HomeMy WebLinkAboutPW CNT 10-12/CNG 1 City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 OJHKOJH ON THE WATER November 1, 2010 Mr. David Tenor David Tenor Corporation 2759 Dewey Decker Drive Green Bay, WI 54313 Re: Change Order #1, Contract 10 -12 Dear Mr. Tenor: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and David Tenor Corporation regarding the above- mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, Nevi d . `? v /c-e/vvc..i David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original) CHANGE ORDER # 1 DATED: 10/13/2010 TO: David Tenor Corporation 2759 Dewey Decker Dr Green Bay, WI 54313 Your present contract with the City of Oshkosh, Contract No. 10 - 12 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING $42,951.00 NET INCREASE TO: SECTION III - SANITARY SEWER $19,538.18 NET INCREASE TO: SECTION IV - WATER MAIN $8,086.00 NET INCREASE TO CONTRACT: $70,575.18 CITY OF OSHKOSH BY: ' Recommended: City Manager- C-, ./ Director of Public Works City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. 1 `or--44 Comptroller App oved as to for • City Atto CONTRACT: 10 -12 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 100 Furnish and install 3'/2' asphaltic concrete pavement with 9" base, Square complete as specified Yards 625 641.15 16.15 $19.10 $308.47 101 Furnish and install 3' /" asphaltic concrete pavement with 6" base, Square complete as specified Yards 300 602.87 302.87 $19.10 $5,784.82 102 Concrete pavement removal, complete as Square specified Yards 1,155 2,515.54 1,360.54 $2.70 $3,673.46 103 8" concrete pavement, HES, and 6" base material and grading, complete as Square specified Yards 1,810 2,515.54 705.54 $36.32 $25,625.21 104 Furnish and install pavement ties (epoxy coated), complete as specified Each 1,060 1,230.00 170.00 $6.75 $1,147.50 105 Asphalt sawing, complete Linear as specified Feet 925 976.74 51.74 $0.77 $39.84 106 Furnish and install full depth concrete sawing, Linear complete as specified Feet 3,145 3,300.50 155.50 $1.49 $231.70 107 Furnish, install, and maintain Type "D" inlet protection std., complete as specified Each 25 24.00 -1.00 $90.00 ($90.00) 108 Furnish, install, and maintain silt fence, Linear complete as specified Feet 60 0.00 -60.00 $2.50 ($150.00) 109 Terrace restoration on Linden Oaks, complete as Lump specified Sum 1 1.00 $3,000.00 110 Terrace restoration on Shorewood, complete as Lump specified Sum 1 1.00 $2,400.00 111 Terrace restoration on Murdock Avenue, complete Lump as specified Sum 1 1.00 $300.00 112 Terrace restoration on Merritt Avenue, complete Lump as specified Sum 1 1.00 $300.00 113 Adjust manholes and inlets, complete as specified Each 8 10.00 2.00 $220.00 $440.00 114 Terrace Restoration on Waukau Avenue and Oregon Street, complete as Lump specified Sum 1 1.00 $1.00 SECTION I - (BID ITEMS 100 - 114) - SUB - TOTALS $37,251.00 ($240.00) Page 1 of 6 CONTRACT: 10 -12 CHANGE ORDER # 1 ADDITIONAL WORK REQUIRED: C.O. # 1- SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 115 Furnish & install additional curb & gutter sections on Murdock Ave & Menominee Ave due to poor subgrade, complete as specified Linear Feet 0.00 270.00 270.00 $22.00 $5,940.00 ADDITIONAL WORK: C.O. # 1 - (ITEM 115) - SUB -TOTAL $5,940.00 $0.00 NET INCREASE TO: SECTION I $42,951.00 SECTION III - SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 300 Furnish and install 8" sanitary sewer (relay), Linear complete as specified Feet 40 59.50 19.50 $143.00 $2,788.50 301 Furnish and install 8" sanitary sewer (new), Linear