Loading...
HomeMy WebLinkAboutMelvin Avenue Storm Water Pump Station/Amendment 1 City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1 130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 OJH<OJH ON THE WATER November 18, 2010 Mr. Al Bush AECOM 4135 Technology Parkway Sheboygan, WI 53083 Re: Amendment #1 to Agreement for Melvin Avenue Storm Water Pump Station Dear Al: Enclosed please find an executed copy of the amendment to the agreement between the City of Oshkosh and AECOM regarding the above mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, A v Le.`a . /cf David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) • Lynn Lorenson, City Attorney (w /copy) ; '' ; File Copy (w /copy) 1 ""'9 ; 1 8 ZO iO 9 :11:: ': A=COM AMENDMENT NUMBER 1 TO CONSULTING AGREEMENT DATED December 23, 2009 Project Name: Melvin Avenue Storm Water Pump Station Project Number: 60145509 This Amendment is made between AECOM Technical Services, Inc., ( "ATS ") with offices at 4135 Technology Parkway, Sheboygan, Wisconsin, 53083 and City of Oshkosh ( "CLIENT "), with offices at 215 Church Ave., Oshkosh, WI 54903. AMENDMENT DESCRIPTION: 1. Structural and Architectural design changes related to incorporating a "green" roof system. a. Revisions to the roof details for the green roof and higher parapet. b. Revisions to the building sections and elevations for the higher parapet. c. Revisions to the roof design and overall structural design to incorporate additions to accommodate the "green" roof design elements. d. Writing a new specification for the green roof system which includes the insulation, roof membrane and plant trays. Our intent is to specify green roof trays that will be included as part of the roof system for construction coordination and single- source manufacturer's warrantee. 2. Plan Commission /Architecture Review. a. Preparation of elevations, details and colored 3D perspectives for City use in presentations to the City's Plan Commission /Architecture Review. 3. Acoustical Evaluation of Generator a. Estimate the sound level resulting from generator operation, measured at the asphaltic pavement located due east of the Generator Room. b. Estimate how much sound reduction would be accomplished by a stand of evergreen trees located between the asphaltic pavement and the Generator Room. c. Estimate how much sound reduction would be accomplished by a wood fence located between the asphaltic pavement and the Generator Room. CONTRACT COST: Contract Price prior to this Amendment: $151,800.00 Estimated Cost Increase /Decrease by this Amendment: $ 11,300.00 Revised Estimated Contract Price including this Amendment: $163,100.00 CLIENT confirms reading this document in full. This Amendment, when executed by ATS, is an offer to perform the SERVICES, open for acceptance within 30 days. This Amendment becomes effective on the date CLIENT signs below: In all other respects, the Agreement remains the same. AXOM CLIENT — City of Oshkosh AECOM Technical Services, Inc. By: See Page 3 By: 4i/tia _ "'..l--G 1Zv Steven L. Peterson, PE (Name - Print) Title: Title: Vice President Date: Date: February 25, 2010 h: \data \work \oshkosh\stormwater ps 2009\20100225 amendment no. 1.docx • Signed for and in behalf of the City of Oshkosh Mark A. Rohloff, City Manager 1 Pamela R. Ubrig, City Cler 1 L orenson, Cit' _ 4srney / 4q . Peggy Steeno, Director of Finance I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. 3