Loading...
HomeMy WebLinkAboutPW CNT 09-07/CNG 1 City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 OJHKOJH ON THE WATER June 11, 2010 Mr. Bill Bowers JUN 1 1 2010 Carl Bowers Construction Co., Inc. N1844 Maloney Road CITY CLERK'S OFFICE Kaukauna, WI 54130 Re: Change Order #1, Contract 09 -07 Dear Mr. Bowers: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Carl Bowers Construction Co., Inc. regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, A C -191- e, /ctryv David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original) CHANGE ORDER # 1 DATED: May 27, 2010 TO: Carl Bowers & Sons Construction Co N1844 Maloney Rd. Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No. 09 -07 , is hereby amended and changed as follows: NET DECREASE TO: SECTION I - CONCRETE PAVING ($78,935.97) NET INCREASE TO: SECTION II - STORM SEWER $14,120.46 NET INCREASE TO: SECTION III - SANITARY SEWER $22,128.16 NET DECREASE TO: SECTION IV - WATER MAIN ($2,384.00) NET DECREASE TO CONTRACT: ($45,071.35) JUN 1 1 2010 CITY OF OSHKOSH Recommended: CITY CLERK'S City Manager i/Crei G .—Pot_eJe_ I kill • . Director of Public Works b° y e k Ap proved an • accepted: •Pd P)'' Contractor certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. / s i_ 1_,), k _ ) C mptroller Appr d as to form: .� _QO f - City Attorney CONTRACT: 09 -07 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 100 Pavement removal, Square complete as specified Yards 6,785 6290.30 - 494.70 $2.00 ($989.40) 101 Sidewalk and driveway removal, complete as Square specified Feet 42,255 45285.60 3,030.60 $0.65 $1,969.89 102 Excavation, complete as Cubic specified Yards 9,530 9012.90 - 517.10 $8.25 ($4,266.08) 103 7" non - reinforced concrete pavement, including integral curb, 5" base material and grading, Square complete as specified Yards 13,195 13189.30 -5.70 $30.30 ($172.71) 104 8" doweled concrete pavement, including integral curb and grading (base in place), complete Square as specified Yards 2,885 1974.60 - 910.40 $30.00 ($27,312.00) 105 8" non - reinforced concrete pavement, including integral curb and grading, base in place, complete as Square specified Yards 6,245 6253.10 8.10 $29.50 $238.95 106 8" non - reinforced concrete pavement, including integral curb, 6" base material and grading, Square complete as specified Yards 3,500 3507.80 7.80 $32.50 $253.50 107 8" non - reinforced H.E.S. concrete pavement, including integral curb, 6" base material and grading, Square complete as specified Yards 420 430.90 10.90 $38.50 $419.65 108 12" wide radius curb head, Linear complete as specified Feet 1,440 1364.50 -75.50 $6.50 ($490.75) 109 Standard 24" curb & gutter, 7" (tie -in), complete as Linear specified Feet 55 102.80 47.80 $19.00 $908.20 110 Standard 30" curb & gutter, 7" (tie -in), complete as Linear specified Feet 605 682.90 77.90 $19.00 $1,480.10 111 Sidewalk curb, complete Linear as specified Feet 450 62.80 - 387.20 $18.00 ($6,969.60) 112 4" concrete sidewalk, Square complete as specified Feet 21,455 28922.50 7,467.50 $2.81 $20,983.68 113 6" concrete sidewalk & driveway, complete as Square specified Feet 24,950 21311.80 - 3,638.20 $3.00 ($10,914.60) 114 8" concrete sidewalk & driveway, complete as Square specified Feet 2,895 2180.20 - 714.80 $3.42 ($2,444.62) Page 1 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 115 6" concrete steps, Square complete as specified Feet 95 32.30 -62.70 $32.00 ($2,006.40) 116 3 1/2" asphaltic concrete driveway, complete as Square specified Feet 175 1367.80 1,192.80 $5.00 $5,964.00 117 3 %" asphaltic concrete transition, with base, Square complete as specified Yards 1,255 1253.80 -1.20 $22.00 ($26.40) 118 5" asphaltic concrete transition, with base, Square complete as specified Yards 745 747.10 2.10 $25.00 $52.50 119 Furnish and install crushed stone base course, complete as specified Tons 