HomeMy WebLinkAbout2010 Roadway CIP H&H Studies Amend 1 CONTRACT AMENDMENT #: 1 January 25, 2010
AECOM Project Number: 60131102 (114023) Client P.O. Number: 112360
Project Title: 2010 Roadway CIP H &H Studies
Client Name: City of Oshkosh Phone #: 920 - 236 -5017
Address: 215 Church Ave; P.O. Box 1130 Fax #:
City: Oshkosh State: WI Zip: 54903
AMENDMENT DESCRIPTION: Additional analyses conducted. See attachment for summary
of scope and amendment breakdown...
CONTRACT TIME:
Contract completion date prior to this Change Order: 12/31/2010
Schedule Increase /Decrease by this Change Order:
Revised completion date including this Change Order: 12/31/2010
CONTRACT COST:
Contract Price prior to this Change Order: $ 91,990.00
Sum of all previous approved Change Orders $
Estimated Cost Increase /Decrease by this Change Order: $ 21,600 .00
Revised Estimated Contract Price including this Change Order: $ 113,590.00
In all other respects, the Agreement remains the same.
APPROVED FOR CLIENT APPROVED FOR CONSULTANT
By: See Page 1A By: (
.
Y‘rr
Name (print): Name (print): Christopher N. Yamaya
Title: Title: Vice- President
Date: February 24, 2010 Date: January 25, 2010
\11 Vjl
C:\Documents and Settings \bachhuberj \Local Settings \Temporary Internet Files\Content.Outlook\ lte Ushkosh 2010 CIP Amendmen
v2.doc
ov 116
2010
N
A=COM
1'C`( GLERK
VACE
G
City of Oshkosh - 2010 CIP H &H Analysis Contract Amendment
Melvin Avenue H &H Study: Out of Scope Items
NOTE: original scope included 2 alternatives: 1 with gravity system only, 1
with a lift station
1 Additional Alternatives (includes model runs, mapping, and costing)
Large pond alternative
Small pond alternative
Pond without a lift station
2nd lift station pumping rate
2 Additional Model Runs and Maps
25 year model & map for existing / alt 7 / alt 8 / alt 9
100 year model & map for existing / alt 7 / alt 8 / alt 9
June, 2008 rain model & map for existing / alt 7 / alt 8 / alt 9
3 Other Tasks
Lift station graphic
Lift station footprint schematic (Al Bush)
Profile drawing (CAD) of original 2 alternatives
Cost estimates for 3 alternatives including 2 lift stations
Public Meeting on December 14th.
Ohio Street Out of Scope (scope assumed 1 gravity sewer system to meet 10
year goal)
1 As of 12/11/09 eight full alternatives have been analyzed (including upsizing
Ohio St. storm system)
2 the June, 2008 rain event will be run on 3 alternatives (not in the scope)
3 A lift station will be considered
4 A detention basin alternative was included in the alternatives
5 Cost estimating for 3 alternatives
Division Street Out of Scope
1 Several additional alternatives with Division St. large storm sewer;
2 Considerations avoiding newer road surfaces
(Total addition fees for conducting out of scope items: $21,600.00
Project Out of Scope List 1/25/2010
AZCOM
Signed for and in behalf of the City of Oshkosh
i te 4 / 4 1 /I-
Mark A. Rohloff, City Manager
1 4111L
.4 - Pamela R. Ubrig, City Cler.
L• renson, Cilln ey
g.
Peggy Steeno, Director of Finance
I hereby certify that the necessary provisions
have been made to pay the liability which will
accrue under this contract.
lA