HomeMy WebLinkAboutPW CNT 09-07/CNG 1 City of Oshkosh
Department of Public Works
215 Church Avenue
P.O. Box 1130
Oshkosh, Wisconsin
54903 -1130
(920) 236 -5065
OJHKOJH
ON THE WATER
June 11, 2010
Mr. Bill Bowers JUN 1 1 2010
Carl Bowers Construction Co., Inc.
N1844 Maloney Road CITY CLERK'S OFFICE
Kaukauna, WI 54130
Re: Change Order #1, Contract 09 -07
Dear Mr. Bowers:
Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Carl
Bowers Construction Co., Inc. regarding the above - mentioned project.
If you have any questions, please call our office at (920) 236 -5065. Thank you.
Sincerely,
A C -191- e, /ctryv
David C. Patek
Director of Public Works
DCP /clm
Enclosure
cc: Pam Ubrig, City Clerk (w /original)
Lynn Lorenson, City Attorney (w /copy)
File Copy (w /original)
CHANGE ORDER # 1
DATED: May 27, 2010
TO: Carl Bowers & Sons Construction Co
N1844 Maloney Rd.
Kaukauna, WI 54130
Your present contract with the City of Oshkosh, Contract No. 09 -07 , is hereby amended
and changed as follows:
NET DECREASE TO: SECTION I - CONCRETE PAVING ($78,935.97)
NET INCREASE TO: SECTION II - STORM SEWER $14,120.46
NET INCREASE TO: SECTION III - SANITARY SEWER $22,128.16
NET DECREASE TO: SECTION IV - WATER MAIN ($2,384.00)
NET DECREASE TO CONTRACT: ($45,071.35)
JUN 1 1 2010 CITY OF OSHKOSH
Recommended: CITY CLERK'S City Manager
i/Crei G .—Pot_eJe_ I kill • .
Director of Public Works b° y e k
Ap proved an • accepted:
•Pd P)''
Contractor
certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
/ s i_ 1_,), k _ )
C mptroller
Appr d as to form:
.� _QO
f - City Attorney
CONTRACT: 09 -07 CHANGE ORDER # 1
SECTION I - CONCRETE PAVING
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
100 Pavement removal, Square
complete as specified Yards 6,785 6290.30 - 494.70 $2.00 ($989.40)
101 Sidewalk and driveway
removal, complete as Square
specified Feet 42,255 45285.60 3,030.60 $0.65 $1,969.89
102 Excavation, complete as Cubic
specified Yards 9,530 9012.90 - 517.10 $8.25 ($4,266.08)
103 7" non - reinforced concrete
pavement, including
integral curb, 5" base
material and grading, Square
complete as specified Yards 13,195 13189.30 -5.70 $30.30 ($172.71)
104 8" doweled concrete
pavement, including
integral curb and grading
(base in place), complete Square
as specified Yards 2,885 1974.60 - 910.40 $30.00 ($27,312.00)
105 8" non - reinforced concrete
pavement, including
integral curb and grading,
base in place, complete as Square
specified Yards 6,245 6253.10 8.10 $29.50 $238.95
106 8" non - reinforced concrete
pavement, including
integral curb, 6" base
material and grading, Square
complete as specified Yards 3,500 3507.80 7.80 $32.50 $253.50
107 8" non - reinforced H.E.S.