3,640 180.00 - 3,460.00 $7.00 ($24,220.00) 120 Sawing, complete as Linear specified Feet 2,345 2749.50 404.50 $2.00 $809.00 121 Furnish and install pavement ties (epoxy coated), complete as specified Each 385 427.00 42.00 $7.00 $294.00 122 Adjust manholes and inlets, complete as specified Each 228 239.00 11.00 $225.00 $2,475.00 123 Furnish and install No. 4 reinforcing bars (epoxy coated), complete as Linear specified Feet 2,160 1480.50 - 679.50 $1.05 ($713.48) 124 Remove trees and stumps, complete as specified Inch Diameter 400 317.00 -83.00 $10.00 ($830.00) 125 Remove stumps, complete Inch as specified Diameter 40 67.00 27.00 $10.00 $270.00 126 Furnish and install trees, complete as specified Each 10 0.00 -10.00 $250.00 ($2,500.00) 127 Provide and install metal detectable warning plates, Square complete as specified Feet 736 692.00 -44.00 $28.30 ($1,245.20) 128 Terrace work on Babbitz Avenue (including storm sewer outfall restoration to Lake Winnebago), Lump complete as specified Sum 1 1.00 $8,000.00 129 Terrace work on Fernau Court, complete as Lump specified Sum 1 1.00 $9,000.00 Terrace work on Gehres Court, complete as Lump 130 specified Sum 1 1.00 $2,100.00 131 Terrace work on Grand Street, complete as Lump specified Sum 1 1.00 $5,500.00 132 Terrace work on Lane Street, complete as Lump specified Sum 1 1.00 $2,100.00 Page 2 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 133 Terrace work on Mt. Vernon Street, complete as Lump specified Sum 1 1.00 $10,000.00 134 Terrace work on E. New York Avenue (Jefferson St. to Broad St.), complete as Lump specified Sum 1 1.00 $10,000.00 135 Terrace work on E. Parkway Avenue (includes storm sewer restoration through park), complete as Lump specified Sum 1 1.00 $10,000.00 136 Terrace work on Lawndale Street storm sewer, Lump complete as specified Sum 1 1.00 $1,350.00 137 Terrace work on E. New York Avenue storm sewer, Lump complete as specified Sum 1 1.00 $4,000.00 138 Restoration for storm sewer easement from Doemel Street to channel east of White Swan Drive, Lump complete as specified Sum 1 1.00 $5,500.00 139 Furnish and install cold weather covering, 1 -layer visquine, complete as Square specified Yards 4,650 0.00 - 4,650.00 $2.00 ($9,300.00) 140 Furnish and install cold weather covering, 2 -layer visquine, complete as Square specified Yards 4,650 0.00 - 4,650.00 $3.00 ($13,950.00) 141 Furnish and install cold weather covering, 2 -layer visquine and 6" hay, Square complete as specified Yards 4,650 0.00 - 4,650.00 $4.00 ($18,600.00) 142 2" Asphaltic concrete transition with base, Square complete as specified Yards 905 1292.60 387.60 $18.00 $6,976.80 SECTION I - (BID ITEMS 100 - 142) - SUB - TOTALS $43,095.27 ($126,951.24) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 143 EXTRA - CUT INLET TO SUBGRADE, INVOICE Lump #9367 Sum 1.00 1.00 $127.50 $127.50 144 EXTRA - SEPARATE CURB & GUTTER ON Linear BABBITZ Foot 658.00 658.00 $3.75 $2,467.50 145 EXTRA - PROFILE Linear SAWING ON PARKWAY Foot 13.00 13.00 $50.00 $650.00 Page 3 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 146 EXTRA - RELOCATE EXISTING INLET @ SE CORNER OF GRAND & Lump NEVADA Sum 1.00 1.00 $1,675.00 $1,675.00 ADDITIONAL WORK: C.O. # 1 - (ITEMS 143 - 146) - SUB -TOTAL $4,920.00 $0.00 NET DECREASE TO: SECTION I ($78,935.97) SECTION 11 - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 200 Furnish and install 12" storm sewer, complete as Linear specified Feet 1,300 1,402.92 102.92 $39.50 $4,065.34 201 Furnish and install 12" RCP Class III storm sewer, complete as specified Linear Feet 65 66.00 1.00 $41.50 $41.50 202 Furnish and install 15" storm sewer, complete as Linear specified Feet 982 977.69 -4.31 $42.00 ($181.02) 203 Furnish and install 15" RCP Class III storm sewer, complete as specified Linear Feet 395 396.20 1.20 $44.00 $52.80 204 Furnish and install 