HomeMy WebLinkAbout2010 Roadway CIP H&H Studies Amend 1 CONTRACT AMENDMENT #: 1 January 25, 2010 AECOM Project Number: 60131102 (114023) Client P.O. Number: 112360 Project Title: 2010 Roadway CIP H &H Studies Client Name: City of Oshkosh Phone #: 920 - 236 -5017 Address: 215 Church Ave; P.O. Box 1130 Fax #: City: Oshkosh State: WI Zip: 54903 AMENDMENT DESCRIPTION: Additional analyses conducted. See attachment for summary of scope and amendment breakdown... CONTRACT TIME: Contract completion date prior to this Change Order: 12/31/2010 Schedule Increase /Decrease by this Change Order: Revised completion date including this Change Order: 12/31/2010 CONTRACT COST: Contract Price prior to this Change Order: $ 91,990.00 Sum of all previous approved Change Orders $ Estimated Cost Increase /Decrease by this Change Order: $ 21,600 .00 Revised Estimated Contract Price including this Change Order: $ 113,590.00 In all other respects, the Agreement remains the same. APPROVED FOR CLIENT APPROVED FOR CONSULTANT By: See Page 1A By: ( . Y‘rr Name (print): Name (print): Christopher N. Yamaya Title: Title: Vice- President Date: February 24, 2010 Date: January 25, 2010 \11 Vjl C:\Documents and Settings \bachhuberj \Local Settings \Temporary Internet Files\Content.Outlook\ lte Ushkosh 2010 CIP Amendmen v2.doc ov 116 2010 N A=COM 1'C`( GLERK VACE G City of Oshkosh - 2010 CIP H &H Analysis Contract Amendment Melvin Avenue H &H Study: Out of Scope Items NOTE: original scope included 2 alternatives: 1 with gravity system only, 1 with a lift station 1 Additional Alternatives (includes model runs, mapping, and costing) Large pond alternative Small pond alternative Pond without a lift station 2nd lift station pumping rate 2 Additional Model Runs and Maps 25 year model & map for existing / alt 7 / alt 8 / alt 9 100 year model & map for existing / alt 7 / alt 8 / alt 9 June, 2008 rain model & map for existing / alt 7 / alt 8 / alt 9 3 Other Tasks Lift station graphic Lift station footprint schematic (Al Bush) Profile drawing (CAD) of original 2 alternatives Cost estimates for 3 alternatives including 2 lift stations Public Meeting on December 14th. Ohio Street Out of Scope (scope assumed 1 gravity sewer system to meet 10 year goal) 1 As of 12/11/09 eight full alternatives have been analyzed (including upsizing Ohio St. storm system) 2 the June, 2008 rain event will be run on 3 alternatives (not in the scope) 3 A lift station will be considered 4 A detention basin alternative was included in the alternatives 5 Cost estimating for 3 alternatives Division Street Out of Scope 1 Several additional alternatives with Division St. large storm sewer; 2 Considerations avoiding newer road surfaces (Total addition fees for conducting out of scope items: $21,600.00 Project Out of Scope List 1/25/2010 AZCOM Signed for and in behalf of the City of Oshkosh i te 4 / 4 1 /I- Mark A. Rohloff, City Manager 1 4111L .4 - Pamela R. Ubrig, City Cler. L• renson, Cilln ey g. Peggy Steeno, Director of Finance I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. lA