HomeMy WebLinkAboutPW CNT 09-19/CNG 1 4 5311
STRAND
ASSOCIATES, INC.'
N 0 I N c E 5 E
Transmittal Letter
910 West Wingra Drive To: City of Oshkosh
Madison, WI 53715
Phone: 608 -251 -4843
Fax: 608 - 251 -8655
Office Locations
From: Matthew Merten
Madison, WI
Joliet, IL Date: December 28, 2010 Project No.: 1382.044
Lexington, KY
Louisville, KY Attention: Steve Brand
Mobile, AL Re: Oshkosh Lift Stations and Flow Stations SCADA Upgrade
Columbus, IN pg
Columbus, OH
Indianapolis, IN
Milwaukee, WI
Cincinnati, OH WE ARE SENDING YOU: ❑ Enclosed El Under Separate Cover
Phoenix, AZ p
www.strand.com ❑ Shop Drawings ❑ Change Order ❑ Copy of Letter
El Specifications ❑ Drawings ❑ Samples
® Other: Change Order No. 1_
Copies Date No. Description
3 Change Order No. 1
THESE ARE TRANSMITTED as checked below:
® For approval ❑ Approved as submitted ❑ Resubmit copies for approval
® For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑ Other
Remarks: Please have all appropriate parties sign the three copies of the Change Order and return two
copies to us. Contact me with any questions.
-3r - 2o f
,.r
J- Signed: 1
Matthew Merten
Copy to:
r
=�. n 4: t �i � E - tic _ -;4
S:W1AD 1300 - 1399 \1382 \0441Wrd \Construction Services \RFPs & Change Orders\Transmittal Letter to Owner CO #1_12-28-2010 door '
Sa
STRAND
ASSOCIATES, INC.
E N G I N E E R S
910 West Wingra Drive
Madison, WI 53715 December 10, 2010
Phone: 608-251-4843
Fax: 608-251-8655
Office Locations CHANGE ORDER NO. 1
Madison, WI
Joliet, IL
Louisville, KY PROJECT: Lift Stations and Flow Stations SCADA Upgrade
Lexington, KY OWNER: City of Oshkosh
Mobile, AL
Columbus, IN CONTRACT: 09 -19
Columbus, OH CONTRACTOR: Faith Technologies, Inc.
Indianapolis, IN
Milwaukee, WI
Cincinnati, OH
Phoenix, AZ Description of Change
www.strand.com la Replace existing Allen Bradley Micrologix ADD $28,108.50
1500 PLCs at five lift stations with Allen
Bradley Micrologix 1400 PLCs. Includes the
cost for PLC programming at Broad Street Lift
Station for Ethernet communication between
RTU -5 and four wet weather pumps.
1 Provide Ethernet cables between RTU -5 and ADD $ 1,243.25
the four wet weather pumps at Broad Street Lift
Station.
lc Provide a 200 -amp, 480 -volt, 3 -phase generator ADD $ 8,341.20
receptacle at County Y Lift Station, two relay
sockets for future MiniCAS units at Hickory,
Washburn, Prairie Court, and County Y lift
stations, 8- channel Ethernet switch in RTU -5 at
Broad Street Lift Station, and an analog
repeater module for each radar level transmitter
at 28th Street, Murdock, Northside, Snell Road,
Punhoqua, Washburn, Prairie Court, and
Sawyer Creek Lift Stations.
ld Provide pole - mounted light fixture at 28th DEDUCT ($11,931.52)
Street Lift Station and light pole and fixture at
Waukau Lift Station. Replace radios with
telephone modems in the RTU panels at Black
Wolf, Sunset, and Island View Flow Stations.
Includes not providing the light poles at Sunset
and Island View Flow Stations, not installing
the new RTU panels at Sunset and Island View
Flow Stations, and not providing the 100 -foot
antenna towers at Black Wolf Flow Station and
Broad Street Lift Station.
Sa City of Oshkosh -Faith Technologies, Inc.
Contract 09 -19, Change Order No. 1
STRAND Page 2
ASSOCIATES, INC.^"
E N G I N E E R S December 10, 2010
le Provide additional cables for SCADA ADD $ 1,281.53
computers and monitors in the Control Room at
the WWTP.
1 f Provide a repeater panel and associated ADD $15,395.47
antennas at Court Tower and install an antenna
at Broad Street Lift Station.
lg Provide conduit between the electrical service ADD $ 2,741.37
mounting station and the lift station hatch at
Fountain Avenue Lift Station.
TOTAL VALUE OF THIS CHANGE ORDER: ADD $45,179.80
Contract Price Adjustment
Original Contract Price including the Contract Contingency $991,145.00
Allowance
Contract Contingency Allowance for Changes $100,000.00
Total Value of this Change Order $ 45,179.80
Current Contingency Allowance Balance including this $ 54,820.20
Change Order
Adjustment in Contract Price this Change Order $ 0.00
Contract Completion Date Adjustment
Original Contract Completion Date October 29, 2010
Contract Completion Date Adjustments due to previous 0 Days
Change Orders
Contract Completion Date Adjustments due to this 94 Days
Change Order
Current Contract Completion Dates including all January 31, 2011
Change Orders
MJM:dIN.S:\MAD\ 1300-1399113821044 Wrd \Construction Services \RFPs & Change Orders \Change Order No. 1_12- 8- 10.docx
Sal City of Oshkosh -Faith Technologies, Inc.
Contract 09 -19, Change Order No. 1
STRAND Page 3
ASSOCIATES, INC. (
ENGINEERS December 10, 2010
This document shall become a supplement to the Contract and all provisions will apply
hereto.
RECOMMENDED
'z/'° /i °
ENGINEER— Strand Associates, Inc. Date
APPROVED
CONTRACTOR— aith Technologies, Inc. Date
RECOMMENDED BY OWNER
OWNER — Director of Public Works, City of Oshkosh Date
APPROVED BY OWNER
•
( /),6 /1/
OWNER—Mark A. Rohloff, City Manager, City of Oshkosh Date
a AIL
A-4 : I (
OWNER — Pamela R. Ubrig, Cit Clerk, City of osh Date
I certify that provision has been made to pay the liability that
will accrue to the City of Oshkosh, Wisconsin, under this
Change Order.
csL
/ o/1
OWNER e • ySteeno, Director of Finance, City of Date
Oshkosh
AP' . OVED AS TO FORM
1 .►:.. \ 1 id �.� ICI
' —Lynn Lorens • • , City Attorney, City of Oshkosh D to
MJM:dlh \S: \MAD11 300-1399 113821044 \Wrd \Construction Services'RFPs & Change Orders \Change Order No. 1_12- 8- 10.docx