Loading...
HomeMy WebLinkAboutStrand Associates, Inc/Westfield Street Bridge Replacement and Approach City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 OfHKOJH ON THE WATER C November 17, 2010 NOV 8 2n OFFin tiF Mr. Matthew Yentz Strand Associates, Inc. 910 W. Wingra Drive Madison, WI 53715 Re: Agreement for Westfield Street Bridge Replacement and Approach Dear Matt: Enclosed please find an executed copy of the agreement between the City of Oshkosh and Strand Associates regarding the above mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, ,00 aAR -o(., C. a�e.lz, /c)2.)-v David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original) Sa STRAND ASSOCIATES, INC :` E N G I N E E R S 910 West Wingra Drive Madison, WI 53715 Task Order No. 10 -05 Phone: 608- 251 -4843 Fax: 608- 251 -8655 City of Oshkosh, Wisconsin (OWNER) and Strand Associates, Inc. (ENGINEER) Office Locations Pursuant to Technical Services Agreement dated June 1, 2009 Madison, WI Joliet, IL Louisville, KY Project Information Lexington, KY J Mobile, AL Columbus, IN Project Name: Westfield Street Bridge Replacement and Approach Columbus, OH Indianapolis, IN Milwaukee, WI Project Description: Bridge replacement and approach work for Westfield Street Bridge Cincinnati, OH (P -70 -0710) over Sawyer Creek. Phoenix, AZ Scope of Services www.strand.com ENGINEER will provide the following services to OWNER: 1. Conduct an initial archaeological and historical screening to identify potential sites that may impact the project. If sites are identified, the results of the screening will be provided to OWNER. 2. Conduct an initial phase 1 -type screening to identify potential hazardous material (Haz Mat) sites that may impact the project. The screening will include review of readily available state and federal databases, review of Sanborn Fire Insurance Maps, and one site visit to the project location and completion of one Site Summary Form. If Haz Mat sites are identified, the results of the screening will be provided to OWNER. OWNER acknowledges that ENGINEER is not, by virtue of this Task Order, the owner or generator of any waste materials generated as a result of the Hazardous Materials /Contamination Assessments services performed by ENGINEER under this Task Order. 3. Conduct sediment sampling in accordance with NR 347 and provide results to OWNER and Wisconsin Department of Natural Resources (WDNR). 4. Identify wetland impacts and determine compensation for wetland loss, if necessary, in conjunction with WDNR, following the procedures in TRANS 207 and the Wisconsin Department of Transportation Wetland Mitigation Banking Technical Guideline dated March 2002. Wetland mitigation drawings for the project may be provided through an amendment to this Task Order. 5. Evaluate the potential for discharge of fill materials into the Waters of the United States, in accordance with the provisions of the Clean Water Act and Chapter TRANS 207, and prepare the necessary permit application. Preparation of an individual Section 404 permit application for submittal to the United States Army Corp of Engineers may be provided through an amendment to this Task Order. 6. Prepare and submit a Water Resources Application in accordance with TRANS 207 for project permits to OWNER and WDNR for review and approval. Sa City of Oshkosh Task Order No. 10 -05 STRAND Page 2 ASSOCIATES. INC." November 5, 2010 E N G I N E E R S 7. Obtain existing utility maps from known utilities within the project area and obtain input from the utility facility owners to establish features of the project that will affect utility facilities. 8. Assist OWNER in holding one informational meeting at approximately 30 percent completion to acquaint the public with the concepts of the project. 9. Attend up to four design meetings with OWNER to discuss applicable features of the project. 10. Conduct topographic survey of project area. 11. Conduct topographic survey of Sawyer Creek from Koeller Street to Sawyer Street. 12. Locate the necessary section corners and provide information for the preparation of plats and acquisition of rights -of -way and property. Surveys will include ties to two section corners, quarter section corners, or to street lines or block corners in platted areas. These ties will be in sufficient detail to permit the preparation of proper legal descriptions of the lands acquired. Ties to more than two section corners may be provided through an amendment to this Task Order. 13. Monument the new right -of -way boundaries. 14. Assist OWNER in engaging the services of a geotechnical consultant to perform the necessary geotechnical investigations and make recommendations on design criteria. 15. Prepare road drawings and submit to OWNER for review. It is anticipated that 250 feet of approach services will be necessary for the drawings. Additional approach length may be provided through an amendment to this Task Order. 16. Provide hydrology calculations to be used in the bridge analysis. Submit the calculations to OWNER and WDNR for review. 