18" storm sewer, complete as Linear specified Feet 693 737.84 44.84 $45.00 $2,017.80 205 Furnish and install 18" RCP Class HI storm sewer with joint ties and clay bedding and backfill, Linear complete as specified Feet 71 71.99 0.99 $46.00 $45.54 206 Furnish and install 21" storm sewer, complete as Linear specified Feet 36 36.80 0.80 $49.00 $39.20 207 Furnish and install 21" RCP Class III storm sewer, complete as specified Linear Feet 168 167.30 -0.70 $49.00 ($34.30) 208 Furnish and install 21" RCP Class III storm sewer with joint ties and clay bedding and backfill, Linear complete as specified Feet 49 51.70 2.70 $49.00 $132.30 209 Furnish and install 24" storm sewer, complete as Linear specified Feet 291 286.30 -4.70 $50.00 ($235.00) Page 4 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 210 Furnish and install 24" x 38" RCP Class III storm sewer, complete as Linear specified Feet 668 649.50 -18.50 $85.00 ($1,572.50) 211 Furnish and install 29" x 45" RCP Class 111 storm sewer, complete as Linear specified Feet 894 871.30 -22.70 $100.00 ($2,270.00) 212 Furnish and install 34" x 53" RCP Class 111 storm sewer, complete as Linear specified Feet 452 435.00 -17.00 $107.00 ($1,819.00) 213 Furnish and install 34" x 53" RCP Class 111 storm sewer with joint ties and clay bedding and backfill, Linear complete as specified Feet 107 104.70 -2.30 $107.00 ($246.10) 214 Furnish and install 38" x 60" RCP Class III storm sewer, complete as Linear specified Feet 325 304.70 -20.30 $144.00 ($2,923.20) 215 Furnish and install 43" x 68" RCP Class 111 storm sewer, complete as Linear specified Feet 1,532 1,585.20 53.20 $163.00 $8,671.60 216 Furnish and install 43" x 68" RCP Class III storm sewer with joint ties and clay bedding and backfill, Linear complete as specified Feet 42 42.00 $163.00 217 Furnish and install 18" RCP Class III apron endwall with joint ties, complete as specified Each 1 1.00 $1,000.00 218 Furnish and install 21" RCP Class III apron endwall with joint ties, complete as specified Each 1 1.00 $1,050.00 219 Furnish and install 34" x 53" RCP Class III apron endwall with joint ties, complete as specified Each 1 1.00 $2,000.00 220 Furnish and install 43" x 68" RCP Class III apron endwall with joint ties, complete as specified Each 1 1.00 $3,000.00 221 Furnish and install std. inlets (Type 1 with 18" sump) with castings, complete as specified Each 2 2.00 $1,100.00 222 Furnish and install std. inlets (Type 1 with no sump) with castings, complete as specified Each 2 2.00 $1,100.00 Page 5of13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 223 Furnish and install std. inlets (Type 3 with 18" sump) with castings, complete as specified Each 85 89.00 4.00 $1,150.00 $4,600.00 224 Fumish and install std. storm manhole (4' inside diameter) in 25 locations without casting, complete Vertical as specified Feet 104.1 102.53 -1.57 $300.00 ($471.00) 225 Furnish and install std. storm manhole (5' inside diameter) in 3 locations without casting, complete Vertical as specified Feet 11.16 11.14 -0.02 $400.00 ($8.00) 226 Furnish and install std. storm manhole (6' inside diameter) in 7 locations without casting, complete Vertical as specified Feet 34.1 33.03 -1.07 $500.00 ($535.00) 227 Fumish and install std. storm manhole (7' x 7') in 15 locations without casting, complete as Vertical specified Feet 92.47 92.85 0.38 $900.00 $342.00 228 Furnish and install std. storm inlet manhole (4' inside diameter) in 1 (one) location with casting, complete as specified Vertical Feet 3.95 3.79 -0.16 $350.00 ($56.00) 229 Furnish and install std. storm inlet manhole (5' inside diameter) in 1 (one) location with casting, complete as specified Vertical Feet 3.38 3.29 -0.09 $500.00 ($45.00) 230 Furnish and install std. storm inlet manhole (6' inside diameter) in 7 locations with casting, Vertical complete as specified Feet 34.18 33.16 -1.02 $575.00 ($586.50) 231 Furnish and install 6" storm lateral, complete as Linear specified Feet 2,056 1,988.00 -68.00 $27.00 ($1,836.00) 232 Furnish and install storm lateral marker balls, complete as specified Each 175 167.00 -8.00 $18.00 ($144.00) 233 Abandon lineal feet of 8" - 12" storm sewer, complete Linear as specified Feet 1,396 1,396.00 $10.00 234 Abandon lineal feet of 15" and larger storm sewer, Linear complete as specified Feet 769 769.00 $10.00 Page 6 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 235 Abandon inlets or manholes, complete as specified Each 36 36.00 $250.00 236 Furnish, install, and maintain Type "D" inlet protection std., complete as specified Each 159 159.00 $90.00 237 Furnish, install, and maintain silt fence, Linear complete as specified Feet 278 278.00 $3.00 238 Furnish, install, and maintain stone bags, complete as specified Each 34 34.00 $5.00 239 Clear inch - diameter of existing trees, complete as Inch specified Diameter 225 225.00 $2.00 240 Grub inch - diameter of existing stumps, complete Inch as specified Diameter 225 225.00 $2.00 SECTION II - (BID ITEMS 200 - 240) - SUB - TOTALS $20,008.08 ($12,962.62) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION II ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 241 EXTRA PER INVOICE Lump #0002046 -IN Sum 1.00 1.00 $900.00 $900.00 242 EXTRA PER INVOICE Lump #0002072 -IN Sum 1.00 1.00 $550.00 $550.00 243 EXTRA PER INVOICE Lump #0002074 -IN Sum 1.00 1.00 $300.00 $300.00 244 EXTRA PER INVOICE Lump #0002075 -IN Sum 1.00 1.00 $4,650.00 $4,650.00 245 EXTRA PER INVOICE Lump #0002076 -IN Sum 1.00 1.00 $675.00 $675.00 ADDITIONAL WORK: C.O. # 1 - (ITEMS 241 - 245) - SUB -TOTAL $7,075.00 $0.00 NET INCREASE TO: SECTION II $14,120.46 SECTION III - SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 300 Furnish and install 8" sanitary sewer (relay), Linear complete as specified Feet 3,115 3094.68 -20.32 $57.00 ($1,158.24) Page 7 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 301 Furnish and install 8" sanitary sewer drop, Vertical complete as specified Feet 15 15.83 0.83 $450.00 $373.50 302 Furnish and install 10" sanitary sewer (relay), Linear complete as specified Feet 145 139.80 -5.20 $77.00 ($400.40) 303 Furnish and install 10" sanitary sewer drop, Vertical complete as specified Feet 5 4.54 -0.46 $500.00 ($230.00) 304 Furnish and install 12" sanitary sewer (relay), Linear complete as specified Feet 1,485 1529.40 44.40 $83.00 $3,685.20 305 Furnish and install 12" sanitary sewer drop, Vertical complete as specified Feet 15 11.72 -3.28 $550.00 ($1,804.00) 306 Furnish and install 15" sanitary sewer relay, Vertical complete as specified Feet 5 7.90 2.90 $130.00 $377.00 307 Furnish and install std. sanitary manhole (4' inside diameter) in various locations, complete as Vertical specified, without casing Feet 210 222.30 12.30 $185.00 $2,275.50 308 Furnish and install 8" x 4" factory wyes or tees, complete as specified Each 3 0.00 -3.00 $70.00 ($210.00) 309 Furnish and install 8" x 6" factory wyes or tees, complete as specified Each 79 62.00 -17.00 $90.00 ($1,530.00) 310 Furnish and install 10" x 6" factory wyes or tees, complete as specified Each 1 1.00 $150.00 311 Furnish and install 12" x 6" factory wyes or tees, complete as specified Each 4 23.00 19.00 $190.00 $3,610.00 312 Furnish and install new 4" sanitary laterals, complete Linear as specified Feet 50 0.00 -50.00 $46.00 ($2,300.00) 313 Furnish and install 4 " /6" sanitary lateral relay, Linear complete as specified Feet 1,630 1776.10 146.10 $46.00 $6,720.60 314 Furnish and install sanitary lateral marker balls, complete as specified Each 174 169.00 -5.00 $18.00 ($90.00) 315 Furnish and install connections of new sanitary main to existing main (various locations and sizes), complete as specified Each 14 14.00 $300.00 316 Core into