November 18, 2010
Mr. Al Bush
AECOM
4135 Technology Parkway
Sheboygan, WI 53083
Re: Amendment #1 to Agreement for Melvin Avenue Storm Water Pump Station
Dear Al:
Enclosed please find an executed copy of the amendment to the agreement between the City of
Oshkosh and AECOM regarding the above mentioned project.
If you have any questions, please call our office at (920) 236 -5065. Thank you.
Sincerely,
A v Le.`a . /cf
David C. Patek
Director of Public Works
DCP /clm
Enclosure
cc: Pam Ubrig, City Clerk (w /original)
•
Lynn Lorenson, City Attorney (w /copy) ; '' ;
File Copy (w /copy) 1 ""'9
; 1
8 ZO iO
9 :11:: ':
A=COM
AMENDMENT NUMBER 1
TO
CONSULTING AGREEMENT DATED December 23, 2009
Project Name: Melvin Avenue Storm Water Pump Station
Project Number: 60145509
This Amendment is made between AECOM Technical Services, Inc., ( "ATS ") with offices at
4135 Technology Parkway, Sheboygan, Wisconsin, 53083 and City of Oshkosh ( "CLIENT "), with offices
at 215 Church Ave., Oshkosh, WI 54903.
AMENDMENT DESCRIPTION:
1. Structural and Architectural design changes related to incorporating a "green" roof system.
a. Revisions to the roof details for the green roof and higher parapet.
b. Revisions to the building sections and elevations for the higher parapet.
c. Revisions to the roof design and overall structural design to incorporate additions to
accommodate the "green" roof design elements.
d. Writing a new specification for the green roof system which includes the insulation, roof
membrane and plant trays. Our intent is to specify green roof trays that will be included
as part of the roof system for construction coordination and single- source manufacturer's
warrantee.
2. Plan Commission /Architecture Review.
a. Preparation of elevations, details and colored 3D perspectives for City use in
presentations to the City's Plan Commission /Architecture Review.
3. Acoustical Evaluation of Generator
a. Estimate the sound level resulting from generator operation, measured at the asphaltic
pavement located due east of the Generator Room.
b. Estimate how much sound reduction would be accomplished by a stand of evergreen
trees located between the asphaltic pavement and the Generator Room.
c. Estimate how much sound reduction would be accomplished by a wood fence located
between the asphaltic pavement and the Generator Room.
CONTRACT COST:
Contract Price prior to this Amendment: $151,800.00
Estimated Cost Increase /Decrease by this Amendment: $ 11,300.00
Revised Estimated Contract Price including this Amendment: $163,100.00
CLIENT confirms reading this document in full. This Amendment, when executed by ATS, is an offer to
perform the SERVICES, open for acceptance within 30 days. This Amendment becomes effective on the
date CLIENT signs below:
In all other respects, the Agreement remains the same.
AXOM
CLIENT — City of Oshkosh AECOM Technical Services, Inc.
By: See Page 3 By: 4i/tia _ "'..l--G 1Zv
Steven L. Peterson, PE
(Name - Print)
Title: Title: Vice President
Date: Date: February 25, 2010
h: \data \work \oshkosh\stormwater ps 2009\20100225 amendment no. 1.docx
•
Signed for and in behalf of the City of Oshkosh
Mark A. Rohloff, City Manager
1
Pamela R. Ubrig, City Cler
1
L orenson, Cit' _ 4srney
/ 4q .
Peggy Steeno, Director of Finance
I hereby certify that the necessary provisions
have been made to pay the liability which will
accrue under this contract.
3