Loading...
HomeMy WebLinkAboutPW CNT 10-04/CNGT 1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O. Box 1130 40) Oshkosh, Wisconsin 54903 -1130 Fa. (920) 236 -5065 OI HKOOH Fax (920) 236-5068 ON THE WATER March 9, 2011 Mr. Glen Joski Advance Construction, Inc. 2141 Woodale Avenue Green Bay, WI 54313 Re: Change Order #1 /Contract 10 -04 Dear Mr. Joski: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Advance Construction regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, 0624' of C . l David C. C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) 4148 1 O Lynn Lorenson, Assistant City Attorney (w /copy) 20/f File Copy (w /original) 1:\Engineering110 -04 Concrete Paving \Project_ Information \Contract Info \CHANGE Page 1 of 1 ORDERS110 -04 Change Order Letter #1.doc CHANGE ORDER # 1 DATED: February 9, 2011 TO: Advance Construction Inc. 2141 Woodale Avenue Green Bay WI 54313 Your present contract with the City of Oshkosh, Contract No. 10 -04 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING $79,083.81 NET DECREASE TO: SECTION II - STORM SEWER ($21,410.60) NET INCREASE TO: SECTION III - SANITARY SEWER $19,780.53 NET INCREASE TO: SECTION IV - WATER MAIN $52,230.18 NET INCREASE TO CONTRACT: $129,683.92 CITY OF OSHKOSH BY: -1�¢ SH Recommended: City Manager ; , , -‘-i,i,;(1 Cd. 494k , ) Director of Public Works City Clerk / (,) Approved an. - - - • =•: Contractor certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. P12/41(d Yekt9 11 Comptroller AID. •ved as to form ( , 1L. 1 A i4��� A \�- 1 C ity Atto7-11r CONTRACT: 10 -04 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 100 Pavement removal, . Square complete as specified Yards 4,970 5,379.20 409.20 $3.00 $1,227.60 101 Sidewalk and driveway removal, complete as Square specified Feet 41,630 44,193.00 2,563.00 $0.50 $1,281.50 102 Excavation, complete as Cubic specified Yards 15,290 17,980.80 2,690.80 $6.20 $16,682.96 103 7" non - reinforced concrete pavement, including integral curb, 5" base material and grading, Square complete as specified Yards 27,875 27,944.00 69.00 $26.75 $1,845.75 104 8" concrete pavement, HES, including integral curb and 6" base material and grading, complete as Square specified Yards 1,745 1,983.20 238.20 $35.27 $8,401.31 105 12" wide radius curb head, complete as specified Linear Feet 1,625 1,866.30 241.30 $12.00 $2,895.60 106 Standard 24" curb & gutter, 7" (tie -in), complete as Linear specified Feet 32 210.00 178.00 $25.00 $4,450.00 107 Standard 30" curb & gutter, 7" (tie -in), complete as Linear specified Feet 240 134.50 - 105.50 $25.00 ($2,637.50) 108 Sidewalk curb, complete as Linear specified Feet 200 60.20 - 139.80 $18.00 ($2,516.40) 109 4" concrete sidewalk, Square complete as specified Feet 22,520 23,946.00 1,426.00 $3.03 $4,320.78 110 6" concrete sidewalk & driveway, complete as Square specified Feet 31,555 28,692.30 - 2,862.70 $3.18 ($9,103.39) 111 3 1 /2" asphaltic concrete driveway, complete as Square specified Feet 95 940.30 845.30 $3.91 $3,305.12 112 2" Asphaltic concrete transition with base and asphaltic curb, complete as Square specified Yards 370 243.00 - 127.00 $17.75 ($2,254.25) 113 3 A" asphaltic concrete transition, with base, Square complete as specified Yard 860 1,371.50 511.50 $34.85 $17,825.78 114 Furnish and install crushed stone base course, complete as specified Tons 4,590 6,277.00 1,687.00 $7.77 $13,107.99 115 Sawing, complete as Linear specified Feet 2,400 2,424.20 24.20 $1.65 $39.93 116 Furnish and install pavement ties (epoxy coated), complete as specified Each 460 376.00 -84.00 $6.00 ($504.00) 117 Adjust manholes and inlets, complete as specified Each 241 229.00 -12.00 $250.00 _ ($3,000.00) Page 1 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 118 Furnish and install No. 4 reinforcing bars (epoxy