existing sanitary manhole, complete as specified Each 1 1.00 $600.00 Page 8 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 317 Abandon sanitary manholes, complete as specified Each 21 21.00 $400.00 318 Abandon 8" sanitary sewer at various locations, complete as specified Linear Feet 1,890 1890.00 $3.00 319 Abandon 10" sanitary sewer at various locations Linear complete as specified Feet 430 430.00 $3.00 320 Abandon 15" sanitary sewer at various locations, Linear complete as specified Feet 350 350.00 $12.00 321 Abandon 18" sanitary sewer at various locations, Linear complete as specified Feet 955 955.00 $15.00 322 Abandon 24" sanitary sewer at various locations, Linear complete as specified Feet 430 430.00 $17.00 SECTION III - (BID ITEMS 300 - 322) - SUB - TOTALS $17,041.80 ($7,722.64) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 323 EXTRA PER INVOICE Lump #0002071 -IN Sum 1.00 1.00 $5,534.00 $5,534.00 324 EXTRA PER INVOICE Lump #0002077 -IN Sum 1.00 1.00 $4,595.00 $4,595.00 325 EXTRA - MOVE & REPLACE SAN. MH BASE Lump Sum 1.00 1.00 $2,680.00 $2,680.00 ADDITIONAL WORK: C. O. # 1 - (ITEMS 323 - 325) - SUB -TOTAL $12,809.00 $0.00 NET INCREASE TO: SECTION III $22,128.16 SECTION IV - WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 400. Furnish and install 4" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 20 43.00 23.00 $51.00 $1,173.00 Page 9 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 401. Furnish and install 6" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 455 390.00 -65.00 $52.00 ($3,380.00) 402. Furnish and install 8" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 3,300 3,201.00 -99.00 $52.00 ($5,148.00) 403. Furnish and install 10" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 20 0.00 -20.00 $62.00 ($1,240.00) 404. Furnish and install 12" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 660 692.00 32.00 $68.00 $2,176.00 405. Furnish and install 18" ductile iron water main, w /poly wrap, complete as specified (fittings not Linear included) Feet 695 723.00 28.00 $106.00 $2,968.00 406. Furnish and install 1" water service relay, complete as specified, not including corporation and stop box Linear Feet 1,505 1,556.00 51.00 $42.00 $2,142.00 407. Furnish and install new 1" water service, complete as specified, not including Linear corporation and stop box Feet 110 0.00 - 110.00 $42.00 ($4,620.00) 408. Furnish and install 1" corporation and stop box with rod, complete as specified Each 83 81.00 -2.00 $220.00 ($440.00) 409. Furnish and install 8" x 6" tees, complete as specified Each 12 8.00 -4.00 $230.00 ($920.00) 410. Furnish and install 8" x 8" tees, complete as specified Each 8 8.00 $240.00 411. Furnish and install 18" x 8" tee, complete as specified Each 2 1.00 -1.00 $1,200.00 ($1,200.00) 412. Furnish and install 6" x 6" cut -in tee, complete as specified Each 2 0.00 -2.00 $1,500.00 ($3,000.00) 413. Furnish and install 8" x 8" cross, complete as specified Each 3 0.00 -3.00 $250.00 ($750.00) Page 10 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 414. Furnish and install 12" X 8" cross, complete as specified Each 1 3.00 2.00 $330.00 $660.00 415. Furnish and install 6" valves, complete as specified Each 14 16.00 2.00 $1,000.00 $2,000.00 416. Furnish and install 6" cut -in valve, complete as specified Each 2 0.00 -2.00 $1,100.00 ($2,200.00) 417. Furnish and install 8" valves, complete as specified Each 26 23.00 -3.00 $1,250.00 ($3,750.00) 418. Furnish and install 12" valves, complete as specified Each 2 3.00 1.00 $2,500.00 $2,500.00 419. Furnish and install 18" valve, complete as specified Each 1 1.00 $9,800.00 420. Furnish and install 6" x 6" tapping valve and sleeve, complete as specified Each 3 3.00 $2,100.00 421. Furnish and install 12" x 8" tapping valve and sleeve, complete as specified Each 1 1.00 $2,500.00 422. Furnish