Loading...
HomeMy WebLinkAboutPW CNT 08-05/CNG 4 3- 2,0/ TRANS# 000409 .76 c5-'3't S o y �,�,, , - A 4;,C ' Cl ,'• o r 6 FAX: 920-235-0321 d f �" PHONE: 920 - 236 -6715 5L5.-.1 6s-r 6 ;.0.5. Building Excellence' LETTER OF TRANSMITTAL �'►/1lrnsea,5iV" ` Ma,J,x. Ccit Cg}ar , �tr41+ di' d ) 4..- — 1 Cm4h G. TO: Mr Joseph Sargent Date: 5/06/10 Job #:082310 AECOM Community Infrastructure Re: Oshkosh Water Filtration 558 N Main St Oshkosh WI Oshkosh WI 54901 City Cgntract #08 -05: WE ARE SENDING YOU: X Attached _ Under separate cover- _ Shop Drawings _ Plans /Specifications _ Project Mod. No. Copy of Letter _ Miron Purchase Order Copies Description 04 Change Order #4 - Partially Executed THE ABOVE IS TRANSMITTED AS MARKED BELOW: _ For Approval _ For Your Signature X For Your Response For Your Use & Info X As Requested REMARKS: Enclosed please find four (4) copies of Change Order #4 for the above referenced project. Please return one (1) fully executed copy to our office. Thank you. PREPARED BY: Dawn Floriano Project Coordinator copy: File / dmf Corporate Office P.O. Box 509 Neenah, WI 54957-0509 M R0N CONSTRUCTION (O CO., iNC, 1471 McMahon Drive Neenah, WI 54956 Building Excellence Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron-construction.com A=COM AECOM 558 N. Main Street, Oshkosh, Wisconsin 54901 T 920 235 0270 F 920 235 0321 www. aecom.com May 5, 2010 Change Order No. 4 Project: Water Filtration Plant Modifications and Demolition Project Owner: City of Oshkosh Contract: 08 -05 Contractor: Miron Construction Description of Change Change Order No.: Request for Quotation No. (Project Modification No.) 4a: RFQ 21 (PM 045) — Demolish Well -like Structure add $9,131.00 4b: RFQ 35 (PM 044) — Modifications to Manhole 100 add $9,310.00 4c: RFQ 16 (PM 047) — 24" RW Valves L.L.P.S. add $5,658.00 4d: RFQ 34 (PM 043 -1) — L.L.P.S. Backflush Line Valve add $7,691.00 4e: RFQ 36 (PM 048) — Thrust Block & RFI 134 Pipe Removal add $2,090.00 4f: RFQ 39 (PM 052) — RFI 142 - Safety Nosing Elevation Diff. add $203.00 4g: RFQ 38 (PM 050) — Excessive Trench Water Investigation add $3,416.00 4h: PM 051 — RFI 140 Rebar Interference add $671.00 4i: PM 053 — Duct Bank Elevation Credit deduct ($24,200.00) 4j: RFQ 40 (PM 055) — Revised Fence and Tree Plan deduct ($832.00) 4k: RFQ 41 (PM 056 -1) — Relocate Existing Hand Hole add $5,142.00 41: PM 057 — Additional Length of 30" Pipe add $2,920.00 4m: RFQ 42 (PM 058 -1) — L.L. Pump Columns Link Seal add $1,207.00 4n: PM 059 — RFI 154 Pipe Encasement Removal add $2,595.00 TOTAL VALUE OF THIS CHANGE ORDER ADD $25,002.00 Contract Price Adjustment Original Contract Price $6,070,273.00 Previous Change Orders $615,591.52 Adjustments in Contract Price this Change Order $25,002.00 Current Contract Price including this Change Order $6,710,866.52 Contract Duration Adjustment Original Contract Duration (Substantial Completion) 365 days Previous Change Orders 91 days Adjustment to Contract Duration this Change Order 0 days Current Contract Duration including this Change Order 456 days Revised Contract Substantial Completion Date Sept. 26, 2009 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED \ . '" s/ ■ `ng feer — CH2M / 1 of RPR — AECOM INC Date it APPR 1 D .04 . d . C/ Contractor — Miron Construct" Date David G. Voss Jr., - • = nt RECOMMENDED BY OWNER •-Nwa Pc4-de_ -5- /I -2oIo Director of Public Works Date APPROVED BY OWNER �--- _ �" 5-43//0 Ci anager 1 Date " %Z ,�i� 1 Imo I 0 City Clerk Date I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wi p nsin under this Chan e Order. e-a44- 57 City Comp ro er Date APPROVED AS TO FORM `, ) -1, i 1 „Cit Attorn� Da e y Y