HomeMy WebLinkAboutTask Order No. 11-02 Pursuant to Technical Services Agreement dated 6/1/09 Si*
STRAND
ASSOCIATES,INC.
ENGINE =R
Transmittal Letter
910 West Wingra Drive To: City of Oshkosh WWTP
Madison,WI 53715
Phone: 608-251-4843 233 N. Campbell Road
Fax: 608-251-8655 Oshksoh, WI 54902-3488
Office Locations
From: Tom Foltz
Madison,WI
Joliet,IL Date: May 4, 2011 Project No.: 1382.057
Lexington,KY
Louisville,KY Attention: Steve Brand
Mobile,AL Re: Consolidated Projects 2011
Columbus,IN
Columbus,OH
Indianapolis,IN
Milwaukee,WI
Cincinnati,OH WE ARE SENDING YOU: ® Enclosed ❑ Under Separate Cover
Phoenix,AZ
www.strand.com ❑ Shop Drawings ❑ Change Order ❑ Copy of Letter
❑ Specifications ❑ Drawings ❑ Samples
❑ Other:
Copies Date No. Description
x 5/03/11 Task Order No. 11-02
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑Approved as submitted ❑ Resubmit copies for approval
® For your use ❑Approved as noted ❑ Submit copies for distribution
Z As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑ Other
Remarks: Steve,
Thanks for working with us to get this task order prepared. If you have any questions, call Jeff or
me at your convenience. We will be starting work on this project very shortly.
6-25-- 2c f �
I i fi _ r !Signed: �/
1_7L �' Tomas Foltz.
Copy to: Jeff Rau ��� . o� orrKs
6k '
Document2 ` 1 /t 1` C,p)
J r3�10 d CuA4L cyD
Lo E41,
Sal
STRAND
ASSOCIATES, INC.'
E N G I N E E R S
910 West Wingra Drive Task Order No. 11-02
Madison,WI 53715 City of Oshkosh, Wisconsin(OWNER)
Phone:608-251-4843 and Strand Associates, Inc.®(ENGINEER)
Fax: 608"251-8655 Pursuant to Technical Services Agreement dated June 1, 2009
Office Locations
Madison,WI Project Information
Joliet, IL
Louisville, KY
Lexington,KY Project Name: Consolidated Treatment Plant and Pumping Station Improvement Projects 2011
Mobile,AL City of Oshkosh Contract 11-18
Columbus,IN
Columbus,OH
Indianapolis, IN Project Description: This project includes replacing a central channel gate between the aerated grit
Milwaukee,WI chambers with stop logs; installation of isolation gates on four primary clarifier effluent channels;
Cincinnati,OH
Phoenix,AZ repair of miscellaneous abovegrade primary clarifier concrete; replacement of submerged inlet baffles
on all four secondary rim flow clarifiers; and installation of a natural gas fueled engine generator and
replacement control panel at the Sawyer Creek Lift Station.
www.strand.com
Services Description: Services include design engineering, bidding-related, and construction-related
services.
Scope of Services
ENGINEER will provide the following services to OWNER:
1. Attend project kickoff meeting and monthly design review meetings at OWNER's wastewater
treatment facility.
2. Request available information for the Project facilities and equipment to be replaced.
3. Prepare preliminary design drawings and specifications for OWNER's review and comment at
50 percent and 90 percent project completion points. Assist OWNER with interdepartmental
reviews of project.
4. Prepare an opinion of probable construction cost at 90 percent project completion.
5. Inform the Wisconsin Department of Natural Resources that this is an equipment replacement
project.
6. Distribute bidding documents to contractors using Quest CDN eBidDocTM. Issue required
addenda during bidding period.
7. Prepare bid tabulation and bid review letter for OWNER's use in awarding the construction
contract.
8. Review shop drawings and manufacturer's operations and maintenance manuals for materials
and equipment provided on the Project. Equipment warranties will be collected and given to
OWNER.
9. Review contractor's schedule of values for sufficient detail to review monthly requests for
progress payment. The monthly requests for progress payment will also be reviewed.
10. Review contractor's request for information and prepare required change orders.
SELCity of Oshkosh
Task Order No. 11-02
STRAND' Page 2
E N G I N E E R S ASSOCIATES, INC.
May 3, 2011
11. Attend preconstruction meeting and monthly construction progress meetings. Meeting notes
will be prepared and distributed to those attending the meetings.
12. Visit construction sites monthly as required during construction to determine that the
contractor's work is in general agreement with the contract documents. OWNER will provide
the Resident Project Representative for daily contact with the contractor.
13. Prepare a list of items to be completed or corrected at substantial completion and
communicate with OWNER to update and monitor contractor's final completion of the
project.
14. Complete a final review of the Project with OWNER's representative prior to recommending
final payment to contractor.
15. Prepare record drawings based on drawings provided to ENGINEER from OWNER and
maintained by contractor during construction.
Compensation
OWNER shall compensate ENGINEER for Services under this Task Order on an hourly rate basis
plus expenses an estimated fee of$130,000.
Schedule
Services will begin upon execution of this Task Order, which is anticipated on May 20, 2011. Services
are scheduled for completion on July 31, 2012.
TASK ORDER AUTHORIZATION AND ACCEPTANCE:
ENGINEER: OWNER:
STRAND ASSOCIATES, INC. ' CITY OF OSHKOSH
w J
Matthew S.R hard�� Da
te Mark A. Rohloff !� Date
Corporate Secretary City-Ianager
—� j P)--
• Pamela R. Ubrig Da -
G�_
City Clerk 1 �'r'' !
,o,c 4-/x.,1,0,,
�pr,t t0 S. (4,.Pr5 Date
055'City Attorney
P g_e_„, $),,--/„
Peggy Ste .k. Date
Director of Finance
TLF:rap:mro R:\WAD\Documents\Agreements1O\Oshkosh,City of(WI)\TechSrvcs.2009-20I 1\T0\201 i',1382.057.11-02.docx