raze
No 0100741
Create Date 04/10/2003
Plan
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories
Garage 0 Sq. Ft. Baths 0
Foundation (~) Poured Concrete · Floating Slab (~ Pier (~ Other
(~ Concrete Block (~ Post (~) Treated Wood
Occupancy Permit Flood Plain __
Park Dedication # Dwelling Units 0
0 Ft.
Size
[] Projection J
Canopies 0
Signs 0
Height Permit
# Structures
Use/Nature ;FP,/ Concrete patio off the rear of the house, 750 sq. ft. 30' x 20' irrg shaped. Plan on file.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation $2,600.00
Issued By: (~'~
Plumbing Contractor
Plan Approval $0.00 Permit Fee Paid
[] Permit Voided
$30.00 Park Dedication $0.00
Date 04/10/2003 FinallO.P. 00/00/0000
In the performance of.thi~work ?g~e.tj~ perform.~JJ/work pursuant to rules governing the described construction.
Signature '~ ,.~/~_j~,_[.~~ _JAJ~./1.~ Date
Agent/Owner
Address 2400 NICOLE CT OSHKOSH WI 54904 - 6400 Telephone Number
160.00'
2420
120.24'
DISCLAIMER
This map is neither a legally recorded map nor
a survey and it is not intended to be used as one.
This drawing is a compilation of records, data
and information located in various city, county
and state offices and other sources affecting
the area shown and it is to be used for reference
purposes only. The City of Oshkosh is not re-
sponsible for any inaccuracies herein contained.
If discrepencies are found, please contact the
City of Oshkosh.
2400 Nicole Court
City of Oshkosh Wisconsin
Community Development
1" = 30'
41.60'
90.0t
2393-2
Of HKOfH
ON THE WATER
Created by - MLD
N
04/10/03
ZONING/LAND USE COMPLIANCE CHECKUST
JOB LOCATION:
PROPERTY OWNER/CONTRACTOR:
CONSTRUCTION DATA:
· TYPE OF CONSTRUCTION:
---/'-~r~ ~-
New Construction
(i.e. fence, pool, parking lot, sign, etc.)
ZONING
Addition Alteration
COMPLIANCE CHECKLIST
DEFICIENT
COMMENTS
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
TranSitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc.,
when the use is conforming and when no change is proposed.
/~PPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: 3 Z
DATE: