HomeMy WebLinkAboutPW CNT 08-01/CNG 3 CHANGE ORDER # 3 DATED: July 9, 2010 TO: S. J. LOUIS CONSTRUCTION, INC. 1351 W. BROADWAY STREET P.O. BOX 459 ROCKVILLE, MN 56369 Your present contract with the City of Oshkosh, Contract No. 08 -01 , is hereby amended and changed as follows: NET DECREASE TO: SECTION I - CONCRETE PAVING ($75,612.34) NET INCREASE TO: SECTION II - STORM SEWER $9,448.46 NET INCREASE TO: SECTION III - SANITARY SEWER $16,698.85 NET INCREASE TO: SECTION IV - WATER MAIN $41,967.50 NET INCREASE TO SECTION V - WORK UNIT B STORM SEWER $25,896.96 NET DECREASE TO CONTRACT: $18,399.43 CITY OF OSHKOSH BY: /' ag__ Recommended: 1 City M. • - - �o�d G. Pc�fe Ire �IL���• Director of Public Works City Clerk Approved and accepted: Co actor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. omptroller Approved as to form: " 1 " ECEHE low City Atto - AUG 1 1 ?D'0 CITY C E CFF1CF • CONTRACT: 08 -01 CHANGE ORDER # 3 SECTION 1- CONCRETE PAVING ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES WCREASE DECREASE UNIT PRICE PRICE 100. Furnish and Install temporary security fence, Linear complete as specified Foot 9,000 7,091.97 - 1,908.03 $3.00 ($5,724.09) 101. Furnish and Install Traffic Control, complete as Lump specified Sum 1 1.00 $50,000.00 102. Furnish Clearing and grubbing, complete as Lump specified Sum 1 1.00 $13,000.00 103. Pavement removal with integral curb, complete as Square specified Yards 5,700 5,682.70 -17.30 $3.00 ($51.90) 104. Pavement removal in spot locations, complete as Square specified Yards 700 675.60 -24.40 $4.50 ($109.80) 105. Concrete sidewalk and driveway removal, Square complete as specified Feet 5,150 14,297.40 9,147.40 $1.00 $9,147.40 106. Concrete curb &/or concrete curb and gutter removal, complete as Linear specified Feet 900 4,117.60 3,217.60 $2.00 $6,435.20 107. Unclassified Excavation, Lump complete as specified Sum 1 1.00 $44,000.00 108. 8" non - reinforced concrete pavement, including integral curb, base in place, complete as specified Square Yards 5,500 4,914.30 - 585.70 $35.00 ($20,499.50) 109. 8" non - reinforced concrete pavement, special H.E.S. (9 -bag) including integral curb, base in place, complete as specified Square Yards 300 998.90 698.90 $42.00 $29,353.80 110. 8" non - reinforced concrete pavement, base in place, spot locations, complete as Square specified Yards 700 575.30 - 124.70 $45.00 ($5,611.50) 111. Concrete median nose and sidewalk, complete as Square specified Feet 900 143.80 - 756.20 $5.50 ($4,159.10) 112. Standard 30" curb and gutter, 8" mainline, Linear complete as specified Feet 900 1,386.70 486.70 $14.00 $6,813.80 113. Standard 30" curb and gutter. 8" mainline, spot repairs (Less than 30 feet in length), complete as Linear specified Feet 300 138.50 - 161.50 $23.00 ($3,714.50) 114. 6" concrete sidewalk & driveway, complete as Square specified Feet 6,500 5,152.40 - 1,347.60 $4.00 ($5,390.40) 115. 4" concrete sidewalk, Square complete as specified Feet 2,000 5,625.20 3,625.20 $3.60_ $13,050.72 Page 1 of 11 • CONTRACT: 08-01 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 116. 2" asphaltic concrete driveway and pathway, lower layer, complete as specified Tons 150 145.64 -4.36 $100.00 ($436.00) 117. 1 ' /z' asphaltic concrete driveway and pathway, upper layer, complete as specified Tons 125 145.64 20.64 $87.00 $1,795.68 118. 3 W asphaltic concrete pavement, lower layer, complete as specified Tons 730 662.04 -67.96 $65.00 ($4,417.40) 119. 