Loading...
HomeMy WebLinkAboutTask Order No. 11-01/Strand Associates (PW 11-17) RECEIVED STRAND JUL - 8 2011 ASSOCIATES, INC.. E N G I N E E R S DEPT. OF PUBLIC WORKS OSHKOSH, WISCONSIN 910 West Wingra Drive Madison, WI 53715 Phone: 608 - 251 -4843 Task Order No. 11 -01 Fax: 608 -251 -8655 City of Oshkosh, Wisconsin (OWNER) Office Locations and Strand Associates, Inca (ENGINEER) Pursuant to Technical Services Agreement dated June 1, 2009 Madison, WI Joliet, IL Louisville, KY Lexington, KY Project Information Mobile, AL Columbus, IN Columbus, OH Project Name: Sawyer Creek Channel Improvements, Contract 11 -17 Indianapolis, IN Milwaukee, WI Cincinnati, OH Project Description: Sediment Removal and Profile Adjustments of Sawyer Creek. Phoenix, AZ Scope of Services www.strand.com ENGINEER will provide the following services to OWNER: 1. Conduct sediment sampling in accordance with NR347 and provide results to OWNER and Wisconsin Department of Natural Resources (WDNR). 2. Communicate with WDNR regarding project. 3. Prepare design level proposed hydraulic conditions model to incorporate the proposed project into the Westfield Street Bridge Proposed Condition Model prepared under Task Order No. 10 -05 Westfield Street Bridge Replacement and Approach. This will replace the planning level model completed under Task Order No. 10 -05. 4. Prepare and submit a water resources application in accordance with Chapter 30 for project permits to OWNER, United States Army Corps of Engineers, and WDNR for review and approval. 5. Prepare drawings, specifications, and opinion of probable construction cost for the proposed project. 6. Communicate with WDNR and the Federal Emergency Management Agency (FEMA) beyond those listed in Amendment No. 1 to Task Order No. 10 -05. A physical map revision (PMR) will be required as three or more FEMA map panels will be affected. It is anticipated only one PMR for the bridge and channel improvements will be required. If separate PMRs are required, the additional PMR will be provided by an amendment to this Task Order. 7. Prepare streambank restoration plans for up to 500 feet of streambank in up to four separate locations. City of Oshkosh Task Order No. 11 -01 STRAND Page 2 ASSOCIATES. INC.° ENGINEERS July 5,2011 8. Delineate wetlands, identify wetland impacts, and determine compensation for wetland loss, if necessary, in conjunction with WDNR. Wetland mitigation drawings for the project may be provided through an amendment to this Task Order. 9. Conduct postconstruction survey of Sawyer Creek between North Koeller Street and Sawyer Street. Service Elements Not Included In addition to those Service Elements Not Included provided in the associated Technical Services Agreement, the following services are not included in this Task Order. If such services are required, they will be provided as noted. 1. Environmental Analysis: This type of service by ENGINEER will be provided through a separate task order with OWNER. It is anticipated the environmental analysis and decision on the need for an environmental impact statement (EIS) form will be completed by WDNR. 2. Environmental Impact Statement: This type of service by ENGINEER will be provided through a separate task order with OWNER should WDNR environmental analysis determine an EIS is necessary. 3. Services Related to Public Hearing for Permitting: This type of service by ENGINEER will be provided through a separate task order with OWNER. Compensation OWNER shall compensate ENGINEER for Scope of Services under this Task Order on an hourly rate basis plus expenses for a not -to- exceed fee of $92,500. Schedule Services will begin upon execution of this Task Order, which is anticipated on July 12, 2011. Services are scheduled for completion on June 30, 2012. Construction is anticipated in late fall, early winter. Date Notice to Proceed July 2011 Bid Documents Complete September 2011 Advertise and Bid September /October 2011 Award October 2011 Construction November /December 2011 Postconstruction Survey January 2012 PMR to FEMA/WDNR March 2012 MAY:d1h\R:\ MAD\ Documents \Agreements \O \Oshkosh, City of (W1)1TechSrvcs.2009- 2011 \TO\2011 \1382.031.11- 01.docx Sal City of Oshkosh Task Order No. 11 -01 STRAND Page 3 ASSOCIATES, INC." ENGINEERS July5,2011 TASK ORDER AUTHORIZATION AND ACCEPTANCE: ENGINEER: OWNER: STRAND ASSOCIATES, INC. CITY OF OSHKOSH — C 7/7/// // / / ?�# 1 /V Matthew 5. Richards Date Mark1/4A. Rohloff ate Corporate Secretary City Manager Pamela R. Ubrig Date City Clerk — 4 j- DAJJO nn L I renson Date City Attorney g e-a 1 0 /SA Peggy e o ° Date Director of Finance MAY :dlh1R:\ MAD\ Documents\Agreements \O1Oshkosh, City of (WI)1TechSrvcs.2009- 2011 \TO \2011 \1382.031.11- 01.docx