coated), complete as Linear specified Feet 660 210.00 - 450.00 $1.00 ($450.00) 119 Remove trees and stumps, complete as specified Inch Diameter 270 238.20 -31.80 $22.00 ($699.60) 120 Furnish and install trees, complete as specified Each 12 9.00 -3.00 $220.00 ($660.00) 121 Provide and install metal detectable warning plates, complete as specified Square Feet 680 792.00 112,00 $27.00 $3,024.00 122 Terrace work on Broad Street, complete as specified Lump Sum 1 1.00 $5,345.00 123 Terrace work on Grand Street, complete as specified Lump Sum 1 1.00 $8,600.00 124 Terrace work on E. Melvin Avenue, complete as specified Lump Sum 1 1.00 $17,000.00 125 Terrace work on Ostertag Place, complete as specified Lump Sum 1 1.00 $150.00 126 Terrace work on Powers Street, complete as specified Lump Sum 1 1.00 $9,750.00 127 Terrace work on Rock Place, complete as specified Lump Sum 1 1.00 $600.00 128 Terrace work on E. Tennessee Avenue, complete as specified Lump Sum 1 1.00 $1,750.00 SECTION I - (BID ITEMS 100 - 128) - SUB - TOTALS $78,408.32 ($21,825.14) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 129 Haul contaminated soil per contract supplement, complete as specified Tons 0.00 589.10 589.10 $12.00 $7,069.20 130 8" concrete sidewalk and driveways and 6" base material and grading, Square complete as specified Yards 0.00 61.53 61.53 $35.27 $2,170.16 131 7" concrete pavement, HES, including integral curb and 6" base material and grading, complete as Square specified Yards 0.00 241.70 241.70 $35.81 $8,655.28 132 Furnish and install 3" clear stone breaker run used in undercut areas, complete as specified Tons 0.00 175.40 175.40 $15.29 $2,681.87 Page 2 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 133 Furnish and install 5" hot mix asphaltic pavement, Square complete as specified Yards 0.00 12.40 12.40 $52.60 $652.24 134 Remove additional concrete sidewalk to realign sidewalk by Sub - Contractor per Inspector's orders, complete as specified Square Feet 0.00 152.50 152.50 $0.75 $114.38 135 Additional landscaping beyond the project limits, Lump complete as specified Sum 0.00 1.00 1.00 $223.00 $223.00 136 Added hot water to concrete mix at batch plant due to late season installation, complete as Lump specified Sum 0.00 1.00 1.00 $934.50 $934.50 137 Additional days added to contract for various additional work per letter dated July 6, 2010 Days 0.00 0.00 12.00 $0.00 _ ADDITIONAL WORK: C.O. # 1 - (ITEMS 129 - 136) - SUB -TOTAL $22,500.63 $0.00 NET INCREASE TO: SECTION I $79,083.81 SECTION II - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 200 Furnish and install 12" storm sewer, complete as Linear specified Feet 1,824 1982.30 158.30 $45.50 $7,202.65 201 Furnish and install 15" storm sewer, complete as Linear specified Feet 2,248 2129.00 - 119.00 $45.50 ($5,414.50) 202 Furnish and install 18" storm sewer, complete as Linear specified Feet 508 487.50 -20.50 $46.85 ($960.43) 203 Furnish and install 21" storm sewer, complete as Linear specified Feet 919 880.90 -38.10 $49.50 ($1,885.95) 204 Furnish and install 24" storm sewer, complete as Linear specified Feet 580 422.50 - 157.50 $51.40 ($8,095.50) 205 Furnish and install 36" storm sewer, complete as Linear specified Feet 570 524.60 -45.40 $66.60 ($3,023.64) 206 Furnish and install 42" storm sewer, complete as Linear specified Feet 616 568.50 -47.50 $77.60 ($3,686.00) 207 Furnish and install 48" storm sewer, complete as Linear specified Feet 222 206.30 -15.70 $93.10 ($1,461.67) Page 3 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 208 Furnish and install 48" RCP Class 111 storm sewer, complete as specified Linear Feet 59 74.00 15.00 $93.10 $1,396.50 209 Furnish and install 38" x 60" RCP Class 111 storm sewer, complete as Linear specified Feet 274 228.10 -45.90 $112.15 ($5,147.69) 210 Furnish