1 %' asphaltic concrete pavement, upper layer, complete as specified Tons 600 547.45 -52.55 $65.00 ($3,415.75) 120. Preparation of foundation for asphalt paving on New York Avenue, complete as Lump specified Sum 1 1.00 $5,600.00 121. Tack or prime coat, complete as specified Gallon 150 100.00 -50.00 $3.50 ($175.00) 122. Furnish and install crushed stone base course, complete as specified Tons 13,000 5,615.00 - 7,385.00 $11.00 ($81,235.00) 123. Sawing, complete as Linear specified Feet 2,000 4,584.00 2,584.00 $4.00 $10,336.00 124. Furnish and install pavement ties (epoxy coated), complete as specified Each 1,500 1,187.00 - 313.00 $5.00 ($1,565.00) 125. Adjust manholes and inlets, complete as specified Each 110 73.00 -37.00 $225.00 ($8,325.00) 126. Furnish and install No. 4 reinforcing bars (epoxy coated), complete as specified Each 100 45.00 -55.00 $1.00 ($55.00) 127. Provide and install metal detectable warning plates, complete as specified Square Feet 288 224.00 -64.00 $30.00 ($1,920.00) 128. Furnish and install Geotextile fabric, complete Square as specified Yards 100 0.00 - 100.00 $10.00 ($1,000.00) 129. Remove and replace traffic signal loop detectors, complete as specified Linear Feet 150 0.00 - 150.00 $30.00 ($4,500.00) 130. Terrace work in Menominee Park from Parkway Avenue to New York Avenue, complete as Lump specified Sum 1 1.00 $165,000.00 131. Terrace work on New York Avenue from Hazel Street to Bowen Street, complete Lump as specified Sum 1 1.00 $24,000.00 Page 2 of 11 • CONTRACT: 08 -01 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 132. Terrace work on New York Avenue from Bowen Street to Canadian National Railroad Tracks, complete Lump as specified Sum 1 1.00 $18,000.00 133. 12" wide radius curb head, Linear complete as specified Feet 700 670.00 -30.00 $8.00 ($240.00) SECTION I - (BID ITEMS 100 - 133) - SUB - TOTALS $76,932.60 ($152,544.94) NET DECREASE TO: SECTION I ($75,612.34) SECTION II - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 200. Furnish and install 10" storm sewer, complete as Linear specified Feet 44 44.00 $22.00 201. Furnish and install 12" storm sewer, complete as Linear specified Feet 510 519.00 9.00 $23.00 $207.00 202. Furnish and install 15" storm sewer, complete as Linear specified Feet 20 69.00 49.00 $24.00 $1,176.00 203. Furnish and install 18" storm sewer, complete as Linear specked Feet 70 94.00 24.00 $29.00 $696.00 204. Furnish and install 21" storm sewer, complete as Linear specified Feet 20 22.00 2.00 $33.00 $66.00 205. Furnish and install 24" storm sewer, complete as Linear specified Feet 20 24.00 4.00 $35.00 $140.00 207. Furnish and install 30" storm sewer, complete as Linear specified Feet 60 61.00 1.00 $47.00 $47.00 207. Furnish and install 42" storm sewer, complete as Linear specified Feet 95 94.00 -1.00 $77.00 ($77.00) 208. Furnish and install std. inlets (Type 3 with 18" sump), with castings, complete as specified Each 19 21.00 2.00 $1,150.00 $2,300.00 209. Furnish and install std. Storm manhole (4' inside diameter) in various locations without casting, Vertical complete as specified Feet 12 17.25 5.25 $600.00 $3,150.00 210. Furnish and install std. Inlets (Type 1 with 18" sump) with castings, complete as specified Each 3 3.00 $1,150.00 Page 3 of 11 CONTRACT: 08 -01 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 211. Furnish, install, and maintain Type "C" inlet protection in 10 locations, complete as specified Each 10 16.00 6.00 $44.00 $264.00 212. Furnish and install, and maintain Type "D" inlet protection in 75 locations, complete as specified Each 75 119.00 44.00 $100.00 $4,400.00 213. Furnish and install, and maintain silt fence, as shown on the plans, Linear complete as specified Feet 5,000 3,539.73 - 1,460.27 $2.00 ($2,920.54) 214. Furnish and install connections of new storm sewer to existing main (various sizes and locations), complete as specified Each 29 29.00 $800.00 SECTION II - (BID ITEMS 200 - 214) - SUB - TOTALS $12,446.00 ($2,997.54) NET INCREASE TO: SECTION II $9,448.46 SECTION III - SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 300. Furnish and install 60" sanitary sewer (Hobas Pipe), with native backfill Linear complete as specified Feet 3,270 3,187.60 -82.40 $370.00 ($30,488.00) 301. Furnish and install 60" sanitary sewer (Hobas Pipe) with granular backfill, Linear complete as specified Feet 1,800 1,883.95 83.95 $375.00 $31,481.25 302. Furnish and install 24" sanitary sewer (PVC Pipe), Linear complete as specified Feet 1,290 1,234.62 -55.38 $100.00 ($5,538.00) 303. Furnish and install 18" sanitary sewer (PVC Pipe), Linear complete as specified Feet 60 241.00 181.00 $90.00 $16,290.00 304. Furnish and install 15" sanitary sewer (PVC Pipe), Linear complete as specified Feet 960 958.61 -1.39 $80.00 ($111.20) 305. Furnish and install 12" sanitary sewer (PVC Pipe), Linear complete as specified Feet 110, 170.14 60.14 $75.00 $4,510.50 306. Furnish and install 10" sanitary sewer (PVC Pipe), Linear complete as specified Feet 100 116.72 16.72 $60.00 $1,003.20 Page 4of11 • CONTRACT: 08 -01 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 307. Furnish and install 8" sanitary sewer (PVC Pipe), Linear complete as specified Feet 135 129.15 -5.85 $55.00 ($321.75) 308. Jack and bore 36" steel casing pipe, complete as Lineal specified Feet 50 70.00 20.00 $1,200.00 $24,000.00 309. Furnish and install MH H -1, complete as specified, Lump without casting Sum 1 0.60 -0.40 $30,000.00 ($12,000.00) 310. Furnish and install MH H -2, complete as specified, Lump without casting Sum 1 1.00 $28,000.00 311. Furnish and install MH H -3 (Hobas Base Tee with Riser), complete as Lump specified, without casting Sum 1 1.00 $25,000.00 312. Furnish and install MH H-4 (Hobas Base Tee with Riser), complete as Lump specified, without casting Sum 1 1.00 $24,000.00 313. Furnish and install MH H -5 (Hobas Base Tee with Riser and Fabricated Bend, complete as specified, Lump without casting Sum 1 1.00 $27,000.00 314. Furnish and install MH H-6 (Hobas Base Tee with Riser and Fabricated Bend, complete as specified, Lump without casting Sum 1 1.00 $28,000.00 315. Furnish and install MH H -7 (Hobas Tee with Riser), complete as specified, Lump without casting Sum 1 1.00 $24,000.00 316. Furnish and install MH H -8 (Hobas Tee with Riser), complete as specified, Lump without casting Sum 1 1.00 $24,000.00 317. Furnish and install MH H -9 (Hobas Tee with Riser and Fabricated Bend), complete as specified, Lump without casting Sum 1 1.00 $29,000.00 318. Furnish and install MH H- 10, complete as specified, Lump without casting Sum 1 1.00 $25,000.00 319. Furnish and install MH H- 11, complete as specified, Lump without casting Sum 1 1.00 $36,000.00 320. Furnish and install MH N -1, complete as specified, Lump without casting Sum 1 1.00 $32,000.00 321. Furnish and install MH N-4, complete as specified, Lump without casting Sum 1 1.00 $25,000.00 322. Furnish and install MH N -5, complete as specified, Lump without casting Sum 1 1.00 $25,000.00 Page 5 of 