complete as specified Feet 540 630.40 90.40 $73.95 $6,685.08 302 Furnish and install std. sanitary manhole (4' inside diameter) in various locations, complete as specified, without casting Vertical Feet 52 60.14 8.14 $190.00 $1,546.60 303 Furnish and install 8" x 4" factory wyes or tees, complete as specified Each 4 9.00 5.00 $75.00 $375.00 304 Furnish and install 8" x 6" factory wyes or tees, complete as specified Each 3 0.00 -3.00 $80.00 ($240.00) 305 Furnish and install new 4" sanitary laterals, complete Linear as specified Feet 70 97.50 27.50 $47.00 $1,292.50 306 Furnish and install 4'Y6" sanitary lateral relay, Linear complete as specified Feet 10 55.00 45.00 $55.00 $2,475.00 307 Furnish and install sanitary lateral marker balls, complete as specified Each 14 14.00 $24.00 308 Core into existing manhole, complete as specified Each 1 1.00 $750.00 309 Furnish and install concrete collars, complete as specified Each 2 0.00 -2.00 $350.00 ($700.00) Page 2 of 6 CONTRACT: 10 -12 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 310 Abandon 8" sanitary sewer at various locations Linear complete as specified Feet 180 180.00 $3.25 311 Furnish and install solid sleeves, complete as specified Each 18 14.00 -4.00 $380.00 ($1,520.00) 312 Furnish and install 10" sanitary sewer (relay), Linear complete as specified Feet 95 112.00 17.00 $63.50 $1,079.50 313 Furnish and install 12" sanitary sewer (relay), Linear complete as specified Feet 70 80.00 10.00 $65.00 $650.00 344 ch and .,.eta!! Removed main, complete as from cpccificd Contract 9 0.00 315 Furnish and install 12" x 6" factory wyes or tees, complete as specified Each 3 1.00 -2.00 $185.00 ($370.00) 316 Furnish and install 10" x 6" factory wyes or tees, complete as specified Each _ 2 1.00 -1.00 $160.00 ($160.00) SECTION III - (BID ITEMS 300 - 316) - SUB - TOTALS $16,892.18 ($2,990.00) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 317 Furnish & install 12" culvert on Shorewood Drive to replace rusted C.M.P., complete as specified Lump Sum 0.00 1.00 1.00 $1,100.00 $1,100.00 318 Furnish & install 12" storm sewer inlete leads on E. Murdock Ave. to replace existing rusted out C.M.P. leads, complete as Linear specified _ Feet 0.00 94.50 94.50 $48.00 $4,536.00 ADDITIONAL WORK: C. O. # 1 - (ITEMS 317 - 318) - SUB - TOTAL $5,636.00 $0.00 NET INCREASE TO: SECTION III $19,538.18 Page 3of6 CONTRACT: 10 -12 CHANGE ORDER # 1 SECTION IV - WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 400 Furnish and install 6" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 75 66.50 -8.50 $65.00 ($552.50) 401 Furnish and install 8" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 1,300 1,361.00 61.00 $61.95 $3,778.95 402 Furnish and install 1" water service relay, complete as specified, not including corporation and stop box Linear Feet 85 79.00 -6.00 $39.45 ($236.70) 403 Furnish and install new 1" water service, complete as specified, not including corporation and stop box Linear Feet 60 113.00 53.00 $39.00 $2,067.00 404 Furnish and install 1" corporation and stop box with stainless steel rod, complete as specified Each 2 5.00 3.00 $250.00 $750.00 405 Furnish and install 8" x 6" tees, complete as specified Each 3 6.00 3.00 $380.00 $1,140.00 406 Furnish and install 8" x 8" tees, complete as specified Each 1 1.00 $400.00 407 Furnish and install 8" - 11 % degree bends, complete as specified Each 1 1.00 $270.00 408 Furnish and install 6" - 45 degree bends, complete as specified Each 1 1.00 $190.00 409 Furnish and install 8" - 45 