and install 48" x 76" RCP Class III storm sewer, complete as Linear specified Feet 453 438.40 -14.60 $151.85 ($2,217.01) 211 Furnish and install 4' x 6' box culvert storm sewer, Linear complete as specified Feet 1,150 1134.20 -15.80 $218.35 ($3,449.93) 212 Furnish and install 4' x 8' box culvert storm sewer, Linear complete as specified Feet 997 980.20 -16.80 $304.00 ($5,107.20) 213 Furnish and install 4' x 6' box culvert storm sewer w /manhole riser, complete Linear as specified Feet 72 60.00 -12.00 $218.35 ($2,620.20) 214 Furnish and install 4' x 8' box culvert storm sewer w /manhole riser, complete Linear as specified Feet 48 63.00 15.00 $304.00 $4,560.00 215 Furnish and install 66" steel casing pipe, complete as Linear specified Feet 59 60.00 1.00 $1,100.00 $1,100.00 216 Furnish and install std. inlets (type 3 with 18" sump) with castings, complete as specified Each 102 102.00 $1,400.00 217 Furnish and install std. inlets (type 3 with no sump) with castings, complete as specified Each 3 4.00 1.00 $1,330.00 $1,330.00 218 Furnish and install std. Storm manhole (4' inside diameter) in 4 locations without casting, complete Vertical as specified Feet 121 117.42 -3.58 $170.00 ($608.60) 219 Furnish and install std. storm manhole (5' Inside diameter) in 3 locations without casting, complete Vertical as specified Feet 24 22.15 -1.85 $267.00 ($493.95) 220 Furnish and install std. storm manhole (6' Inside diameter) in 7 locations without casting, complete Vertical as specified Feet 50 50.00 $340.00 221 Furnish and install std. storm box manhole (7' x 7') in 1 location without casting, complete as Vertical specified Feet 10 28.37 18.37 $640.00 $11,756.80 Page 4 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 222 Furnish and install std. storm manhole riser (4' inside diameter) in 15 locations without casting, Vertical complete as specified Feet 46 47.00 1.00 $116.00 $116.00 223 Furnish and install std. storm inlet manhole (4' inside diameter) in 2 locations with casting, Vertical complete as specified Feet 8 8.67 0.67 $273.00 $182.91 224 Furnish and install std. storm inlet manhole (5' inside diameter) in 1 location with casting, Vertical complete as specified Feet 7 6.00 -1.00 $320.00 ($320.00) 225 Furnish and install std. storm box inlet manhole (7' x 7') in 1 location with casting, complete as Vertical specified Feet 9 0.00 -9.00 $700.00 ($6,300.00) 226 Furnish and install std. storm junction chambers without casting, complete as specified Each 6 6.00 $16,000.00 227 Furnish and install 6" storm lateral, complete as Linear specified Feet 3,908 3606.50 - 301.50 $38.00 ($11,457.00) 228 Furnish and install 8" storm lateral, complete as Linear specified Feet 26 36.00 10.00 $40.00 $400.00 229 Furnish and install storm lateral marker balls, complete as specified Each 290 283.00 -7.00 $13.00 ($91.00) 230 Abandon lineal feet of 8" - 12" storm sewer, complete Linear as specified Feet 1,120 1100.00 -20.00 $3.00 ($60.00) 231 Abandon lineal feet of 15" and larger storm sewer, Linear complete as specified Feet 4,133 4100.00 -33.00 $5.00 ($165.00) 232 Abandon inlets or manholes, complete as specified Each 47 47.00 $250.00 233 Furnish, install, and maintain Type "D" inlet protection std., complete as specified Each 271 192.00 -79.00 $75.00 ($5,925.00) 234 Furnish, install, and maintain silt fence, Linear complete as specified Feet 30 0.00 -30.00 $2.00 ($60.00) 235 Furnish, install, and maintain stone bags, complete as specified Each 5 0.00 -5.00 $8.00 ($40.00) 236 Utility line opening, complete as specified Each 2 0.00 -2.00 $550.00 ($1,100.00) SECTION II - (BID ITEMS 200 - 236) - SUB - TOTALS $28,044.86 ($69,690.27) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION II Page 5 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE 1N DECREASE IN NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 237 Additional labor, equipment, and materials to install Type I inlet with 18" sump, complete as Lump specified Sum 0.00 1.00 1.00 $1,400.00 $1,400.00 238 Additional labor, equipment, and materials to repair 18" storm sewer on Eastman St, complete as Lump specified Sum 0.00 1.00 1.00 $2,222.18 $2,222.18 239 Additional labor, equipment, and materials to remove the rock obstructions on the boring of the railroad tracks on Melvin Ave, complete as Lump specified Sum 0.00 1.00 1.00 $3,901.37 $3,901.37 240 Additional labor, equipment, and materials to install clay dam at the northeast corner of Melvin Ave. and Grove St., Lump complete as specified Sum 0.00 1.00 1.00 $3,086.16 $3,086.16 241 Additional labor, equipment, and materials to install clay dam through the intersection of Melvin and Grove, complete as Lump specified Sum 0.00 1.00 1.00 $3,000.00 $3,000.00 242 Additional labor, equipment, and materials to install weir plate in MH M- 57 to prevent storm water flow to allow completion of storm water lift station, complete as specified Lump Sum 0.00 1.00 1.00 $925.10 $925.10 243 Additional labor, equipment, and materials to move yard inlet on Melvin just west of tracks, complete as specified Lump Sum 0.00 1.00 1.00 $1,200.00 $1,200.00 244 Additional labor, equipment, and materials to recore manholes G28 and G -30 to match field conditions, complete as Lump _specified Sum 0.00 1.00 1.00 $4,500.00 $4,500.00 ADDITIONAL WORK: C.O. # 1 - (ITEMS 237 - 243) - SUB -TOTAL $20,234.81 $0.00 NET DECREASE TO: SECTION II ($21,410.60) Page 6 of 14 • CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE 1N NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE SECTION III - SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 300 Furnish and install 8" sanitary sewer (relay), Linear complete as specified Feet 4,625 5038.20 413.20 $60.00 $24,792.00 301 Furnish and install 8" sanitary sewer drop, Vertical complete as specified Feet 30 15.01 -14.99 $250.00 ($3,747.50) 302 Furnish and install 10" sanitary sewer (relay), Linear complete as specified Feet 2,950 2598.00 - 352.00 $62.00 ($21,824.00) 303 Furnish and install 12" sanitary sewer (relay), Vertical complete as specified Feet 15 10.00 -5.00 $75.00 ($375.00) 304 Furnish and install 12" sanitary sewer drop, Vertical complete as specified Feet 5 0.00 -5.00 $300.00 ($1,500.00) 305 Furnish and install 15" sanitary sewer (relay), Vertical complete as specified Feet 5 5,00 $90.00 306 Furnish and install 18" sanitary sewer (relay), Vertical complete as specified Feet 50 50.00 $96.00 307 Furnish and install 30" sanitary sewer (relay), Vertical complete as specified Feet 5 0.00 -5.00 $150.00 ($750.00) 308 Furnish and install std. sanitary manhole (4' inside diameter) in various locations, complete as specified, without casting Vertical Feet 440 473.16 33.16 $200.00 $6,632.00 309 Furnish and install 8" x 4" factory wyes or tees, complete as specified Each 1 0.00 -1.00 $40.00 ($40.00) 310 Furnish and install 8" x 6" factory wyes or tees, complete as specified Each 100 100.00 $61.00 311 Furnish and install 10" x 6" factory wyes or tees, complete as specified Each 30 27.00 -3.00 $95.00 ($285.00) 312 Furnish and install new 4" sanitary laterals, complete Linear as specified Feet 380 370.00 -10.00 $51.00 ($510.00) 313 Furnish and install 4 "/6" sanitary lateral relay, Linear complete as specified Feet 2,950 2785.50 - 164.50 $52.00 ($8,554.00) 314 Furnish and install sanitary lateral marker balls, complete as specified Each 255 254.00 -1.00 $13.00 ($13.00) 315 Furnish and install concrete collars, complete as specified Each 2 4.00 2.00 $400.00 $800.00 Page 7 of 14 • CONTRACT: 10 -04 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 316 Core into existing manhole, complete