concrete pavement,
including integral curb, 6"
base material and grading, Square
complete as specified Yards 420 430.90 10.90 $38.50 $419.65
108 12" wide radius curb head, Linear
complete as specified Feet 1,440 1364.50 -75.50 $6.50 ($490.75)
109 Standard 24" curb & gutter,
7" (tie -in), complete as Linear
specified Feet 55 102.80 47.80 $19.00 $908.20
110 Standard 30" curb & gutter,
7" (tie -in), complete as Linear
specified Feet 605 682.90 77.90 $19.00 $1,480.10
111 Sidewalk curb, complete Linear
as specified Feet 450 62.80 - 387.20 $18.00 ($6,969.60)
112 4" concrete sidewalk, Square
complete as specified Feet 21,455 28922.50 7,467.50 $2.81 $20,983.68
113 6" concrete sidewalk &
driveway, complete as Square
specified Feet 24,950 21311.80 - 3,638.20 $3.00 ($10,914.60)
114 8" concrete sidewalk &
driveway, complete as Square
specified Feet 2,895 2180.20 - 714.80 $3.42 ($2,444.62)
Page 1 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER
DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
115 6" concrete steps, Square
complete as specified Feet 95 32.30 -62.70 $32.00 ($2,006.40)
116 3 1/2" asphaltic concrete
driveway, complete as Square
specified Feet 175 1367.80 1,192.80 $5.00 $5,964.00
117 3 %" asphaltic concrete
transition, with base, Square
complete as specified Yards 1,255 1253.80 -1.20 $22.00 ($26.40)
118 5" asphaltic concrete
transition, with base, Square
complete as specified Yards 745 747.10 2.10 $25.00 $52.50
119 Furnish and install crushed
stone base course,
complete as specified
Tons 3,640 180.00 - 3,460.00 $7.00 ($24,220.00)
120 Sawing, complete as Linear
specified Feet 2,345 2749.50 404.50 $2.00 $809.00
121 Furnish and install
pavement ties (epoxy
coated), complete as
specified Each 385 427.00 42.00 $7.00 $294.00
122 Adjust manholes and
inlets, complete as
specified Each 228 239.00 11.00 $225.00 $2,475.00
123 Furnish and install No. 4
reinforcing bars (epoxy
coated), complete as Linear
specified Feet 2,160 1480.50 - 679.50 $1.05 ($713.48)
124 Remove trees and stumps,
complete as specified Inch
Diameter 400 317.00 -83.00 $10.00 ($830.00)
125 Remove stumps, complete Inch
as specified Diameter 40 67.00 27.00 $10.00 $270.00
126 Furnish and install trees,
complete as specified Each 10 0.00 -10.00 $250.00 ($2,500.00)
127 Provide and install metal
detectable warning plates, Square
complete as specified Feet 736 692.00 -44.00 $28.30 ($1,245.20)
128 Terrace work on Babbitz
Avenue (including storm
sewer outfall restoration to
Lake Winnebago), Lump
complete as specified Sum 1 1.00 $8,000.00
129 Terrace work on Fernau
Court, complete as Lump
specified Sum 1 1.00 $9,000.00
Terrace work on Gehres
Court, complete as Lump
130 specified Sum 1 1.00 $2,100.00
131 Terrace work on Grand
Street, complete as Lump
specified Sum 1 1.00 $5,500.00
132 Terrace work on Lane
Street, complete as Lump
specified Sum 1 1.00 $2,100.00
Page 2 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
133 Terrace work on Mt.
Vernon Street, complete as Lump
specified Sum 1 1.00 $10,000.00
134 Terrace work on E. New
York Avenue (Jefferson St.
