January 13, 2011
Mr. James Bachhuber
AECOM
1350 Deming Way, Suite 100
Middleton, WI 53562
Re: 2010 Roadway CIP H &H Studies — Amendment #4
Dear Jim:
Enclosed please find an executed copy of the Amendment for the 2010 Roadway CIP H &H Studies,
PO # 112360, as referenced above.
If you have any questions, please call our office at (920) 236 -5065. Thank you.
Sincerely,
06, c d 1 C . `P� /GPI ->�
David C. Patek
Director of Public Works
DCP /clm
Enclosure
cc: Pam Ubrig, City Clerk (w /original)
Lynn Lorenson, City Attorney (w /copy)
James Rabe, Civil Engineer II (w /copy)
File Copy (w /copy)
CONTRACT AMENDMENT #: 4 December 20, 2010
AECOM Project Number: 60184440 Client P.O. Number: 112360
(ET 114023)
Project Title: 2010 Roadway CIP H &H Studies
Client Name: City of Oshkosh Phone #: 920 - 236 -5017
Address: 215 Church Ave; P.O. Box 1130 Fax #:
City: Oshkosh State: WI Zip: 54903
AMENDMENT DESCRIPTION: Additional analyses conducted on Division. See attachment
for summary of scope and amendment breakdown...
CONTRACT TIME:
Contract completion date prior to this Change Order: 12/31/2010
Schedule Increase/Decrease by this Change Order:
Revised completion date including this Change Order: 06/30/2011
CONTRACT COST:
Original Contract Amount:: $ 91,990.00
Sum of all previous approved Change Orders $ 53,950.00
Estimated Cost Increase by this Change Order: $ 5,913 .00
Revised Estimated Contract Price including this Change Order: $ 151,853.00
In all other respects, the Agreement remains the same.
APPROVED FOR CITY OF OSHKOSH APPROVED FOR CONSULTANT
BY: �cl By: --e-0717/€S-■
Name (print . Mark A. Rohloff Name (print): Scott C. Solverson
Title: City Manager Title: Vice President
Date: TAI ^r i z , Zo / 1 Date: /Z/ Zo /ZO/
By:
Pe_: A S'-eno, Fin., ce Director
By: , _
% Loren s n, C tt •
By: 4 A " AIM .•)`1
Pamela R. Ubrig, City C erk
Date: __.7.1721N 1Z 2.0I
C:\Documents and Settings\mackem\Local Settings \Temporary Internet Files\ Content .Outlook \T0R8PCZH\Oshkosh 2010 CIP Amendment
4.doc
ACOM
City of Oshkosh
2010 CIP Hydrologic / Hydraulic Storm System Analysis
Out of Scope Items — Amendment #4
December 20, 2010
Division Street Watershed
1. Additional work associated with underground stormwater storage vaults at City Hall location.
• Prepare schematic drawings of 2 layouts for discussion purposes with City Manager
• Prepare cost estimates for underground vaults by structural engineers
Ohio Street Watershed
1. Additional work associated with preparation of a "design memo" for the Ohio Street Drainage
area.
• Draft memo reflecting the changes that were made to the Ohio Street Watershed stormwater
analysis during the 2010 design and construction period.
• Web- meeting with City staff to review comments and finalize memo.
C:\Documents and Settings\mackem\Local Settings \Temporary Internet Files\ Content .Outlook \TOR8PCZH\Oshkosh 2010 CIP Amendment
4.doc