17. Provide hydraulic calculations to be used in the bridge analysis consisting of use of the regulatory model after converting to a HEC -RAS model. Submit the calculations to OWNER and WDNR. Up to three bridge span options will be modeled. 18. Investigate the need for a CLOMR/LOMR from the Federal Emergency Management Agency (FEMA) based upon the hydraulic calculations for the proposed bridge. If a CLOMR/LOMR is necessary it may be provided through an amendment to this Task Order. 19. Provide hydraulic calculations in the Sawyer Creek Stormwater Plan HEC -RAS model to assess the feasibility of coupling a larger bridge span with reduced or eliminated channel improvements (streambank restoration and dredging) upstream and downstream of the Westfield Street Bridge. 20. Prepare a structure survey report/hydraulic report and submit to OWNER for review, including copies of the design computations. 21. Provide preliminary structure drawings to OWNER for review. MAY :dIh \R:\MAD\ Documents \ Agreements \O1Oshkosh, City of (WI) \TechSrvcs.2009- 2011 \TO12010 \1382.031 10- 05.docx Sal City of Oshkosh Task Order No. 10 -05 STRAND Page 3 ASSOCIATES, INC 's November 5, 2010 E N G I N E E R S 22. Prepare structure drawings and submit to OWNER for review, including copies of the design computations. 23. Prepare a Right -of -Way Plat. Include the Right -of -Way Plat information on the Plan and Profile Sheets. 24. Provide right -of -way descriptions for up to four individual parcels of land to be acquired as right -of -way for the project. Descriptions will be by metes and bounds or, in the case of platted property, by suitable reference to the platted data. For all unplatted property, the descriptions will be referenced to and tied into the pertinent section or quarter section corners. The descriptions will be tied to the project and will be prepared on conveyance documents. Current tax records will be used to determine ownership of properties and premises where a temporary right -of -way for the project is to be acquired. 25. Submit the Right -of -Way Plat and descriptions to OWNER for review and filing. 26. Field- locate and temporarily mark the new right -of -way boundaries in a manner that will facilitate the appraisal of the affected parcels. 27. Prepare plans, specifications, and estimate for an anticipated delivery date of April 1, 2011. OWNER's Responsibilities 1. Assist ENGINEER by placing at ENGINEER's disposal all available information pertinent to this project including record drawings, existing right -of -way plat and drawings, horizontal and vertical control survey data, traffic projections, title searches, section and quarter section location and descriptions, and any other data relative to the scope of this project. 2. Retain the services of a soils consultant to provide any necessary geotechnical evaluation and recommendations. 3. Provide right -of -way and easement acquisition services, including appraisals as required by the Right -of -Way Plat. Service Elements Not Included In addition to those identified under the referenced Technical Services Agreement, the following services are not included in this Task Order. If such services are required, they shall be provided as noted. 1. CLOMR/LOMR Application to FEMA: Any services of this type shall be provided through an amendment to this Task Order or through a separate task order. 2. Archaeological Survey: Any services requiring locating archaeological sites shall be provided through an amendment to this Task Order or through a separate task order. 3. Historical Survey: Any service requiring documentation of historical sites shall be provided through an amendment to this Task Order or through a separate task order. MAY : dlh \R:\MAD\Documents\Agreements \O \Oshkosh, City of (WI) \TechSrvcs. 2009 - 2011 \TO\2010 \1382.031.10- 05.docx City of Oshkosh Task Order No. 10 -05 STRAND Page 4 ASSOCIATES. November 5, 2010 E N G I N E E R S Compensation OWNER shall compensate ENGINEER for Services under this Task Order on an hourly rate basis plus expenses for a not -to- exceed fee of $115,000. The not -to- exceed fee will not be exceeded without prior notice to and agreement by OWNER but may be adjusted for time delays, time extensions, amendments, and changes in the Scope of Services. Any adjustment will be negotiated based on ENGINEER's increase in costs caused by delays, extensions, amendments, or changes. Schedule Services will begin upon execution of this Task Order, which is anticipated on November 15, 2010. Services are scheduled for completion on May 15, 2011. TASK ORDER AUTHORIZATION AND ACCEPTANCE: ENGINEER: OWNER: STRAND ASSOCIATES, INC. CITY OF OSHKOSH / k W * e p , L /.S /� 6 - 1 7- 7-0i b /` l Matthew S. Richards Date Mark Rohloff Date Corporate Secretary City Manager 111L . 11X s - kji /0 P: . ���• ' ` ' 0. j: Date b City CI,. CRifdtek elk v L L• renson Date City • orney // ////d eggy Stfe Date Director of Finance MAY :dlh1R: \MAD\Documents \ Agreements \O \Oshkosh, City of (WI) \TechSrvcs.2009- 2011 \TO\2010 \1382.031.10- 05.docx