to Broad St.), complete as Lump
specified Sum 1 1.00 $10,000.00
135 Terrace work on E.
Parkway Avenue (includes
storm sewer restoration
through park), complete as Lump
specified Sum 1 1.00 $10,000.00
136 Terrace work on Lawndale
Street storm sewer, Lump
complete as specified Sum 1 1.00 $1,350.00
137 Terrace work on E. New
York Avenue storm sewer, Lump
complete as specified Sum 1 1.00 $4,000.00
138 Restoration for storm
sewer easement from
Doemel Street to channel
east of White Swan Drive, Lump
complete as specified Sum 1 1.00 $5,500.00
139 Furnish and install cold
weather covering, 1 -layer
visquine, complete as Square
specified Yards 4,650 0.00 - 4,650.00 $2.00 ($9,300.00)
140 Furnish and install cold
weather covering, 2 -layer
visquine, complete as Square
specified Yards 4,650 0.00 - 4,650.00 $3.00 ($13,950.00)
141 Furnish and install cold
weather covering, 2 -layer
visquine and 6" hay, Square
complete as specified Yards 4,650 0.00 - 4,650.00 $4.00 ($18,600.00)
142 2" Asphaltic concrete
transition with base, Square
complete as specified Yards 905 1292.60 387.60 $18.00 $6,976.80
SECTION I - (BID ITEMS 100 - 142) - SUB - TOTALS $43,095.27 ($126,951.24)
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
143 EXTRA - CUT INLET TO
SUBGRADE, INVOICE Lump
#9367 Sum 1.00 1.00 $127.50 $127.50
144 EXTRA - SEPARATE
CURB & GUTTER ON Linear
BABBITZ Foot 658.00 658.00 $3.75 $2,467.50
145 EXTRA - PROFILE Linear
SAWING ON PARKWAY Foot 13.00 13.00 $50.00 $650.00
Page 3 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
146 EXTRA - RELOCATE
EXISTING INLET @ SE
CORNER OF GRAND & Lump
NEVADA Sum 1.00 1.00 $1,675.00 $1,675.00
ADDITIONAL WORK: C.O. # 1 - (ITEMS 143 - 146) - SUB -TOTAL $4,920.00 $0.00
NET DECREASE TO: SECTION I ($78,935.97)
SECTION 11 - STORM SEWER
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
200 Furnish and install 12"
storm sewer, complete as Linear
specified Feet 1,300 1,402.92 102.92 $39.50 $4,065.34
201 Furnish and install 12"
RCP Class III storm sewer,
complete as specified Linear
Feet 65 66.00 1.00 $41.50 $41.50
202 Furnish and install 15"
storm sewer, complete as Linear
specified Feet 982 977.69 -4.31 $42.00 ($181.02)
203 Furnish and install 15"
RCP Class III storm sewer,
complete as specified Linear
Feet 395 396.20 1.20 $44.00 $52.80
204 Furnish and install 18"
storm sewer, complete as Linear
specified Feet 693 737.84 44.84 $45.00 $2,017.80
205 Furnish and install 18"
RCP Class HI storm sewer
with joint ties and clay
bedding and backfill, Linear
complete as specified Feet 71 71.99 0.99 $46.00 $45.54
206 Furnish and install 21"
storm sewer, complete as Linear
specified Feet 36 36.80 0.80 $49.00 $39.20
207 Furnish and install 21"
RCP Class III storm sewer,
complete as specified Linear
Feet 168 167.30 -0.70 $49.00 ($34.30)
208 Furnish and install 21"
RCP Class III storm sewer
with joint ties and clay
bedding and backfill, Linear
complete as specified Feet 49 51.70 2.70 $49.00 $132.30
209 Furnish and install 24"
storm sewer, complete as Linear
specified Feet 291 286.30 -4.70 $50.00 ($235.00)
Page 4 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
210 Furnish and install 24" x
38" RCP Class III storm
sewer, complete as Linear
specified Feet 668 649.50 -18.50 $85.00 ($1,572.50)
211 Furnish and install 29" x
45" RCP Class 111 storm
sewer, complete as Linear
specified Feet 894 871.30 -22.70 $100.00 ($2,270.00)
212 Furnish and install 34" x
53" RCP Class 111 storm
sewer, complete as Linear
specified Feet 452 435.00 -17.00 $107.00 ($1,819.00)
213 Furnish and install 34" x
53" RCP Class 111 storm
sewer with joint ties and
clay bedding and backfill, Linear
complete as specified Feet 107 104.70 -2.30 $107.00 ($246.10)
214 Furnish and install 38" x
60" RCP Class III storm
sewer, complete as Linear
specified Feet 325 304.70 -20.30 $144.00 ($2,923.20)