11 CONTRACT: 08 -01 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 323. Furnish and install MH N -6, complete as specified, Lump without casting Sum 1 1.00 $24,000.00 324. Furnish and install MH N -7, complete as specified, Lump without casting Sum 1 1.00 $25,000.00 325. Furnish and install std. sanitary manhole (4' inside diameter) at 18 locations, complete as specified, Vertical without castings Feet 210 178.24 -31.76 $225.00 ($7,146.00) 326. Furnish and install std. sanitary manhole (5' inside diameter) at 7 locations, complete as specified, Vertical without castings Feet 100 106.88 6.88 $400.00 $2,752.00 327. Furnish and install 4 "/6" sanitary sewer lateral, Linear complete as specified Feet 1,925 1,793.00 - 132.00 $30.00 ($3,960.00) 328. Furnish and install cut in wyes or "Insert-a- Tees" on existing sanitary sewer, complete as specified Each 16 14.00 -2.00 $500.00 ($1,000.00) 329. Furnish and install 24" X 6" factory wyes, complete as specified Each 24 23.00 -1.00 $2,000.00 ($2,000.00) 330. Furnish and install 15" X 6" factory wyes, complete as specified Each 25 22.00 -3.00 $750.00 ($2,250.00) 331. Furnish and install connections of new sanitary sewer to existing main (Various sizes and locations), complete as specified Each 21 21.00 $3,000.00 332. Abandon existing sanitary sewer as shown on plans (Various sizes and locations), complete as Lump specified Sum 1 1.00 $15,000.00 333. Furnish and install sanitary sewer marker balls, complete as specified Each 150 127.00 -23.00 $50.00 ($1,150.00) 334. Furnish and install rock excavation, complete as Cubic specified Yards 200 200.00 $100.00 335. Core drill 4" sanitary lateral in to MH H -5, connect with a Kore "N" Seal connection, complete as specified Each 1 1.00 $5,000.00 SECTION III - (BID ITEMS 300 - 335) - SUB - TOTALS $80,036.95 ($65,964.95) ADDITIONAL WORK REQUIRED: C.O. # 3 - SECTION III Page 6 of 11 CONTRACT: 08-01 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 349 Furnish and install 8" sanitary sewer drops, complete as specified Each 15.36 15.66 0.30 $350.00 $105.00 350 Furnish and install 10" sanitary sewer drops, complete as specified Each 5.06 9.60 4.54 $415.00 $1,884.10 351 Furnish and install 12" sanitary sewer drops, complete as specified Each 28.66 29.35 0.69 $475.00 $327.75 352 Furnish and install 21" sanitary sewer drops, complete as specified Each 3.58 3.89 0.31 $1,000.00 $310.00 ADDITIONAL WORK: C. O. # 3 - (ITEMS 349 352) - SUB -TOTAL $2,626.85 $0.00 NET INCREASE TO: SECTION III $16,698.85 SECTION IV - WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 400. Furnish and install 6" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 110 367.00 257.00 $30.00 $7,710.00 401. Furnish and install 8" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 300 314.00 14.00 $40.00 $560.00 402. Furnish and install 10" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 1,300 1,326.00 26.00 $50.00 $1,300.00 403. Fumish and install 1" water service relay, complete as specified, not including corporation and stop box Linear Feet 675 1,644.50 969.50 $35.00 $33,932.50 404. Furnish and install 1 Y" water service, complete as specified, not including corporation and stop box Linear Feet 60 0.00 -60.00 $40.00 ($2,400.00) 405. Furnish and install 2" water service, complete as specified not including Linear corporation or stop box Feet 60 0.00 -60.00 $45.00 ($2,700.00) Page 7 of 11 CONTRACT: 08-01 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 406. Furnish