Loading...
HomeMy WebLinkAboutKnapp Street Quarries Amendment 1 AECOM 558 North Main Street, Oshkosh, WI 54901 T 920.236.6718 F 920.235.0321 Amendment Amendment No. 1 For Knapp Street Quarries, Design /Construction Documentation Methane Venting System AECOM Project No. 60141423 City PO #'s 112768 & 112770 RETURN TO: AECOM Date: May 5, 2010 558 North Main Street Oshkosh, WI 54901 Attention: Joseph R. Sargent SUMMARY: Original Contract Amount: (Design) $79,$e0 Total Previous Amendments (CS) $125,000 Amount this Amendment: (Design /CS) $70,500 Revised Contract Amount $275,300 3 - 1 t t, j{op Amendment # DESCRIPTION AMOUNT 1 Additional Engineering Design Services Changes /Bidding Assistance, Add to Bid Set Extra Details, Cross Sections, Change Electrical Service system Requirements. $25,000.00 On -going Communication with WDNR, Attendance and Preparation for Public $4,000.00 Meeting, Redesign of East Quarry Gas Collection System Extending System to the East based on Actual Quarry/Solid Waste Limits $10,000.00 Redesign of West Quarry Gas Collection System. Assist with Site Access, Work with and notify occupants of adjoining properties regarding site work objectives, Extending System to the North, East and South based on Actual Quarry/Solid Waste Limits $14,000.00 Addition of second full time construction technician during critical construction activities (5 weeks) $17,500.00 AXOM AECOM 558 North Main Street, Oshkosh, WI 54901 T 920.236.6718 F 920.235.0321 Amendment Page 2 . (Manager, City of Oshkosh) � � 7 Q p, % ,",,� B y . --� By: / /�Q� -- auI F. Timm Title: Senior Consultant Title: a 4,1 a Qe Date: S- 6- i v Date: ( 9 - 1 � AECOM By: -- f ) ( Clerk, 'ty of Osh osh) 'au! J. Killian e 0 By: Title: Remediation Area Practice Leader Title: OA ' l _,t -tr Date: 5'6 -/a Date: • - - 411.- . 71 t (City Att. ney, City of Osh ash) By: 14,.._u COW\ I , l Title: !ALA ter A:■■■ Date: Co w - -- ) -- C) t (Directo inance, Ci o Oshkosh) By: / �! �� c �a �U Title: % !'C 1 U , '' y/ /4a -1 /(D U< Date: 6 - /-S -/-D