HomeMy WebLinkAbout2010 Roadway CIP H&H Studies Amendment 3 CONTRACT AMENDMENT #: 3 July 30, 2010 AECOM Project Number: 60131102 (114023) Client P.O. Number: 112360 Project Title: 2010 Roadway CIP H &H Studies Client Name: City of Oshkosh Phone #: 920- 236 -5017 Address: 215 Church Ave; P.O. Box 1130 Fax #: City: Oshkosh State: WI Zip: 54903 AMENDMENT DESCRIPTION: Additional analyses conducted on Division. See attachment for summary of scope and amendment breakdown... CONTRACT TIME: Contract completion date prior to this Change Order: 12/31/2010 Schedule Increase/Decrease by this Change Order: Revised completion date including this Change Order: 12/31/2010 CONTRACT COST: Contract Price prior to this Change Order: $ 131,140.00 Sum of all previous approved Change Orders $ Estimated Cost Increase/Decrease by this Change Order: $ 14,800 .00 Revised Estimated Contract Price including this Change Order: $ 145,940.00 In all other respects, the Agreement remains the same. APPROVED FOR CLIENT APPROVED FOR CONSULTANT B See Page 1A By: Name (print): Name (print): Scott Solverson Title: Title: Vice - President Date: 11- 20/0 Date: July 30, 2010 C: \Documents and Settings\mackem\Local Settings \Temporary Internet Files \Content.Outlook \TOR8PCZH \Osh l' uendment 3.doc 5 1 C E 8 it AUG 1 1 200 Signed for and in behalf of the City of Oshkosh Mark . Rohloff City Manager Y g Via.. _4!1 Pame a R. Ubrig, City Clerk wr � 1 in • renson, ‘ ttorney Pegg t n , Director of Finance I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. lA City of Oshkosh 2010 CIP Hydrologic / Hydraulic Storm System Analysis Out of Scope Items — Amendment #3 July 30, 2010 Division Street Drainage Area 1. Additional modeling, cost estimates, and meetings for • Alternatives 13 and 13A (small and large above ground detention) • Alternative 14 -X (variant on underground storage; 0.5 ac. foot print) • Alternative 15 (Jackson St. box culvert, no detention) Knapp Street Drainage Area 1. Additional modeling (analysis of 25 -year storm and ponding duration), cost estimates, and meetings for • Alternative 2 — Campbell Road relief sewer • Alternative 2A — Evaluation of two outfalls on Knapp Street & Campbell Road relief sewer • Alternative 3 — Two outfalls on Knapp Street • Evaluation of outfail sizing Tailwater Elevation Investigation Work related to Lake Winnebago, Fox River, and Lake Butte de Morts water levels, gauge station location, and analysis of field survey results from city. C:\Documents and Settings\mackem\Local Settings \Temporary Internet Files \Content.Outlook \TOR8PCZH \Oshkosh 2010 CIP Amendment 3.doc . e: COM City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1 130 Oshkosh, Wisconsin 54903 -1130 C4116 1 (920) 236 -5065 OIHKOIH ON THE WATER August 11, 2010 Mr. James Bachhuber AECOM 1350 Deming Way, Suite 100 Middleton, WI 53562 Re: 2010 Roadway CIP H &H Studies — Amendment #3 Dear Jim: Enclosed please find an executed copy of the Amendment for the 2010 Roadway CIP H &H Studies, PO # 112360, as referenced above. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, A4 L C . 1/4fit±2-kicibw, David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /copy)