and install 1" corporation and stop box with rod, complete as specified Each 50 60.00 10.00 $400.00 $4,000.00 407. Furnish and install 1 '/2" corporation and stop box with rod, complete as specified Each 2 0.00 -2.00 $700.00 ($1,400.00) 408. Furnish and install 2" corporation and stop box with rod, complete as specified Each 2 0.00 -2.00 $1,000.00 ($2,000.00) 409. Furnish and install 6" gate valve with box, complete as specified Each 6 7.00 1.00 $1,300.00 $1,300.00 410. Furnish and install 8" gate valve with box, complete as specified Each 7 8.00 1.00 $1,600.00 $1,600.00 411. Furnish and install 10" gate valve with box, complete as specified Each 10 8.00 -2.00 $2,000.00 ($4,000.00) 412. Furnish and install 10" x 10" x4" tee, complete as specified Each 1 0.00 -1.00 $500.00 ($500.00) 413. Furnish and install 10" x 10" x 6" tee, complete as specified Each 5 7.00 2.00 $500.00 $1,000.00 414. Furnish and install 10" x 10" x 8" tee, complete as specified Each 4 6.00 2.00 $500.00 $1,000.00 415. Furnish and install 8" x8" x 6" tee, complete as specified Each 5 1.00 -4.00 $400.00 ($1,600.00) 416. Furnish and install 10" x 8" cross, complete as specified Each 2 2.00 $650.00 417. Furnish and install 10" x 8" x 6" cross, complete as specified Each 1 0.00 -1.00 $800.00 ($800.00) 418. Furnish and install 6" - 45 degree bends, complete as specified Each 8 24.00 16.00 $250.00 $4,000.00 419. Furnish and install 8" - 45 degree bends, complete as specified Each 8 17.00 9.00 $350.00 $3,150.00 420. Furnish and install 10" - 45 degree bends, complete as specified Each 2 0.00 -2.00 $400.00 ($800.00) 421. Furnish and install hydrants, complete as specified Each 6 5.00 -1.00 $3,000.00 ($3,000.00) 422. Furnish and install 8" x 6" reducer, complete as specified Each 1 6.00 5.00 $300.00 $1,500.00 423. Furnish and install 8" cap, complete as specified Each 1 1.00 $250.00 424. Furnish and install 10" cap, complete as specified Each 1 2.00 1.00 $300.00 $300.00 Page 8 of 11 CONTRACT: 08 -01 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 425. Fumish and install 4" ductile iron water main w /poly wrap, complete as specified, not including Linear fittings Feet 5 4.00 -1.00 $35.00 ($35.00) 426. Furnish and install connections of new water main to existing water main (various sizes and locations), complete as specified Each 11 13.00 2.00 $1,000.00 $2,000.00 427. Furnish and install 2" insulation, complete as Square specified Feet 800 0.00 - 800.00 $3.00 ($2,400.00) 428. Abandon water main on New York Avenue (Canadian National railroad tracks to Jefferson Street), complete as specified Lump Sum 1 1.00 $9,000.00 SECTION IV - (BID ITEMS 400 - 428) - SUB - TOTALS $63,352.50 ($21,635.00) ADDITIONAL WORK REQUIRED: C.O. # 3 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 432 Furnish and install 6" - 22 1/2 degree bend, complete as specified Each 2.00 3.00 1.00 $250.00 $250.00 ADDITIONAL WORK: C.O. # 3 (ITEMS 432) - SUB -TOTAL $250.00 $0.00 NET INCREASE TO: SECTION IV $41,967.50 SECTION V - WORK UNIT B - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 501 Furnish and install 10" Storm Sewer, complete as Linear specified Feet 7 12.50 5.50 $24.00 $132.00 502 Furnish and install 12" Storm Sewer, complete as Linear specified Feet 527 527.60 0.60 $25.00 $15.00 503 Furnish and install 15" Storm Sewer, complete as Linear specified Feet 113 156.70 43.70 $27.00 $1,179.90 504 Furnish and install 30" RCP Class III Storm Sewer, complete as specified Linear Feet 309 318.71 