HomeMy WebLinkAboutPW CNT 10-09/CNG 1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 Ph. (920) 236-5065 Fax (920) 236 -5068 Of - <OfH ON THE WATER March 9, 2011 Mr. Ben Samolinski Miron Constniction Company PO Box 509 Neenah, WI 54957 Re: Change Order #1 /Contract 10 -09 Dear Mr. Samolinski: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Miron Construction Company regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, 06aNt.oti ( Pair-k4d/r v ,■' David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, Assistant City Attorney (w /copy) �,j AECOM, Paul Timm (w /copy) 4 1 0 2 File Copy (w /original) 0 1/ L \ Engineering \10 -09 Melvin Avenue Storm Water Punip Page 1 of 1 Station \Project_Information \Contract Info \CHANGE ORDERS \10 -09 Change Order Letter #1 .doc A WwrCOM February 10, 2011 Change Order No. 1 Project: Melvin Storm Water Pump Station, City Contract 10 -09 Owner: City of Oshkosh Contract: 10 -09 Contractor: Miron Construction Co., Inc. Description of Change Request for Quote PM No. Change 1 1 /2 inch copper water service/ Access Road to 16 ft. / ramp widening /area drain $0 Mud Slab $0 Duct Banks A and B CCIR 003 Revl $0 4" conduit through foundation future fiber optics line $0 Drill and epoxy dowels around grouted area box culvert meets wall $0 Paint OH door to match color $0 TOTAL VALUE OF THIS CHANGE ORDER ADD $0 Contract Price Adjustment Original Contract Price $3,029,860.00 Previous Change Orders $0 Adjustments in Contract Price this Change Order $0 Current Contract Price including this Change Order $3,029,860.00 Contract Completion Date Adjustment (Not to Exceed) Original Contract Completion Date Substantial Completion August 30, 2010 Final Completion October 31, 2010 Contract Completion Date Adjustments Substantial Completion 0 due to previous Change Orders Final Completion 0 Contract Completion Date Adjustments Substantial Completion add 29 days due to this Change Order Final Completion add 19 days Current Contract Completion Dates Substantial Completion September 28, 2010 including all Change Orders Final Completion November 19, 2010 IrllrrCOM This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED En neer — AECO Date APP' • D il' i atete4 /,r, i ,- A611, CONT . CTOR — Miron C' struction Co., Inc. Date David G. Cm/ Jr., President RECOMMENDED BY OWNER Vic) . P44 , - `-1- z c Director of Public Works Date APPROVED BY OWNER % /7<, —-- -Ct - DC( cctt"y '► a - _ er Date . _ 1U i ' at City Clerk Date li I certify that provision has been made to pay the liability that will accrue to the City of Os go h, Wisconsin u 's Change Order. L Y '' ?"// City CompffoWer v Date • P' VED AST To FOR i AI - -- L !Ala - \-- — q — `11 Attorney Date AECOM AECOM 920.235.0270 tel 558 North Main Street 920.235.0231 fax Oshkosh, Wisconsin 54901 Summary of Melvin Avenue Storm Water Pump Station Contract Status and Out Standing Issues, City Contract 10 -09 — AECOM Project Number 60158059 February 10, 2011 Time Extension Requests City/AECOM proposes to trade all costs related to Change Orders, listed below, for not pursuing liquidated damages. This agreement will add 30 days to Substantial Completion and 29 day to Final Completion. A completed change order is attached for your consideration. If this offer is not accepted the City of Oshkosh intends to pursue the maximum liquidated damages as allowed by contract. Per Article 4.03 the requirement of proof of financial loss is not required by assessing liquidated damages for delay (not as a penalty). Change Orders PM # Description Amount 2 Change 1 'A inch copper water service/ Access Road to 16 ft. / ramp widening /area drain $27,195 3 Mud Stab <$2,364> 4 Duct Banks A and B CCIR 003 Rev1 $0 5 4" conduit through foundation future fiber optics line $716 6 Drill and epoxy dowels around grouted area box culvert meets wall $2,380 8 Paint OH door to match color $1,007 CO Total $28,934 Liquidated damages Per Article 4.03 waiver of proof of financial loss is covered by assessing liquidated damages for delay (not as a penalty). Substantial Completion contract date in the contract is August 31; Actual Substantial Completion date was Sept. 28, when Pump Station was turned on. Contract allows $1,000 per calendar day for a total of 29 days, ($29,000) Contract Final Completion date in the contract is October 31, and Actual Final Completion date was November 19, when the GFP on Generator was verified as operational and received approval from City Electrical Inspector. Contract allows for $100 per calendar day for a total of 19 days ($1,900) C:1Documents and Settingsttimmp \My Documentstmelvin memo to Miron.docx AECOM 2 Remaining Punch List Items E -mat — resolution delayed to spring Air Permit Submittal for Generator is being submitted Telecommunications is being resolved Topsoil grades— resolution delayed to spring Grass pavers— resolution delayed to spring AECOM recommends retainage be reduced to $28,000 Remaining Warranty Items Pump 1 and 3 Alarm- amperage issue being looked into by pump supplier Other Base ball diamond If Miron accepts the attached Change Order the City agrees to accept the seeding and e- matt of the former ball diamond as an equal cost to replacing the diamond. Pay Applications 8 and 9 Miron has submitted Pay Application 8 ($70,000) and 9 ($5,746.50) for approval. AECOM recommends that Pay Application 8 be approved but reduced to $47,746.50 and Pay Application 9 not be approved until punch list items are resolved. This would leave a total of $28,000 as final retainage of the original contract total of $3,029,860.00. This has been submitted to the City on February 11, 2011. C: \Documents and Settings \timmp \My Documents\melvin memo to Miron.docx