Loading...
HomeMy WebLinkAboutPW CNT 10-15/CNG 1 STRAND ASSOCIATES, INC. E N G I N E E R S 910 West Wingra Drive Madison, WI 53715 December 1, 2010 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Mr. Steve Brand, Superintendent of Utilities Madison, WI City of Oshkosh Joliet, IL City Louisville, KY 215 Church Avenue Lexington, KY P.O Box 1130 Mobile, AL Columbus, IN Oshkosh, WI 54903 Columbus, OH Indianapolis, IN Milwaukee, WI Re: Contract 10 -15 Cincinnati, OH Phoenix, AZ Change Order No. 1 www.strand.com Dear Steve, Enclosed are the formal copies of Change Order No. 1 that modifies the project completion date to September 30, 2011, an extension of 61 days. As you are aware, the fabrication, delivery, and installation schedule of the Vulcan Wash Press and Conveyor Equipment under Contract 10 -15 would put this portion of the project outside of the contract completion deadline. The manufacturer and delivery schedule of this equipment is outside the control of J.F. Ahern. Vulcan Industries has provided a letter (copy enclosed) outlining its schedule. I have also included a copy from J.F. Ahern outlining its proposed project schedule incorporating the Vulcan delivery timeframes. As discussed, the original substantial completion date will be held for the remaining portions of the project that can be completed within the original contract deadline. If this change order is acceptable, please forward to the City for processing and signatures. If you or any staff have any questions concerning this change order, please contact me. Thank you and have a great day. 1-- 3r_ Sincerely, I1. r l -At i` _ STRAND ASSOCIATES, INC.© A `Y`"' o ` � t cd-c `r J , 'c r c �; 1� u r h r� � . Gam' Jeffrey S. Rau, P.E. c:G G-' CSt l lL 44 �� �u"" Proj ect Manager ^ ' i Enclosures `��` :��� 5. - T S Cy,, '1= c /enc.: Tom Foltz, Strand Associates ' 1, Win .; �� JSR:gb1S:\MAD 11 3 0 0-- 1 3 9 911 3 3210 4 31Wrd1Change Orders llt 112210sbrand.docx STRAND ASSOCIATES. INC E N G I N E E R S 910 West Wingra Drive Madison, WI 53715 November 24, 2010 Phone: 608- 251 -4843 Fax: 608-251-8655 Office Locations CHANGE ORDER NO. 1 Madison, WI Joliet, IL Louisville, KY Lexington, KY PROJECT: Consolidated Treatment Plant and Pumping Station Improvement Projects Mobile, AL OWNER: City of Oshkosh Columbus, IN Columbus, OH CONTRACT: 10 -15 Indianapolis, IN CONTRACTOR: J.F. Ahern Milwaukee, WI Cincinnati, OH Phoenix, AZ Description of Change 1 a Under Paragraph 4.02 of Section 00520, replace No Change $0.00 www.strand.com Paragraph A with the following: A. Work on the project with the exception of the installation of the wash press, conveyor equipment, and connection piping at the South Main and Broad Street Pumping Stations will be substantially complete on or before June 30, 2011. Installation of the wash press, conveyor equipment, and connection piping at the South Main and Broad Street Pumping Stations will be substantially complete on or before August 30, 2011, and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before September 30, 2011. TOTAL VALUE OF THIS CHANGE ORDER: $0.00 Contract Price Adjustment Original Contract Price $999,000.00 Previous Change Order Adjustments $ 0.00 Adjustment in Contract Price this Change Order $ 0.00 Current Contract Price including this Change Order $999,000.00 Contract Completion Date Adjustment Original Contract Completion Date July 31, 2011 Contract Completion Date Adjustments due to previous Change Orders None Contract Completion Date Adjustments due to this Change Order 61 Days Current Contract Completion Date including all Change Orders September 30, 2011 City of Oshkosh -J.F. Ahern Co. Contract 10 -15, Change Order No. 1 STRAND Page 2 ASSOCIATES, IN= November 24, 2010 E N G I N E E R S This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED £ 0 / 2 9 //a ENGINEER— trand Associates, Inca Date APPROVED 1)..W 1)12-(iii0 CONTRACTOR —J.F. Ahern Company Date RECOMMENDED BY OWNER OWNER — Director of Public Works, City of Oshkosh Date APPROVED BY OWNER OW R —Mark A. Rohloff, City Manager, City of Oshkosh Date 4 L , _ a lt__1s ! lit, LL4L OWNER— Pamela R. Ubrig, City ler, City of Osh os 1 Da I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under this Change Order. (P/00 OWNER —Peggy S eno, Director of Finance, City of Oshkosh Date APPR i ED AS TO F • • • '\A_- )/atob..0 l 0 ► - nn Loreii o i Attorney, City of Oshkosh Date JSR.gb \S: \MAD \I300 -- 1399 \1382 \043 \Wrd \Change Orders \CO 1 docx