9.71 $46.00 $446.66 Page 9 of 11 CONTRACT: 08 -01 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 505 Furnish and install 14" x23" HERCP Class HE -III Storm Sewer, complete as Linear specified Feet 10 0.00 -10.00 $50.00 ($500.00) 506 Furnish and install 19" x30" HERCP Class HE -III Storm Sewer, complete as Linear specified Feet 10 0.00 -10.00 $60.00 ($600.00) 507 Furnish and install 24" x38" HERCP Class HE -III Storm Sewer, complete as Linear specified Feet 32 27.10 -4.90 $70.00 ($343.00) 508 Furnish and install 29" x45" HERCP Class HE -III Storm Sewer, complete as Linear specified Feet 62.5 31.13 -31.37 $100.00 ($3,137.00) 509 Furnish and install 38" x 60" HERCP Class HE -III Storm Sewer, complete as Linear specified Feet 320 320.50 0.50 $130.00 $65.00 510 Furnish and install 48" x 76" HERCP Class HE -III Storm Sewer, complete as specified, per linear foot Linear Feet 532 524.63 -7.37 $180.00 ($1,326.60) 511 Furnish and install std. Storm Manhole (4' Inside Diameter) in two (2) locations, without casting, complete as specified Vertical Feet 10.34 10.05 -0.29 $600.00 ($174.00) 512 Furnish and install std. Storm Manhole (5' Inside Diameter) in three (3) locations, without casting, complete as specified Vertical Feet 17.47 17.17 -0.30 $700.00 ($210.00) 513 Furnish and install std. Storm Manhole (6' Inside Diameter) in three (3) locations, without casting, complete as specified Vertical Feet 16.39 16.02 -0.37 $800.00 ($296.00) 514 Furnish and install Std. Inlet (Type 3 with 18" sump) with castings, complete as specified Each 24 24.00 $1,200.00 515 Furnish and install materials to construct Junction Chamber No.7, without casting, complete Lump as specified Sum 1 1.00 $30,000.00 516 Furnish and install materials to construct Junction Chamber No. 5, without casting, complete Lump as specified Sum 1 1.00 $30,000.00 Page 10 of 11 CONTRACT: 08 -01 CHANGE ORDER # 3 CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 517 Furnish and install materials to construct Junction Chamber No.2, without casting, complete Lump as specified Sum 1 1.00 $30,000.00 518 Furnish and install materials to construct Junction Chamber No.1, without casting, complete Lump as specified Sum 1 1.00 $38,000.00 519 Furnish and install 6" Storm Lateral, complete as Linear specified Feet 830 914.00 84.00 $30.00 $2,520.00 520 Furnish and install storm lateral marker balls, complete as specified Each 61 61.00 $50.00 521 Abandon 8" - 12" Storm Sewer, completed as Linear specified Feet 334 369.00 35.00 $10.00 $350.00 522 Abandon 15" Storm Sewer and larger, completed as Linear specified Feet 215 300.00 85.00 $15.00 $1,275.00 523 Abandon existing catch basins and manholes, complete as specified Each 10 63.00 53.00 $500.00 $26,500.00 SECTION V - (BID ITEMS 500 - 523) - SUB - TOTALS $32,483.56 ($6,586.60) NET INCREASE TO: SECTION V $25,896.96 NET INCREASE TO SECTIONS 1, 11, 111, IV, V $268,128.46 NET DECREASE TO SECTIONS I, 11, 111, IV, V ($249,729.03) NET DECREASE TO CONTRACT: $18,399.43 Page 11 of 11 City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 IP) OJHKOIH ON THE WATER August 11, 2010 Mr. Mark Hinsz S.J. Louis Construction, Inc. 1351 W. Broadway Street P.O. Box 459 Rockville, MN 56369 Re: Change Order #3 /Contract 08 -01 Dear Mr. Hinsz: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and S.J. Louis Construction, Inc. regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, ,aj(, C . /4.d / David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original)