as specified Each 6 5.00 -1.00 $550.00 ($550.00) 317 Abandon sanitary manholes at various locations, complete as specified Each 8 8.00 $350.00 318 Abandon 8" sanitary sewer at various locations Linear complete as specified Feet 860 860.00 $2.70 319 Abandon 10" sanitary sewer at various locations, complete as specified Linear Feet 815 815.00 $3.00 320 Abandon 12" sanitary sewer at various locations, complete as specified Linear Feet 1,040 240.00 - 800.00 $3.40 ($2,720.00) 321 Furnish and install connections of new sanitary main to existing sanitary main (various locations and sizes), complete as specified Each 23 18.00 -5.00 $550.00 ($2,750.00) 322 Furnish and install 8" plug, complete as specified Each 1 1.00 $250.00 323 Furnish and install 18" casing pipe (18' lengths), complete as specified Each 1 1.00 $2,000.00 324 Furnish and install 10" x 4" factory wye or tee, complete as specified Each 1 0.00 -1.00 $80.00 ($80.00) 325 Furnish and install 4" sanitary lateral cleanout, complete as specified Each 3 0.00 -3.00 $290.00 ($870.00) SECTION III - (BID ITEMS 300 - 325) - SUB - TOTALS $32,224.00 ($44,568.50) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 326 Additional labor, equipment, and materials to install tracer wire and tracer wire boxes for sanitary lateral for the storm water pump station, complete as Lump specified Sum 0.00 1.00 1.00 $1,353.03 $1,353.03 327 Additional labor, equipment, and materials to jack hammer and remove concrete ballast at the connection to MH H -8, complete as specified Hrs. 0.00 4.00 4.00 $850.00 $3,400.00 Page 8 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 328 Sanitary MH #18 was built and delivered to site, upon excavation it was determined that the field conditions did not match MH #18 and manhole could not be used, therefore the city bought the manhole section and it was delivered Lump to City yard Sum 0.00 1.00 1.00 $1,604.75 $1,604.75 329 Existing field conditions did not match inverts of MH M- 16, MH M10was substituted for MH M -16, and MH M -16 was bought by City and delivered to the City yard. Payment for additional crew time was granted for the switching of Lump manholes Sum 0.00 1.00 1.00 $3,892.25 $3,892.25 330 Additional labor, equipment, and materials to rebuild and plug MH M -8 to match existing field conditions, complete as Hrs. 0.00 4.00 4.00 $750.00 $3,000.00 331 Additional labor, equipment, and materials to install 8" sanitary sewer and casing pipe under the box culvert at 705 Melvin, complete as specified Lump Sum 0.00 1.00 1.00 $1,200.00 $1,200.00 332 Additional crew time and jack hammer rental to cut off existing drops and concrete casing on existing sanitary manhole at Melvin and Powers, complete as specified Hours 0.00 4.00 4.00 $850.00 $3,400.00 333 Additional crew time and jack hammer rental to cut off existing drops and concrete casing on existing sanitary manhole MH N -10 at New York Ave., complete as specified Hours 0.00 3.50 3.50 $850.00 $2,975.00 334 Additional crew time and jack hammer rental to cut off existing drops and concrete casing on existing sanitary manhole at Broad and Irving Hours 0.00 1.50 1.50 $850.00 $1,275.00 335 Additional crew time and jack hammer rental to cut off existing drops and concrete casing on existing 32" sanitary sewer on Hazel St., complete as specified Hours 0.00 3.50 3.50 $850.00 $2,975.00 Page 9 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 336 Existing 12" sanitary sewer was slurry filled, per Inspector's request, Linear complete as specified Feet 0.00 800.00 800.00 $6.00 $4,800.00 337 Additional labor, equipment, and matreials to install additional access point to lift station lateral, per City of Oshkosh Plumbing Inspector's orders, complete as Lump specified. Sum 0.00 1.00 1.00 $2,250.00 $2,250.00 ADDITIONAL WORK: C. O. 1 - (ITEMS 326 - 335) - SUB -TOTAL $32,125.03 $0.00 NET INCREASE TO: SECTION III $19,780.53 SECTION IV - WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 400 Furnish and install 4" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 20 384.00 364.00 $80.00 $29,120.00 401 Furnish and install 6" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 325 327.00 2.00 $53.45 $106.90 402 Furnish and install 8" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 6,600 7010.00 410.00 $58.00 $23,780.00 403 Furnish and install 18" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 50 49.00 -1.00 $100.00 ($100.00) 404 Furnish and install 1" water service relay, complete as specified, not including corporation and stop box Linear Feet 3,000 2917.00 -83.00 $38.00 ($3,154.00) 405 Furnish and install new 1" water service, complete as specified, not including corporation and stop box Linear Feet 40 10.00 -30.00 $39.00 ($1,170.00) 406 Furnish and install 1" corporation and stop box with stainless steel rod, complete as specified Each 125 122.00 -3.00 $300.00 ($900.00) Page 10 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 407 Furnish and install 8" x 6" tees, complete as specified Each 23 20.00 -3.00 $325.00 ($975.00) 408 Furnish and install 8" x 8" tees, complete as specified Each 7 9.00 2.00 $350.00 $700.00 409 Furnish and install 8" x 8" cross, complete as specified Each 4 4.00 $336.00 410 Furnish and install 6" valves, complete as specified Each 21 21.00 $855.00 411 Furnish and install 8" valves, complete as specified Each 44 49.00 5.00 $1,120.00 $5,600.00 412 Furnish and install 18" valves, complete as specified Each 2 2.00 $9,100.00 413 Furnish and install 6" x 6" tapping valve and sleeve, complete as specified Each 1 0.00 -1.00 $2,200.00 ($2,200.00) 414 Furnish and install 12" x 8" tapping valve and sleeve, complete as specified Each 2 0.00 -2.00 $2,888.00 ($5,776.00) 415 Furnish and install 4" - 22 '/� degree bends, complete as specified Each 2 0.00 -2.00 $140.00 ($280.00) 416 Furnish and install 6" - 22 1 /2 degree bends, complete as specified Each 3 0.00 -3.00 $180.00 ($540.00) 417 Furnish and install 8" - 22 1 /2 degree bends, complete as specified Each 3 7.00 4.00 $245.00 $980.00 418 Furnish and install 4" - 45 degree bends, complete as specified Each 2 6.00 4.00 $145.00 $580.00 419 Furnish and install 6" - 45 degree bends, complete as specified Each 18 34.00 16.00 $190.00 $3,040.00 420 Furnish and install 8" - 45 degree bends, complete as specified Each 34 53.00 19.00 $245.00 $4,655.00 421 Furnish and install 18" - 45 degree bends, complete as specified Each 4 4.00 $1,330.00 422 Furnish and install 8" x 4" reducer, complete as specified Each 1 2.00 1.00 $200.00 $200.00 423 Furnish and install 8" x 6" reducers, complete as specified Each 18 19.00 1.00 $215.00 $215.00 424 Relocate hydrant, complete as specified Each 2 0.00 -2.00 $800.00 ($1,600.00) 425 Furnish and install hydrants, complete as specified Each 17 20.00 3.00 $2,900.00 $8,700.00 Page 11 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 426 Furnish and install gradeloks for hydrant branches, complete as specified Each 17 0.00 -17.00 $400.00 ($6,800.00) 427 Furnish and install connections of new water main to existing water main (various sizes and locations), complete as specified Each 28 25.00 -3.00 $1,735.00 ($5,205.00) 428 Furnish and install 6" cap, complete as specified Each 5 0.00 -5.00 $250.00 ($1,250.00) 429 Furnish and install 8" cap, complete as specified Each 7 3.00 -4.00 $300.00 ($1,200.00) 430 Cut and cap existing 4" water main, complete as specified Each 1 0.00 -1.00 $350.00 ($350.00) 431 Cut and cap existing 6" water main, complete as specified Each 3 0.00 -3.00 $380.00 ($1,140.00) 432 Cut and cap existing 8" water main, complete as specified Each 