HomeMy WebLinkAboutLibbey/Nicolet Basins Storm Sewer System/Amendment 3 AMENDMENT NUMBER 3 August 29, 2011 AECOM Project Number: 60184323 Client Contract Number: RES # 08 -341 (ET 106523) Project Title: Libbey & Nicolet Basins Storm Sewer System Hydraulic Analysis and flood Control Alternatives Client Name: City of Oshkosh Phone #: (920) 236 -5065 Address: 215 Church Ave. P.O. Box 1130 Fax #: (920) 236 -5068 City: Oshkosh State: WI Zip: 54903 AMENDMENT DESCRIPTION: Summary of added scope items: 1. Conduct evaluation of additional options for stormwater management as described on Attachment A to this document CONTRACT TIME: Contract completion date prior to this Amendment: 12/31/2010 Schedule Increase by this Amendment: 12 month Revised completion date including this Amendment: 12/31/2011 CONTRACT COST: Original Contract Amount: $ 41,500.00 Sum of all previous approved Amendments: $ 33,181.00 Estimated Cost Increase/ by this Amendment: $ 13,630.00 Revised Estimated Contract Price including this Amendment: $ 88,311.00 In all other respects, the Agreement remains the same. APPROVED FOR CITY OF OSHKOSH APPROVED FOR CONSULTANT By: C.- _ - By: Name (print): Mark A. Rohloff Name (print): Richard C. Hope Title: City Manager Title: Vice President Date: I` %L -2e + I Date: g / By: ♦/oz. ■ !�I Pe � gy A S e no,, Fi s nce Director B r y. 'V .fit • orenson, Gi Att• e - NS By: �1�. __ - Pamela R' Ubr ity C__ rk Date: `� (� 1 C:\Documents and Settings \milanowskir \Local Settings \Temporary Internet Files \Content .Outlook \Y8BPXR9Z\Libbey Amendment 3 form and scope.doc Page 1 of 3 AECOM ATTACHMENT A Scope of Work and Budget for Amendment #3 Libbey / Nicolet Basin Hydrologic and Hydraulic Analysis • August 15, 2011 ADDITIONAL SCOPE Under Amendment #2 to the project, Alternatives 9, 10, and 11 were evaluated for flood control and pollution control effectiveness. Based on this effort, the City decided that Alternative 10 and a new approach (Alternative 12) may be the best approach to manage stormwater in the project area. It was also decided that larger storm events would be modeled to evaluate flood control performance of Alternatives 10 and 12. Amendment #3 describes the scope and budget necessary to conduct this additional work. Additional model runs and alternatives will be conducted for further analysis of stormwater management project area. The analysis will build upon existing XP SWMM model for the flood management analysis. The rain events to be analyzed under this amendment are described in the table below. Rain Event to Model in XP SWMM Alternative 10 yr 25 yr 100 yr Alternative 10 X X Alternative 12 X X X Alternative 10a X X X Alternative 12 a X X X Description of Alternatives: Alternative 10: Detention basin located NW of E. Packer and N. Main Detention basin located W of N. Main between E. Packer and Libbey Ave. Detention basin located N. of Bacon Ave between Jackson and N. Main Alternative 10a: Same as 10 with addition of box culvert system on Jackson St. Alternative 12: Detention basin located W of N. Main between E. Packer and Libbey Ave. Detention basin located N. of Bacon Ave between Jackson and N. Main Alternative 12a: Same as 12 with addition of box culvert system on Jackson St. Work items under this amendment include 1) Develop a conceptual layout for each of the new detention basins to be considered. 2) Run the XP SWMM model (10 -yr, 25 -yr & 100 -yr storm events) as indicated in table above 3) Evaluate each management scenario described above based on the reduction in flooding. 4) Prepare a planning -level cost estimate for each of the management scenario. 5) Evaluate the water quality benefits of each proposed wet detention basin. The analysis will incorporate the results of the North High School Area Wet Detention Basin. The water quality benefits will be evaluated using WinSLAMM, WinDetpond, and data available from the Citywide Stormwater Management Plan. C:\Documents and Settings\milanowskir \Local Settings \Temporary Internet Files\ Content. Outlook \Y8BPXR9Z\Libbey Amendment 3 form and scope.doc Page 2 of 3 ACOM 6) Conduct two web -based and one face -to -face meeting with City staff to discuss the results. 7) Conduct a feasibility evaluation to re -route relief sanitary sewer between Geneva St / Smith Ave and Wisconsin St. (to remove existing sanitary / storm sewer conflict near intersection of Jackson St. and Bacon Ave.) 8) Update report to include the results of the additional analysis described above. C:\Documents and Settings \milanowskir \Local Settings\Temporary Internet Files \Content .Outlook \Y8BPXR9Z1Libbey Amendment 3 form and scope.doc Page 3 of 3 ,AECOM /),, COA AECOM 715 341 8110 tel /'��` 200 Indiana Avenue 715 341 7390 fax Stevens Point, WI 54481 www.aecom.com August 30, 2011 James Rabe City of Oshkosh Engineering Department 215 Church Avenue PO Box 1130 Oshkosh, WI 54903 -1130 Subject: Amendment No. 3 Libbey and Nicolet Basins Storm Sewer System Hydraulic Analysis and Flood Control City of Oshkosh, Wisconsin Client Contract No. RES 08 -341 AECOM Project No. 60184323 (formerly 106523) Dear Mr. Rabe: As per the request of Jim Bachhuber from our firm, I am enclosing two copies of Amendment No. 3 for the subject project. This document has been signed by our office. If approved, please sign both copies of the amendment, retain one copy for your files, and return one signed copy to Jim at the address shown below: James Bachhuber AECOM 1350 Deming Way, Suite 100 Middleton, WI 53562 If you have any questions, please contact me at (715) 342 -3005. Thank o Sincerely, /z - Zv t r f r AECOM � - ` te a 2 " Sys 1 �� � c_•\ /ebl■ael- Renita Milanowski Administrative Assistant ( ; 't cr,•,'v Enclosures: As Noted c /enc: James Bachhuber, AECOM - Madison ' J I: \work\$admin\ office _admin \npr\rabe_110830_rim.docx � Cd