215 Furnish and install 43" x
68" RCP Class 111 storm
sewer, complete as Linear
specified Feet 1,532 1,585.20 53.20 $163.00 $8,671.60
216 Furnish and install 43" x
68" RCP Class III storm
sewer with joint ties and
clay bedding and backfill, Linear
complete as specified Feet 42 42.00 $163.00
217 Furnish and install 18"
RCP Class III apron
endwall with joint ties,
complete as specified Each 1 1.00 $1,000.00
218 Furnish and install 21"
RCP Class III apron
endwall with joint ties,
complete as specified Each 1 1.00 $1,050.00
219 Furnish and install 34" x
53" RCP Class III apron
endwall with joint ties,
complete as specified Each 1 1.00 $2,000.00
220 Furnish and install 43" x
68" RCP Class III apron
endwall with joint ties,
complete as specified Each 1 1.00 $3,000.00
221 Furnish and install std.
inlets (Type 1 with 18"
sump) with castings,
complete as specified Each 2 2.00 $1,100.00
222 Furnish and install std.
inlets (Type 1 with no
sump) with castings,
complete as specified Each 2 2.00 $1,100.00
Page 5of13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
223 Furnish and install std.
inlets (Type 3 with 18"
sump) with castings,
complete as specified Each 85 89.00 4.00 $1,150.00 $4,600.00
224 Fumish and install std.
storm manhole (4' inside
diameter) in 25 locations
without casting, complete Vertical
as specified Feet 104.1 102.53 -1.57 $300.00 ($471.00)
225 Furnish and install std.
storm manhole (5' inside
diameter) in 3 locations
without casting, complete Vertical
as specified Feet 11.16 11.14 -0.02 $400.00 ($8.00)
226 Furnish and install std.
storm manhole (6' inside
diameter) in 7 locations
without casting, complete Vertical
as specified Feet 34.1 33.03 -1.07 $500.00 ($535.00)
227 Fumish and install std.
storm manhole (7' x 7') in
15 locations without
casting, complete as Vertical
specified Feet 92.47 92.85 0.38 $900.00 $342.00
228 Furnish and install std.
storm inlet manhole (4'
inside diameter) in 1 (one)
location with casting,
complete as specified Vertical
Feet 3.95 3.79 -0.16 $350.00 ($56.00)
229 Furnish and install std.
storm inlet manhole (5'
inside diameter) in 1 (one)
location with casting,
complete as specified Vertical
Feet 3.38 3.29 -0.09 $500.00 ($45.00)
230 Furnish and install std.
storm inlet manhole (6'
inside diameter) in 7
locations with casting, Vertical
complete as specified Feet 34.18 33.16 -1.02 $575.00 ($586.50)
231 Furnish and install 6" storm
lateral, complete as Linear
specified Feet 2,056 1,988.00 -68.00 $27.00 ($1,836.00)
232 Furnish and install storm
lateral marker balls,
complete as specified Each 175 167.00 -8.00 $18.00 ($144.00)
233 Abandon lineal feet of 8" -
12" storm sewer, complete Linear
as specified Feet 1,396 1,396.00 $10.00
234 Abandon lineal feet of 15"
and larger storm sewer, Linear
complete as specified Feet 769 769.00 $10.00
Page 6 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
235 Abandon inlets or
manholes, complete as
specified Each 36 36.00 $250.00
236 Furnish, install, and
maintain Type "D" inlet
protection std., complete
as specified Each 159 159.00 $90.00
237 Furnish, install, and
maintain silt fence, Linear
complete as specified Feet 278 278.00 $3.00
238 Furnish, install, and
maintain stone bags,
complete as specified Each 34 34.00 $5.00
239 Clear inch - diameter of
existing trees, complete as Inch
specified Diameter 225 225.00 $2.00
240 Grub inch - diameter of
existing stumps, complete Inch
as specified Diameter 225 225.00 $2.00
SECTION II - (BID ITEMS 200 - 240) - SUB - TOTALS $20,008.08 ($12,962.62)
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION II
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
241 EXTRA PER INVOICE Lump
#0002046 -IN Sum 1.00 1.00 $900.00 $900.00
242 EXTRA PER INVOICE Lump
#0002072 -IN Sum 1.00 1.00 $550.00 $550.00
243 EXTRA PER INVOICE Lump
#0002074 -IN Sum 1.00 1.00 $300.00 $300.00
244 EXTRA PER INVOICE Lump
#0002075 -IN Sum 1.00 1.00 $4,650.00 $4,650.00
245 EXTRA PER INVOICE Lump
#0002076 -IN Sum 1.00 1.00 $675.00 $675.00
ADDITIONAL WORK: C.O. # 1 - (ITEMS 241 - 245) - SUB -TOTAL $7,075.00 $0.00
NET INCREASE TO: SECTION II $14,120.46
SECTION III - SANITARY SEWER
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
300 Furnish and install 8"
sanitary sewer (relay), Linear
complete as specified Feet 3,115 3094.68 -20.32 $57.00 ($1,158.24)
Page 7 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
301 Furnish and install 8"
sanitary sewer drop, Vertical
complete as specified Feet 15 15.83 0.83 $450.00 $373.50
302 Furnish and install 10"
sanitary sewer (relay), Linear
complete as specified Feet 145 139.80 -5.20 $77.00 ($400.40)
303 Furnish and install 10"
sanitary sewer drop, Vertical
complete as specified Feet 5 4.54 -0.46 $500.00 ($230.00)
304 Furnish and install 12"
sanitary sewer (relay), Linear
complete as specified Feet 1,485 1529.40 44.40 $83.00 $3,685.20
305 Furnish and install 12"
sanitary sewer drop, Vertical
complete as specified Feet 15 11.72 -3.28 $550.00 ($1,804.00)
