Loading...
HomeMy WebLinkAbout2010 Roadway CIP H&H Studies/Amendment 4 City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 OfHKOJH ON THE WATER January 13, 2011 Mr. James Bachhuber AECOM 1350 Deming Way, Suite 100 Middleton, WI 53562 Re: 2010 Roadway CIP H &H Studies — Amendment #4 Dear Jim: Enclosed please find an executed copy of the Amendment for the 2010 Roadway CIP H &H Studies, PO # 112360, as referenced above. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, 06, c d 1 C . `P� /GPI ->� David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) James Rabe, Civil Engineer II (w /copy) File Copy (w /copy) CONTRACT AMENDMENT #: 4 December 20, 2010 AECOM Project Number: 60184440 Client P.O. Number: 112360 (ET 114023) Project Title: 2010 Roadway CIP H &H Studies Client Name: City of Oshkosh Phone #: 920 - 236 -5017 Address: 215 Church Ave; P.O. Box 1130 Fax #: City: Oshkosh State: WI Zip: 54903 AMENDMENT DESCRIPTION: Additional analyses conducted on Division. See attachment for summary of scope and amendment breakdown... CONTRACT TIME: Contract completion date prior to this Change Order: 12/31/2010 Schedule Increase/Decrease by this Change Order: Revised completion date including this Change Order: 06/30/2011 CONTRACT COST: Original Contract Amount:: $ 91,990.00 Sum of all previous approved Change Orders $ 53,950.00 Estimated Cost Increase by this Change Order: $ 5,913 .00 Revised Estimated Contract Price including this Change Order: $ 151,853.00 In all other respects, the Agreement remains the same. APPROVED FOR CITY OF OSHKOSH APPROVED FOR CONSULTANT BY: �cl By: --e-0717/€S-■ Name (print . Mark A. Rohloff Name (print): Scott C. Solverson Title: City Manager Title: Vice President Date: TAI ^r i z , Zo / 1 Date: /Z/ Zo /ZO/ By: Pe_: A S'-eno, Fin., ce Director By: , _ % Loren s n, C tt • By: 4 A " AIM .•)`1 Pamela R. Ubrig, City C erk Date: __.7.1721N 1Z 2.0I C:\Documents and Settings\mackem\Local Settings \Temporary Internet Files\ Content .Outlook \T0R8PCZH\Oshkosh 2010 CIP Amendment 4.doc ACOM City of Oshkosh 2010 CIP Hydrologic / Hydraulic Storm System Analysis Out of Scope Items — Amendment #4 December 20, 2010 Division Street Watershed 1. Additional work associated with underground stormwater storage vaults at City Hall location. • Prepare schematic drawings of 2 layouts for discussion purposes with City Manager • Prepare cost estimates for underground vaults by structural engineers Ohio Street Watershed 1. Additional work associated with preparation of a "design memo" for the Ohio Street Drainage area. • Draft memo reflecting the changes that were made to the Ohio Street Watershed stormwater analysis during the 2010 design and construction period. • Web- meeting with City staff to review comments and finalize memo. C:\Documents and Settings\mackem\Local Settings \Temporary Internet Files\ Content .Outlook \TOR8PCZH\Oshkosh 2010 CIP Amendment 4.doc A=COM