HomeMy WebLinkAbout2010 Roadway CIP H&H Studies Amendment 3 CONTRACT AMENDMENT #: 3 July 30, 2010
AECOM Project Number: 60131102 (114023) Client P.O. Number: 112360
Project Title: 2010 Roadway CIP H &H Studies
Client Name: City of Oshkosh Phone #: 920- 236 -5017
Address: 215 Church Ave; P.O. Box 1130 Fax #:
City: Oshkosh State: WI Zip: 54903
AMENDMENT DESCRIPTION: Additional analyses conducted on Division. See attachment
for summary of scope and amendment breakdown...
CONTRACT TIME:
Contract completion date prior to this Change Order: 12/31/2010
Schedule Increase/Decrease by this Change Order:
Revised completion date including this Change Order: 12/31/2010
CONTRACT COST:
Contract Price prior to this Change Order: $ 131,140.00
Sum of all previous approved Change Orders $
Estimated Cost Increase/Decrease by this Change Order: $ 14,800 .00
Revised Estimated Contract Price including this Change Order: $ 145,940.00
In all other respects, the Agreement remains the same.
APPROVED FOR CLIENT APPROVED FOR CONSULTANT
B See Page 1A By:
Name (print): Name (print): Scott Solverson
Title: Title: Vice - President
Date: 11- 20/0 Date: July 30, 2010
C: \Documents and Settings\mackem\Local Settings \Temporary Internet Files \Content.Outlook \TOR8PCZH \Osh l' uendment
3.doc 5 1 C E 8 it
AUG 1 1 200
Signed for and in behalf of the City of Oshkosh
Mark . Rohloff City Manager
Y g
Via.. _4!1
Pame a R. Ubrig, City Clerk wr
� 1
in • renson, ‘ ttorney
Pegg t n , Director of Finance
I hereby certify that the necessary provisions
have been made to pay the liability which will
accrue under this contract.
lA
City of Oshkosh
2010 CIP Hydrologic / Hydraulic Storm System Analysis
Out of Scope Items — Amendment #3
July 30, 2010
Division Street Drainage Area
1. Additional modeling, cost estimates, and meetings for
• Alternatives 13 and 13A (small and large above ground detention)
• Alternative 14 -X (variant on underground storage; 0.5 ac. foot print)
• Alternative 15 (Jackson St. box culvert, no detention)
Knapp Street Drainage Area
1. Additional modeling (analysis of 25 -year storm and ponding duration), cost estimates, and
meetings for
• Alternative 2 — Campbell Road relief sewer
• Alternative 2A — Evaluation of two outfalls on Knapp Street & Campbell Road relief sewer
• Alternative 3 — Two outfalls on Knapp Street
• Evaluation of outfail sizing
Tailwater Elevation Investigation
Work related to Lake Winnebago, Fox River, and Lake Butte de Morts water levels, gauge station
location, and analysis of field survey results from city.
C:\Documents and Settings\mackem\Local Settings \Temporary Internet Files \Content.Outlook \TOR8PCZH \Oshkosh 2010 CIP Amendment
3.doc
. e: COM
City of Oshkosh
Department of Public Works
215 Church Avenue
P.O. Box 1 130
Oshkosh, Wisconsin 54903 -1130
C4116 1
(920) 236 -5065
OIHKOIH
ON THE WATER
August 11, 2010
Mr. James Bachhuber
AECOM
1350 Deming Way, Suite 100
Middleton, WI 53562
Re: 2010 Roadway CIP H &H Studies — Amendment #3
Dear Jim:
Enclosed please find an executed copy of the Amendment for the 2010 Roadway CIP H &H Studies,
PO # 112360, as referenced above.
If you have any questions, please call our office at (920) 236 -5065. Thank you.
Sincerely,
A4 L C . 1/4fit±2-kicibw, David C. Patek
Director of Public Works
DCP /clm
Enclosure
cc: Pam Ubrig, City Clerk (w /original)
Lynn Lorenson, City Attorney (w /copy)
File Copy (w /copy)