Loading...
HomeMy WebLinkAboutPW CNT 10-06/CNG 2 City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1 130 Oshkosh, Wisconsin 54903 -1130 (-41 (920) 236 -5065 OJHKOJH ON THE WATER December 17, 2010 Mr. Leroy Fischer Fischer -Ulman Construction, Inc. 1115 S. Theodore Street Appleton, WI 54915 Re: Change Order #2 /Contract 10 -06 Dear Mr. Fischer: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Fischer -Ulman Construction, Inc. regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, d tV oL C. A,& /cb- David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original) CHANGE ORDER # 2 DATED: December 1, 2010 TO: FISCHER -ULMAN CONSTRUCTION 1115 S. THEODORE STREET APPLETON, WI 54915 Your present contract with the City of Oshkosh, Contract No. 10 -06 , is hereby amended and changed as follows: NET DECREASE TO CONTRACT: ($28,136.81) CITY OF OSHKOSH BY: AL Ar R Recommended: ` Director of Pub4ic Works City Clerk A•proved and ac - • ed: 4, A iiI i ._ id / A Co tr. ctor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. L f Idaimptroller Appr• -d as to form: �.....�.. _ emu. .► �� City Attor -y CONTRACT: 10 -06 CHANGE ORDER # 2 CONCRETE SIDEWALK (New and Reconstruction) ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Sidewalk removal & driveway removal, Square complete as specified Feet 94,250.00 90,001.74 - 4,248.26 0.33 ($1,401.93) 2 Concrete /asphalt sawing, Linear complete as specified Feet 4,750.00 5,528.21 778.21 2.00 1,556.42 3 Construct 4" thick concrete sidewalk in various locations in the City of Oshkosh, complete as Square specified Feet 91,000.00 90,591.05 - 408.95 2.84 ($1,161.42) 4 Construct 6" thick concrete sidewalk in various locations in the City of Oshkosh, complete as Square specified Feet 16,750.00 13,166.02 - 3,583.98 3.14 ($11,253.70) 5 Construct 7" thick crosswalk areas, complete Square as specified Feet 4,000.00 1,577.87 - 2,422.13 3.28 ($7,944.59) 6 Provide and install metal detectable warning plates, complete as specified Square Feet 200.00 144.00 -56.00 28.00 ($1,568.00) 7 Three (3 ") inch asphalt replacement, complete as Square specified Feet 2,250.00 1,324.05 - 925.95 3.70 ($3,426.02) 8 Curb and gutter removal, Linear complete as specified Feet 425.00 218.70 - 206.30 3.50 ($722.05) 9 Construct 30" curb and gutter, complete as Linear specified Feet 425.00 233.70 - 191.30 16.80 ($3,213.84) 10 Terrace restoration, including seed, fertilizer, and mulch, complete as Square specified Yards 2,000.00 1,095.63 - 904.37 3.90 ($3,527.04) 11 Furnish and install pavement ties, complete as specified Each 150.00 65.00 _ -85.00 6.00 ($510.00) 12 Construct 4" thick concrete sidewalk in Water Dept. repair locations as approx. 60 sites, complete as Square specified Feet 2,500.00 735.41 - 1,764.59 4.13 ($7,287.76) 13 Construct 6" thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as Square specified Feet 1,000.00 116.50 - 883.50 4.30 ($3,799.05) 14 7" non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, Square complete as specified Yards 100.00 32.50 -67.50 39.00 ($2,632.50) Page 1 of 4 CONTRACT: 10 -06 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 15 8" non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terrace & traffic control, Square complete as specified Yards 1,750.00 439.16 - 1,310.84 39.20 ($51,384.93) 16 8" special High Early Strength, non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading, terracing and traffic control, Square complete as specified Yards 150.00 0.00 - 150.00 46.50 ($6,975.00) 17 Extra crushed stone base, complete as specified Tons 150.00 182.30 32.30 12.00 387.60 18 No. 4 epoxy- coated reinforced rods, installed Linear as specified Feet 300.00 92.00 - 208.00 1.50 ($312.00) 19 Furnish, install, and maintain Type "C" inlet protection, complete as specified Each 5.00 0.00 -5.00 40.00 ($200.00) 20 Furnish, install, and maintain Type "D" inlet protection, complete as specified Each 40.00 66.00 26.00 40.00 1,040.00 21 Construct 12" wide radius curb head, complete as Linear specified Feet 150.00 71.00 -79.00 3.50 ($276.50) 22 Furnish, install, and maintain erosion mat, Square complete as specified Yards 100.00 214.71 114.71 1.75 200.74 23 Profile sawcut concrete Linear curb, complete as specified Feet 50.00 0.00 -50.00 40.00 ($2,000.00) SUB -TOTAL CONCRETE SIDEWALK (NEW & RECONSTRUCTION) 3,184.76 ($109,596.33) CONCRETE SIDEWALK (New and Reconstruction) ADDITIONAL ITEMS ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 24 8 "/7 -bag non - reinforced concrete removal & replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, Square complete as specified Yards 0.00 882.19 882.19 45.25 39,919.10 Page 2 of 4 CONTRACT: 10 -06 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 25 8 "/8 -bag non - reinforced concrete removal & replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, Square complete as specified Yards 0.00 528.73 528.73 46.04 24,342.73 26 Construct 8" thick concrete sidewalk, complete as Square specified Feet 0.00 1,937.60 1,937.60 4.19 8,118.54 27 Construct 8" thick concrete sidewalk, 9 -bag mix, complete as specified Square Feet 0.00 220.00 220.00 6.85 1,507.00 28 Construct 4" thick concrete sidewalk, 8 -bag mix, complete as specified Linear Feet 0.00 157.52 157.52 5.72 901.01 ADDITIONAL ITEMS - CONCRETE SIDEWALK 74,788.38 $0.00 CHANGES TO CHANGE ORDER #1 ADDITIONAL WORK PER QUOTE FOR W. MURDOCK AVENUE PAVEMENT: CONCRETE PAVING ITEM C/O #1 INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 100 Sidewalk & driveway Square removal, complete as Feet specified 585.00 554.20 -30.80 0.50 ($15.40) 101 8" Concrete pavement including integral curb, pavement removal, sawcut, Square pavement ties, and Yards landscaping, complete as specified 625.00 683.40 58.40 42.75 2,496.60 102 12" Radius curb head, Linear complete as specified Feet 48.00 74.90 26.90 4.00 107.60 103 Standard 30" curb & gutter, Linear 7" (tie -in), complete as Feet specified 15.00 14.10 -0.90 22.50 ($20.25) 104 4" Concrete sidewalk, Square complete as specified Feet 300.00 457.20 157.20 2.90 455.88 105 6" Concrete sidewalk & Square driveway, complete as Feet specified 286.00 98.20 - 187.80 3.35 ($629.13) 106 3 1/2" Asphaltic concrete transition, with base, Square complete as specified Yards 105.00 107.20 2.20 41.40 91.08 107 Adjust manholes and inlets, complete as specified Each 4.00 8.00 4.00 250.00 1,000.00 Page 3of4 CONTRACT: 10 -06 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 108 Provide and install metal Square detectable warning plates, Feet complete as specified 16.00 16.00 28.00 CHANGES TO CHANGE ORDER #1 - CONCRETE PAVING - SUB - TOTALS 4,151.16 ($664.78) 82,124.30 ($110,261.11) NET DECREASE TO CONTRACT 10 -06: (28,136.81) Page 4 of 4