and install 8" - 22 'A degree bends, complete as specified Each 1 0.00 -1.00 $210.00 ($210.00) 423. Furnish and install 4" - 45 degree bends, complete as specified Each 4 6.00 2.00 $150.00 $300.00 424. Furnish and install 6" - 45 degree bends, complete as specified Each 34 42.00 8.00 $160.00 $1,280.00 425. Furnish and install 8" - 45 degree bends, complete as specified Each 11 11.00 $210.00 426. Furnish and install 12" - 45 degree bends, complete as specified Each 2 3.00 1.00 $350.00 $350.00 427. Furnish and install 18" - 45 degree bends, complete as specified Each 4 4.00 $1,250.00 428. Furnish and install 8" x 4" reducer, complete as specified Each 2 3.00 1.00 $160.00 $160.00 429. Furnish and install 8" x 6" reducers, complete as specified Each 15 15.00 $170.00 430. Relocate hydrant, complete as specified Each 2 0.00 -2.00 $700.00 ($1,400.00) 431. Furnish and install hydrants, complete as _specified Each 14 14.00 _ $2,400.00 Page 11 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 432. Furnish and install gradeloks for hydrant branches, complete as specified Each 6 0.00 -6.00 $350.00 ($2,100.00) 433. Furnish and install connections of new water main to existing water main (various sizes and locations), complete as specified Each 30 23.00 -7.00 $1,000.00 ($7,000.00) 434. Furnish and install 4" cap, complete as specified Each 1 0.00 -1.00 $900.00 ($900.00) 435. Furnish and install 6" cap, complete as specified Each 1 0.00 -1.00 $900.00 ($900.00) 436. Furnish and install 8" cap, complete as specified Each 1 0.00 -1.00 $900.00 ($900.00) 437. Cut and cap existing 12" water main, complete as specified Each 1 0.00 -1.00 $1,100.00 ($1,100.00) 438. Furnish and install 18" cap, complete as specified Each 1 1.00 $2,000.00 439. Abandon water main on Babbitz Avenue (Lane St. to Sweet St.) complete as Lump specified Sum 1 1.00 $1,400.00 440. Abandon water main on Gehres Court (Broad St. to a point east), complete as Lump specified Sum 1 1.00 $1,000.00 441. Abandon water main on Grand Avenue (New York Ave. to E. Nevada St.), Lump complete as specified Sum 1 1.00 $2,000.00 442. Abandon water main on Lane Street (Rahr Ave. to Babbitz Ave.), complete as Lump specified Sum 1 1.00 $600.00 443. Abandon water main on Mt. Vernon Street (New York Ave. to Custer Ave.), Lump complete as specified Sum 1 1.00 $2,200.00 444. Abandon water main on E. Parkway Avenue (Bowen St. to Hazel St.), complete Lump as specified Sum 1 1.00 $4,800.00 445. Furnish and install 4" sleeve, complete as specified Each 2 3.00 1.00 $110.00 $110.00 446. Furnish and install 6" sleeve, complete as specified Each 2 7.00 5.00 $140.00 $700.00 Page 12 of 13 CONTRACT: 09 -07 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 447. Furnish and install 8" sleeve, complete as specified Each 2 2.00 $180.00 448. Furnish and install 12" sleeve, complete as specified Each 2 1.00 -1.00 $235.00 ($235.00) SECTION IV - (BID ITEMS 400 - 448) - SUB - TOTALS $16,519.00 ($41,393.00) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 449 RECONNECT WATER SERVICE Each 3.00 3.00 $825.00 $2,475.00 450 BOX & ROD ONLY Each 13.00 13.00 $800.00 $10,400.00 451 ULO'S Each 2.00 2.00 $750.00 $1,500.00 452 4" TEE Each 1.00 1.00 $265.00 $265.00 453 18" SLEEVE Each 1.00 1.00 $1,225.00 $1,225.00 454 12" X 6" ANCHORING TEE Each 1.00 1.00 $475.00 $475.00 455 6" X 6" TEE Each 3.00 3.00 $275.00 $825.00 456 12" X 18" TEE Each 1.00 1.00 $2,485.00 $2,485.00 457 EXTRA PER INVOICE Lump #0002042 -IN Sum 1.00 1.00 $1,560.00 $1,560.00 458 EXTRA PER INVOICE Lump #0002073 -IN Sum 1.00 1.00 $1,280.00 $1,280.00 ADDITIONAL WORK: C.O. # 1 (ITEMS 449 - 458) - SUB -TOTAL $22,490.00 $0.00 NET DECREASE TO: SECTION IV ($2,384.00) NET INCREASE TO SECTIONS I, 11, 111, IV $143,958.15 NET DECREASE TO SECTIONS I, II, III, IV ($189,029.50) NET DECREASE TO CONTRACT: ($45,071.35) Page 13 of 13