Loading...
HomeMy WebLinkAboutState/Municipal Agreement WIS 26-WIS 21 C/ZO ,oscolvs,N Division of Transportation Jim Doyle, Governor System Development __} Frank J. Busalacchi, Secretary R Northeast Regional Office Internet web site: www.dot.wisconsin.gov i st 944 Vanderperren Way Ni Green Bay, WI 54304 CONNECTING Facsimile phone: (920)492. WISCONSIN E -mail: greenbay.dtsdedot.wi.00v April 12, 2010 David Patek RECEIVED City of Oshkosh 215 Church Avenue APR 1.4 2010 PO Box 1130 Oshkosh, WI 54902 DEPT. OF PUBLIC WORKS OSHKOSH, WISCONSIN I have attached three copies of the "State/Municipal Agreement" for Project 1120 -10 -83 which is for the 9 Avenue lighting. This project will install the black lighting around the four roundabouts on 9 Avenue constructed with the US 41 project in 2011. There is no cost to the City of Oshkosh but details of the City's responsibility of maintenance and payment of the power usage is defined. ,--------"' 5' /2.- tow T 7;1.. 4 -It - Please return 2 signed copies as early as possible to keep the project on schedule. If you have any questions, feel free to contact me at 920 - 492 -0142. Dip Sincerely, I „ j , la, °�'''�""`�) CC CA-n /z,n-11;1141, A41, CtAit-• trp) Tom Buchholz, P.E. Project Manager • r bt f1 O 65 Enc. C r MAY CITY CLERK'S OFFICE DATE: April 12, 2010 STATE / MUNICIPAL AGREEMENT I.D.: 1120 -10 -83 FOR A HIGHWAY: US 41 LENGTH: 0.000 HIGHWAY IMPROVEMENT PROJECT LIMITS: WIS 26 — WIS 21 COUNTY: Winnebago FILE: 06-14 The signatory City of Oshkosh, hereinafter called the Municipality, through its undersigned duly authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to initiate and effect the highway or street improvement hereinafter described. The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2), and (3) of the Statutes. NEEDS AND ESTIMATE SUMMARY: Existing Facility (describe and give reason for request): US 41 will be reconstructed from four to six lanes from STH 26 - Breezewood Lane. US 41 has reached its capacity and upgrading capacity will meet the future needs of the travelling public along with improving safety. Proposed Improvement (nature of work): Install lighting for the roundabouts at 9 Avenue /Koeller ; 9 Avenue /Washburn ; and US 41 ramps & 9 Avenue; Describe non - participating work included in the project contract: None Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality: None PHASE ESTIMATED COST Total Federal / State Municipal Estimated Cost Funds % Funds Construction Project ID 1120 -10 -83 Category 0010 — Roundabout Lighting $ 140,000 $ 140,000 100 $ 0 0 TOTAL COST DISTRIBUTION: $ 140,000 $ 140,000 1 1 $ 0 This request is subject to the terms and conditions that follow and is made by the undersigned under proper authority to make such a request for the designated Municipality and upon acceptance by the State shall constitute agreement between the Municipality and the State. Signed for and in behalf of City of Oshkosh Municipality See Page 1A May 12, 2010 Name Title Date Signed for and in behalf of the City of Oshkosh Mark A. Rohloff, City Manager _ • 4 . . . P tIMEWN t.tt U-4. Lying Lor ...non, City Attorney )kliP3 ,NikYo Peggy 'S ee o, Director of Finance I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. lA TERMS AND CONDITIONS: 1. The initiation and accomplishment of the improvement will be subject to the applicable Federal and State regulations. 2. The Municipality will pay to the State all costs incurred by the State in connection with the improvement which exceed Federal /State financing commitments or are ineligible for Federal /State financing. 3. Funding of each project phase (construction) is subject to inclusion in an approved program. Federal aid and/or State transportation fund financing will be limited to participation in the costs of the following items as specified in the estimate summary: a) New installations of street lighting. 4. Work necessary to complete the improvement to be financed entirely . by the Municipality or other utility or facility owner includes the following items: a) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone telegraph, fire or police alarm facilities, parking meters, and similar utilities. b) Repair damages to roads or street caused by reason of their use in hauling materials incidental to the improvement. 5. As the work progresses, the Municipality will be billed for work completed which is not chargeable to Federal / State funds. Upon completion of the project, a final audit will be made to determine the final division of costs. 6. If the Municipality should withdraw the project, it will reimburse the State for any costs incurred by the State in behalf of the project. 7. The work will be administered by the State and may include items not eligible for Federal / State participation. 8. Install black street lighting which includes all lighting within the 9 Avenue Interchange project limits. 9. Maintain all street lighting within the roundabouts of 9 Avenue/US 41 ramps, which includes, but is not limited to, the responsibility for the energy, operation, maintenance, and replacement of the lighting system (including associated costs). 10. The Municipality will at its own cost and expense: a) Maintain all street lighting within the roundabouts at 9 Avenue /Washburn Street and 9th Avenue /Koeller Street, which includes, but is not limited to, the responsibility for the energy, operation, maintenance, and replacement of the lighting system (including associated costs). 9. Basis for Local Participation: Category 010: Installation of the lighting for the roundabouts is paid at 100% Federal /State. 2