1 0.00 -1.00 $450.00 ($450.00) 433 Furnish and install 6" sleeve, complete as specified Each 5 6.00 1.00 $360.00 $360.00 434 Furnish and install 8" sleeve complete as specified Each 5 6.00 1.00 $410.00 $410.00 435 Furnish and install 10" sleeve complete as specified Each 5 0.00 -5.00 $550.00 ($2,750.00) 436 Furnish and install 12" sleeve complete as specified Each 5 1.00 -4.00 $700.00 ($2,800.00) 437 Abandon water main on Broad Street (Parkway Ave to Irving Ave), complete as Lump specified Sum 1 1.00 $1,000.00 438 Abandon water main on Grand Street (Lincoln Ave to New York Ave), Lump complete as specified Sum 1 1.00 $3,000.00 439 Abandon water main on Melvin Avenue (Eastman Ave to Hazel St), complete Lump as specified Sum 1 1.00 $3,000.00 440 Abandon water main on Powers St. (New York Ave to Nevada Ave), complete Lump as specified Sum 1 1.00 $1,000.00 441 Abandon water main on Rock Place (Grand Ave to CN RR ROW), complete as Lump specified Sum 1 1.00 $1,000.00 Page 12 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 442 Furnish and install 2" casing pipe (18 foot lengths), complete as specified Each 8 4.00 -4.00 $360.00 ($1,440.00) 443 Furnish and install 18" casing pipe (18 foot lengths), complete as specified Each 5 5.00 $2,000.00 444 Furnish and install 36" casing pipe (18 foot lengths), complete as specified Each 1 1.00 $5,000.00 445 Furnish and install 1 water service, complete as specified, not including corporation and stop box Linear Feet 360 0.00 - 360.00 $48.00 ($17,280.00) 446 Furnish and install 1Y2" corporation and stop box with stainless steel rod, _complete as specified Each _ 1 0.00 -1.00 $742.00 ($742.00) SECTION IV - (BID ITEMS 400 - 446) - SUB - TOTALS $78,446.90 ($58,102.00) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 447 Additional labor, equipment, and materials to lower 12" water main in the intersection of Broad St. and Parkway Avenue, complete as specified L.S. 0.00 1.00 1.00 $10,927.66 $10,927.66 448 Relay 1 -1/4" water service on Powers and Nevada, complete as specified L.F. 0.00 36.00 36.00 $48.00 $1,728.00 449 Additional labor, equipment, and materials to install 6" x 4" tapping valve and sleeve for storm water lift station, complete as specified L.S. 0.00 1.00 1.00 $4,719.81 $4,719.81 450 Additional labor, equipment, and materials to relocate 8" water main on Melvin St at Station 12 +45 to save large Oak tree, complete as specified L.S. 0.00 1.00 1.00 $2,250.00 $2,250.00 451 Additional labor, equipment, and materials to remove old leaded cross and tee and replace new 6" x 6" tee on Eastman and Melvin, complete as _specified L.S. 0.00 1.00 1.00 $4,058.17 $4,058.17 Page 13 of 14 CONTRACT: 10 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 452 Additional labor, equipment, and materials to fix water main blowout on 8/30 on Grand St., complete as specified L.S. 0.00 1.00 1.00 $1,370.00 $1,370.00 453 Additional labor, equipment, and materials to fix crack in existing water main on 8/23, complete as specified Hrs. 0.00 1.50 1.50 $750.00 $1,125.00 454 Additional labor, equipment, and materials to temporary patch the Eastman St. and Melvin Ave. intersection where water main was extended and old water main was abandoned, complete as specified L.S. 0.00 1.00 1.00 $2,555.09 $2,555.09 455 Additional labor, equipment, and materials to fix leaking water service at 1002 Bong Ct., complete as specified Hrs. 0.00 2.00 2.00 $750.00 $1,500.00 456 Furnish and install 18" solid sleeve, complete as _specified Each 0.00 1.00 1.00 $1,651.55 $1,651.55 ADDITIONAL WORK: C.O. # 1 (ITEMS 447 - 455) - SUB -TOTAL $31,885.28 $0.00 NET INCREASE TO: SECTION IV $52,230.18 NET INCREASE TO SECTIONS I, 11, III, IV $323,869.83 NET DECREASE TO SECTIONS I, II, III, IV ($194,185.91) NET INCREASE TO CONTRACT: $129,683.92 Page 14 of 14