Loading...
HomeMy WebLinkAboutPW CNT 10-05/CNG 2 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 Fa. (920) 236 -5065 OfHK01H Fax (920) 236 -5068 ON THE WATER October 14, 2010 Mr. Bill Bowers Carl Bowers & Sons Construction Company N1844 Maloney Road Kaukauna, WI 54130 Re: Change Order #2 /Contract 10 -05 Dear Mr. Bowers: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Carl Bowers & Sons Construction Company regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original) 1: \Engineering\l0 -05 Concrete Paving - SOUTH \Project Information \Contract Page 1 of 1 Info \CHANGE ORDERS \10 -05 Change Order Letter #1 _ doc CHANGE ORDER # 2 DATED: September 23, 2010 TO: Carl Bowers & Sons Construction Company N1844 Maloney Road Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No. 10 -05 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING $0.00 NET INCREASE TO: SECTION II - STORM SEWER $8,181.72 NET INCREASE TO: SECTION III - SANITARY SEWER $10,838.07 NET INCREASE TO: SECTION IV - WATER MAIN $4,780.00 NET INCREASE TO CONTRACT: $23,799.79 CITY OF OSHKOSH BY: Recommended: City Ma ag- Director of Public Works City Clerk Approved and accepted: q Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. wr „mptroller Ap roved as to form: City Attorr ey CONTRACT: 10 - 05 CHANGE ORDER # 2 SECTION II - STORM SEWER ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION II ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 235 Additional labor, materials, and equipment to remove and replace 24" storm sewer from junction chamber to existing manhole due to poor condition of existing pipe in the W. 6th Ave. and Dakota St. intersection. Also installed new Type 3 inlet and installed 8" PVC from existing manhole to inlet and from inlet to existing yard drain, per Lump Invoice SCI 0043 Sum 0.00 1.00 1.00 $6,111.00 $6,111.00 236 Furnish & install steel plates on two storm manholes due to shallow depth, per Invoice SCI 0044 Each 0.00 2.00 2.00 $1,035.36 $2,070.72 ADDITIONAL WORK: C.O. # 2 (ITEMS 235 -236) - SUB -TOTAL $8,181.72 $0.00 NET INCREASE TO: SECTION II $8,181.72 SECTION III - SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 320 Additional labor, materials, and equipment to install a drop manhole whose alignment did not match existing sanitary sewer main both vertically and horizontally, per Invoice SCI0037 Hrs 1.00 2.00 1.00 $1,030.00 $1,030.00 SECTION III - (BID ITEM 320) - SUB -TOTAL $1,030.00 $0.00 Page 1 of 3 CONTRACT: 10 - 05 CHANGE ORDER # 2 ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION III ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 321 Additional labor, materials, and equipment to excavate and investigate for excessive ground water at #641 W. 8th Ave. Work included excavation, plugging abandoned sanitary sewer in terrace, installing bentanite dam with slurry backfill due to lateral location in existing driveway, per Invoice SCI Lump 0044 Sum 0.00 1.00 1.00 $3,279.42 $3,279.42 322 Additional labor, materials, and equipment to repair sanitary sewer lateral located at 611 W. 8th Ave., that bored through by WPS Gas Company, per Hietpas Invoice dated 6/15/10 Lump Sum 0.00 1.00 1.00 $405.00 $405.00 323 Additional labor, equipment, and materials to install new wye and cap existing wye due to televising reports being 10 feet off at the following addresses: 742, 682, 676, 672, 662, and 648 W. 8th Ave, per Hietpas Invoices Lump dated 6/15/10 Sum 0.00 1.00 1.00 $5,783.65 $5,783.65 324 Additional labor, materials, and equipment to repair sanitary sewer lateral located at 630 W. 8th Ave., that bored through by WPS Gas Company, per Hietpas Invoices dated 6/15/10 Lump Sum 0.00 1.00 1.00 $340.00 $340.00 ADDITIONAL WORK: C. O. # 2 - (ITEMS 321 -324) - SUB -TOTAL $9,808.07 $0.00 NET INCREASE TO: SECTION III $10,838.07 Page 2 of 3 CONTRACT: 10 - 05 CHANGE ORDER # 2 SECTION IV - WATER MAIN ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 447 Furnish & install 8" plug, complete as specified Each 0.00 1.00 1.00 $175.00 $175.00 448 Furnish & install 6" plug, complete a specified Each 0.00 1.00 1.00 $210.00 $210.00 449 Furnish & install 6" 11 -1/4 Degree Bend, complete as specified Each 0.00 1.00 1.00 $215.00 $215.00 450 Furnish & install 1 -1/2" copper water services, Linear complete as specified Feet 0.00 22.50 22.50 $48.00 $1,080.00 451 Furnish & install 1 -1/2" corporations and stop boxes, complete as specified Each 0.00 2.00 2.00 $350.00 $700.00 452 Furnish & install 6" X 12" offset, complete as specified Each 0.00 1.00 1.00 $375.00 $375.00 453 Furnish & install 10" sleeve, complete as specified Each 0.00 1.00 1.00 $350.00 $350.00 454 Additional labor, materials, and equipment to excavate and investigate the potential leak of the 16" watermain Dakota Street, per Invoice SCI 0045 Lump Sum 0.00 1.00 1.00 $1,675.00 $1,675.00 ADDITIONAL WORK: C.O. # 2 (ITEMS 447 -454) - SUB -TOTAL $4,780.00 $0.00 NET INCREASE TO: SECTION IV $4,780.00 NET INCREASE TO SECTIONS I, II, III, IV $23,799.79 NET DECREASE TO SECTIONS I, II, III, IV $0.00 NET INCREASE TO CONTRACT: $23,799.79 Page 3 of 3