HomeMy WebLinkAboutTipler/Landmark Plaza Stormwater Improvements/Amendment 3 . _
s ca
STRAND
ASSOCIATES, INC.'
E Ni G i NI 7 E R !■ ' t
Transmittal Letter
910 West Wingra Drive To: City of Oshkosh
Madison, WI 53715
Phone: 608 -251 -4843 215 Church Avenue
Fax: 608 - 251 -8655
P.O. Box 1130
Office Locations Oshkosh, Wisconsin 54903 -1130
From: Jon H. Lindert, P.E., LEED AP
Madison, WI
Joliet, IL Date: February 24, 2011 Project No.: 1- 104.041
Lexington, KY
Louisville, KY Attention: James Rabe, P.E., CPESC
Mobile, AL Re: Tipler and Landmark Plaza Stormwater Improvements
Columbus, IN
Columbus, OH
Indianapolis, IN
Milwaukee, WI
Cincinnati, OH WE ARE SENDING YOU: ® Enclosed ❑ Under Separate Cover
Phoenix, AZ
www.strand.com ❑ Shop Drawings ❑ Change Order LI Copy of Letter
❑ Specifications ❑ Drawings ❑ Samples
❑ Other:
Copies Date No. Description
3 Amendment No. 3
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted Ell Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ® o ther For sign and date all three copies and return two copies to
Strand - - --
r
Remarks: James - Attached are three copies for City to sign and date.
l :> rl / - 'I-, // )
Thanks,
- -- -Jon-
.
T el n
l 1 L---
lu�t�� Signed: i 61, Lr , c;oY 0 /
-'tti� 0. S in i
/4 1 � ` " 1" �? Jon . Li e , P LEED AP
�ew -1 (ta: . I j r.- -
Copy to: /
2 f --- t ' c c,, 1.� C C u - 1 h. ( tt -� 1. tTta c l,- <<
p
L i t _AAA' Lin, i-, I (1l) I 1 ti tt (.' )
S:1 MAD11�i00-- 1 39 911 3 8210411Wrd�Engineering Cost\Transmittal Amendment No. 3 Tipler LMRdocz
Sa
STRAND
ASSOCIATES, INC..'
E N G I N E E R S
February 17, 2011
910 West Wingra Drive
Madison, WI 53715
Phone: 608-251-4843
Fax: 608 - 251 -8655 City of Oshkosh
215 Church Avenue
Office Locations P.O. Box 1130
Madison, WI Oshkosh, WI 54903 -1130
Joliet, IL
Louisville, KY Attention: Mr. David C. Patek, P.E., Director of Public Works
Lexington, KY
Mobile, AL
Columbus, IN Re: Amendment No. 3 to the February 23, 2009, Agreement for
Columbus, OH Hydraulic /Hydrologic Modeling and Design Services
Milwaukee, ukee, IN Tiler and Landmark Plaza Stormwater Improvements
Milwaukee, WI p P
Cincinnati, OH
Phoenix, AZ
This is Amendment No. 3 to the referenced Agreement.
www.strand.com Under Scope of Services, ADD the following:
"Bid Package No. 2 Changes
1, Provide design changes to the storm sewer alignment from Station 26 +55 to Station 28 +83
to accommodate OWNER - requested alignment changes.
2. Provide design changes to the grading and storm sewer from Station 14 +50 to
Station 15 +75 to accommodate OWNER- requested alignment and grading changes.
3. Provide up to four design change iterations to Junction Chamber JC -1 to accommodate
OWNER- requested alternative alignments.
4. Provide one additional submittal of the drawings and specifications to OWNER
incorporating the changes.
5. Provide one additional meeting with OWNER to discuss the additional submittal
including preparation and meeting minutes.
6. Provide a final submittal of drawings and specifications to OWNER incorporating
changes.
7. Provide resubmittal of state wage rates.
8. Additional Services to accommodate OWNER - requested conversion of Bid Documents to
its 2011 standards. Services will include the following:
a. Update the Contract 11 -01 Proposal to be consistent with OWNER's new
standard bid items received on February 7, 2011. Update quantities to be
consistent with standard bid items.
b. Update the Special Conditions to be consistent with OWNER's new standard
specifications and bid items received on February 7, 2011.
c. Update Sheet 2 of the drawings to be consistent with OWNER's new standard bid
items received on February 7, 2011. Make modifications to notes on drawings to
be consistent with OWNER's 2011 Standards.
Sa City of Oshkosh
Page 2
STRAND February 17, 2011
ASSOCIATES, INC.
E N G I N E E R S
d. Submit a 95 percent complete submittal incorporating these Services.
e. Prepare for, attend, and create meeting minutes for a 95 percent review meeting
(web- based).
f. Submit a final submittal of drawings and specifications incorporating requested
changes from the 95 percent review meeting.
g. Proposal, Special Conditions, and Sheet 2 will only be updated for OWNER's
standard specifications and bid items received by the close of business on
Monday, February 14, 2011. It is anticipated that this will include specification
sections described under OWNER's Responsibilities. It is also anticipated that
ENGINEER will not receive OWNER's standard Paving Section (Section 1000s).
ENGINEER will use Special Provisions for bid items for which OWNER does not
provide standard bid items and specifications."
Under Compensation, CHANGE $131,520 to "$170,520."
Under Schedule, CHANGE November 20, 2009, to "February 28, 2011."
Under OWNER's Responsibilities, ADD the following:
"7. Provide OWNER's standard specifications and bid items."
IN WITNESS WHEREOF the parties hereto have made and executed this Amendment.
ENGINEER: OWNER:
STRAND ASSOCIATES, INC. CITY OF OSHKOSH
2L t- /P/
Matthew S. Richards II ate M 1k. Rohloff Date
Corporate Secretary City Manager
Pamela R. Ubrig at
City Clerk
16 it. 3 -qi -(I
"ynn . LorensolliW Date
City Attorney
sz.„...D3/9/,/
Peggy A. Steen Date
Director of Finance
JHL:mro\R:\ MAD\ Documents \Agreements \O \Oshkosh, City of ( W1) 1Tipler- LndmrkPlzaStrmwtrflnpsModel& Design .2009 \Agr \Amd \1382.041.3.docx