306 Furnish and install 15"
sanitary sewer relay, Vertical
complete as specified Feet 5 7.90 2.90 $130.00 $377.00
307 Furnish and install std.
sanitary manhole (4' inside
diameter) in various
locations, complete as Vertical
specified, without casing Feet 210 222.30 12.30 $185.00 $2,275.50
308 Furnish and install 8" x 4"
factory wyes or tees,
complete as specified Each 3 0.00 -3.00 $70.00 ($210.00)
309 Furnish and install 8" x 6"
factory wyes or tees,
complete as specified Each 79 62.00 -17.00 $90.00 ($1,530.00)
310 Furnish and install 10" x 6"
factory wyes or tees,
complete as specified Each 1 1.00 $150.00
311 Furnish and install 12" x 6"
factory wyes or tees,
complete as specified Each 4 23.00 19.00 $190.00 $3,610.00
312 Furnish and install new 4"
sanitary laterals, complete Linear
as specified Feet 50 0.00 -50.00 $46.00 ($2,300.00)
313 Furnish and install 4 " /6"
sanitary lateral relay, Linear
complete as specified Feet 1,630 1776.10 146.10 $46.00 $6,720.60
314 Furnish and install sanitary
lateral marker balls,
complete as specified
Each 174 169.00 -5.00 $18.00 ($90.00)
315 Furnish and install
connections of new
sanitary main to existing
main (various locations
and sizes), complete as
specified Each 14 14.00 $300.00
316 Core into existing sanitary
manhole, complete as
specified Each 1 1.00 $600.00
Page 8 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
317 Abandon sanitary
manholes, complete as
specified Each 21 21.00 $400.00
318 Abandon 8" sanitary sewer
at various locations,
complete as specified Linear
Feet 1,890 1890.00 $3.00
319 Abandon 10" sanitary
sewer at various locations Linear
complete as specified Feet 430 430.00 $3.00
320 Abandon 15" sanitary
sewer at various locations, Linear
complete as specified Feet 350 350.00 $12.00
321 Abandon 18" sanitary
sewer at various locations, Linear
complete as specified Feet 955 955.00 $15.00
322 Abandon 24" sanitary
sewer at various locations, Linear
complete as specified Feet 430 430.00 $17.00
SECTION III - (BID ITEMS 300 - 322) - SUB - TOTALS $17,041.80 ($7,722.64)
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
323 EXTRA PER INVOICE Lump
#0002071 -IN Sum 1.00 1.00 $5,534.00 $5,534.00
324 EXTRA PER INVOICE Lump
#0002077 -IN Sum 1.00 1.00 $4,595.00 $4,595.00
325 EXTRA - MOVE &
REPLACE SAN. MH BASE Lump
Sum 1.00 1.00 $2,680.00 $2,680.00
ADDITIONAL WORK: C. O. # 1 - (ITEMS 323 - 325) - SUB -TOTAL $12,809.00 $0.00
NET INCREASE TO: SECTION III $22,128.16
SECTION IV - WATER MAIN
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
400. Furnish and install 4"
ductile iron water main
w /poly wrap, complete as
specified (fittings not Linear
included) Feet 20 43.00 23.00 $51.00 $1,173.00
Page 9 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE
401. Furnish and install 6"
ductile iron water main
w /poly wrap, complete as
specified (fittings not Linear
included) Feet 455 390.00 -65.00 $52.00 ($3,380.00)
402. Furnish and install 8"
ductile iron water main
w /poly wrap, complete as
specified (fittings not Linear
included) Feet 3,300 3,201.00 -99.00 $52.00 ($5,148.00)
403. Furnish and install 10"
ductile iron water main
w /poly wrap, complete as
specified (fittings not Linear
included) Feet 20 0.00 -20.00 $62.00 ($1,240.00)
404. Furnish and install 12"
ductile iron water main
w /poly wrap, complete as
specified (fittings not Linear
included) Feet 660 692.00 32.00 $68.00 $2,176.00
405. Furnish and install 18"
ductile iron water main,
w /poly wrap, complete as
specified (fittings not Linear
included) Feet 695 723.00 28.00 $106.00 $2,968.00