degree bends, complete as specified Each 4 2.00 -2.00 $260.00 ($520.00) 410 Furnish and install 6" cap, complete as specified Each 1 2.00 1.00 $195.00 $195.00 411 Furnish and install 8" cap, complete as specified Each 2 1.00 -1.00 $230.00 ($230.00) 412 Furnish and install 8" x 6" reducers, complete as specified Each 3 2.00 -1.00 $220.00 ($220.00) 413 Furnish and install 6" sleeve, complete as specified Each 1 0.00 -1.00 $190.00 ($190.00) 414 Furnish and install 8" sleeve complete as specified Each 1 2.00 1.00 $270.00 $270.00 Page 4 of 6 CONTRACT: 10 -12 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 415 Furnish and install 6" valves, complete as specified Each 3 4.00 1.00 $960.00 $960.00 416 Furnish and install 8" valves, complete as specified Each 5 6.00 1.00 $1,300.00 $1,300.00 417 Furnish and install 6" x 6" tapping valve and sleeve, complete as specified Each 1 1.00 $2,350.00 418 Furnish and install 8" x 8" tapping valve and sleeve, complete as specified Each 1 0.00 -1.00 $2,650.00 ($2,650.00) 419 Furnish and install hydrants, complete as specified Each 4 3.00 -1.00 $2,650.00 ($2,650.00) 420 Furnish and install gradeloks for hydrant branches, complete as specified Each 4 1.00 -3.00 $400.00 ($1,200.00) 421 Furnish and install connections of new water main to existing water main (various sizes and locations), complete as specified Each 4 4.00 $1,300.00 422 Abandon water main on Murdock, complete as Lump specified Sum 1 1.00 $1,200.00 423 Furnish and install 12" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 50 33.50 -16.50 $84.50 ($1,394.25) 424 Furnish and install 12" x 12" tapping valve and sleeve, complete as specified Each 1 1.00 $3,900.00 425 Furnish and install 16" x 12" tapping valve and sleeve, complete as specified Each 1 1.00 $4,300.00 426 Furnish and install 12" — 45 degree bends, complete as specified Each 2 2.00 $500.00 427 Furnish and install corporation ONLY, complete as specified Each 9 9.00 $200.00 SECTION IV - (BID ITEMS 400 -427) - SUB - TOTALS $10,460.95 ($9,843.45) Page 5 of 6 CONTRACT: 10 -12 CHANGE ORDER # 1 ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 428 Furnish & install 8 "x8 "x8" anchoring tee, complete as specified Each 0.00 1.00 1.00 $425.00 $425.00 429 Furnish & install 8" M.J. plug, complete as specified Each 0.00 2.00 2.00 $230.00 $460.00 430 Furnish and install 6" - 11.25 degree bends, complete as specified Each 0.00 1.00 1.00 $190.00 $190.00 431 Furnish and install 6" - 22.50 degree bends, complete as specified Each 0.00 1.00 1.00 $190.00 $190.00 432 Additional labor, equipment, and materials to fix unmarked water lateral at 1976 E. Murdock Ave, complete as specified Lump Sum 0.00 1.00 1.00 $1,306.00 $1,306.00 433 Additional labor, equipment, and materials to fix broken watermain on E. Murdock Ave., complete as Lump specified Sum 0.00 1.00 1.00 $1,632.50 $1,632.50 434 Additional labor, equipment, and materials to field adjust watermain to avoid existing watermain joints on E. Murdock Ave., complete as specified Lump Sum 0.00 1.00 1.00 $1,959.00 $1,959.00 435 Additional labor, equipment, and materials to field adjust watermain to avoid existing an Oshkosh Truck Fiber Optic line on W. Waukau Ave., complete as specified Lump Sum 0.00 1.00 1.00 $1,306.00 $1,306.00 ADDITIONAL WORK: C.O. # 1 (ITEMS 428 - 434) - SUB - TOTAL $7,468.50 $0.00 NET INCREASE TO: SECTION IV $8,086.00 NET INCREASE TO SECTIONS I, III, IV $83,648.63 NET DECREASE TO SECTIONS I, III, IV ($13,073.45) NET INCREASE TO CONTRACT: $70,575.18 Page 6 of 6