406. Furnish and install 1" water
service relay, complete as
specified, not including
corporation and stop box Linear
Feet 1,505 1,556.00 51.00 $42.00 $2,142.00
407. Furnish and install new 1"
water service, complete as
specified, not including Linear
corporation and stop box Feet 110 0.00 - 110.00 $42.00 ($4,620.00)
408. Furnish and install 1"
corporation and stop box
with rod, complete as
specified Each 83 81.00 -2.00 $220.00 ($440.00)
409. Furnish and install 8" x 6"
tees, complete as specified
Each 12 8.00 -4.00 $230.00 ($920.00)
410. Furnish and install 8" x 8"
tees, complete as specified
Each 8 8.00 $240.00
411. Furnish and install 18" x 8"
tee, complete as specified
Each 2 1.00 -1.00 $1,200.00 ($1,200.00)
412. Furnish and install 6" x 6"
cut -in tee, complete as
specified Each 2 0.00 -2.00 $1,500.00 ($3,000.00)
413. Furnish and install 8" x 8"
cross, complete as
specified Each 3 0.00 -3.00 $250.00 ($750.00)
Page 10 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
414. Furnish and install 12" X 8"
cross, complete as
specified Each 1 3.00 2.00 $330.00 $660.00
415. Furnish and install 6"
valves, complete as
specified Each 14 16.00 2.00 $1,000.00 $2,000.00
416. Furnish and install 6" cut -in
valve, complete as
specified Each 2 0.00 -2.00 $1,100.00 ($2,200.00)
417. Furnish and install 8"
valves, complete as
specified Each 26 23.00 -3.00 $1,250.00 ($3,750.00)
418. Furnish and install 12"
valves, complete as
specified Each 2 3.00 1.00 $2,500.00 $2,500.00
419. Furnish and install 18"
valve, complete as
specified Each 1 1.00 $9,800.00
420. Furnish and install 6" x 6"
tapping valve and sleeve,
complete as specified Each 3 3.00 $2,100.00
421. Furnish and install 12" x 8"
tapping valve and sleeve,
complete as specified
Each 1 1.00 $2,500.00
422. Furnish and install 8" - 22
'A degree bends, complete
as specified Each 1 0.00 -1.00 $210.00 ($210.00)
423. Furnish and install 4" - 45
degree bends, complete as
specified Each 4 6.00 2.00 $150.00 $300.00
424. Furnish and install 6" - 45
degree bends, complete as
specified Each 34 42.00 8.00 $160.00 $1,280.00
425. Furnish and install 8" - 45
degree bends, complete as
specified Each 11 11.00 $210.00
426. Furnish and install 12" - 45
degree bends, complete as
specified Each 2 3.00 1.00 $350.00 $350.00
427. Furnish and install 18" - 45
degree bends, complete as
specified Each 4 4.00 $1,250.00
428. Furnish and install 8" x 4"
reducer, complete as
specified Each 2 3.00 1.00 $160.00 $160.00
429. Furnish and install 8" x 6"
reducers, complete as
specified Each 15 15.00 $170.00
430. Relocate hydrant,
complete as specified Each 2 0.00 -2.00 $700.00 ($1,400.00)
431. Furnish and install
hydrants, complete as
_specified Each 14 14.00 _ $2,400.00
Page 11 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
432. Furnish and install
gradeloks for hydrant
branches, complete as
specified Each 6 0.00 -6.00 $350.00 ($2,100.00)
433. Furnish and install
connections of new water
main to existing water main
(various sizes and
locations), complete as
specified Each 30 23.00 -7.00 $1,000.00 ($7,000.00)
434. Furnish and install 4" cap,
complete as specified Each 1 0.00 -1.00 $900.00 ($900.00)
435. Furnish and install 6" cap,
complete as specified Each 1 0.00 -1.00 $900.00 ($900.00)
436. Furnish and install 8" cap,
complete as specified Each 1 0.00 -1.00 $900.00 ($900.00)
437. Cut and cap existing 12"
water main, complete as
specified Each 1 0.00 -1.00 $1,100.00 ($1,100.00)
438. Furnish and install 18" cap,
complete as specified
Each 1 1.00 $2,000.00
439. Abandon water main on
Babbitz Avenue (Lane St.
to Sweet St.) complete as Lump
specified Sum 1 1.00 $1,400.00
440. Abandon water main on
Gehres Court (Broad St. to
a point east), complete as Lump
specified Sum 1 1.00 $1,000.00
441. Abandon water main on
Grand Avenue (New York
Ave. to E. Nevada St.), Lump
complete as specified Sum 1 1.00 $2,000.00
442. Abandon water main on
Lane Street (Rahr Ave. to
Babbitz Ave.), complete as Lump
specified Sum 1 1.00 $600.00
443. Abandon water main on
Mt. Vernon Street (New
York Ave. to Custer Ave.), Lump
complete as specified Sum 1 1.00 $2,200.00
444. Abandon water main on E.
Parkway Avenue (Bowen
St. to Hazel St.), complete Lump
as specified Sum 1 1.00 $4,800.00
445. Furnish and install 4"
sleeve, complete as
specified Each 2 3.00 1.00 $110.00 $110.00
446. Furnish and install 6"
sleeve, complete as
specified Each 2 7.00 5.00 $140.00 $700.00
Page 12 of 13
CONTRACT: 09 -07 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
447. Furnish and install 8"
sleeve, complete as
specified Each 2 2.00 $180.00
448. Furnish and install 12"
sleeve, complete as
specified Each 2 1.00 -1.00 $235.00 ($235.00)
SECTION IV - (BID ITEMS 400 - 448) - SUB - TOTALS $16,519.00 ($41,393.00)
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
449 RECONNECT WATER
SERVICE Each 3.00 3.00 $825.00 $2,475.00
450 BOX & ROD ONLY Each 13.00 13.00 $800.00 $10,400.00
451 ULO'S Each 2.00 2.00 $750.00 $1,500.00
452 4" TEE Each 1.00 1.00 $265.00 $265.00
453 18" SLEEVE Each 1.00 1.00 $1,225.00 $1,225.00
454 12" X 6" ANCHORING TEE
Each 1.00 1.00 $475.00 $475.00
455 6" X 6" TEE Each 3.00 3.00 $275.00 $825.00
456 12" X 18" TEE Each 1.00 1.00 $2,485.00 $2,485.00
457 EXTRA PER INVOICE Lump
#0002042 -IN Sum 1.00 1.00 $1,560.00 $1,560.00
458 EXTRA PER INVOICE Lump
#0002073 -IN Sum 1.00 1.00 $1,280.00 $1,280.00
ADDITIONAL WORK: C.O. # 1 (ITEMS 449 - 458) - SUB -TOTAL $22,490.00 $0.00
NET DECREASE TO: SECTION IV ($2,384.00)
NET INCREASE TO SECTIONS I, 11, 111, IV $143,958.15
NET DECREASE TO SECTIONS I, II, III, IV ($189,029.50)
NET DECREASE TO CONTRACT: ($45,071.35)
Page 13 of 13