Building Excellence' LETTER OF TRANSMITTAL �'►/1lrnsea,5iV" ` Ma,J,x.
Ccit Cg}ar , �tr41+ di' d )
4..- — 1 Cm4h G.
TO: Mr Joseph Sargent Date: 5/06/10 Job #:082310
AECOM Community Infrastructure Re: Oshkosh Water Filtration
558 N Main St Oshkosh WI
Oshkosh WI 54901
City Cgntract #08 -05:
WE ARE SENDING YOU: X Attached _ Under separate cover-
_ Shop Drawings _ Plans /Specifications _ Project Mod. No.
Copy of Letter _ Miron Purchase Order
Copies Description
04 Change Order #4 - Partially Executed
THE ABOVE IS TRANSMITTED AS MARKED BELOW:
_ For Approval _ For Your Signature X For Your Response
For Your Use & Info X As Requested
REMARKS:
Enclosed please find four (4) copies of Change Order #4 for the
above referenced project.
Please return one (1) fully executed copy to our office. Thank you.
PREPARED BY: Dawn Floriano
Project Coordinator
copy:
File / dmf
Corporate Office
P.O. Box 509 Neenah, WI 54957-0509
M R0N CONSTRUCTION (O CO., iNC, 1471 McMahon Drive Neenah, WI 54956
Building Excellence Phone: 920 /969 -7000
Fax: 920/969 -7399
www.miron-construction.com
A=COM
AECOM
558 N. Main Street, Oshkosh, Wisconsin 54901
T 920 235 0270 F 920 235 0321 www. aecom.com
May 5, 2010
Change Order No. 4
Project: Water Filtration Plant Modifications and Demolition Project
Owner: City of Oshkosh
Contract: 08 -05
Contractor: Miron Construction
Description of Change
Change Order No.: Request for Quotation No. (Project Modification No.)
4a: RFQ 21 (PM 045) — Demolish Well -like Structure add $9,131.00
4b: RFQ 35 (PM 044) — Modifications to Manhole 100 add $9,310.00
4c: RFQ 16 (PM 047) — 24" RW Valves L.L.P.S. add $5,658.00
4d: RFQ 34 (PM 043 -1) — L.L.P.S. Backflush Line Valve add $7,691.00
4e: RFQ 36 (PM 048) — Thrust Block & RFI 134 Pipe Removal add $2,090.00
4f: RFQ 39 (PM 052) — RFI 142 - Safety Nosing Elevation Diff. add $203.00
4g: RFQ 38 (PM 050) — Excessive Trench Water Investigation add $3,416.00
4h: PM 051 — RFI 140 Rebar Interference add $671.00
4i: PM 053 — Duct Bank Elevation Credit deduct ($24,200.00)
4j: RFQ 40 (PM 055) — Revised Fence and Tree Plan deduct ($832.00)
4k: RFQ 41 (PM 056 -1) — Relocate Existing Hand Hole add $5,142.00
41: PM 057 — Additional Length of 30" Pipe add $2,920.00
4m: RFQ 42 (PM 058 -1) — L.L. Pump Columns Link Seal add $1,207.00
4n: PM 059 — RFI 154 Pipe Encasement Removal add $2,595.00
TOTAL VALUE OF THIS CHANGE ORDER ADD $25,002.00
Contract Price Adjustment
Original Contract Price $6,070,273.00
Previous Change Orders $615,591.52
Adjustments in Contract Price this Change Order $25,002.00
Current Contract Price including this Change Order $6,710,866.52
Contract Duration Adjustment
Original Contract Duration (Substantial Completion) 365 days
Previous Change Orders 91 days
Adjustment to Contract Duration this Change Order 0 days
Current Contract Duration including this Change Order 456 days
Revised Contract Substantial Completion Date Sept. 26, 2009
This document shall become a supplement to the Contract and all provisions will apply hereto.
RECOMMENDED \
. '" s/ ■
`ng feer — CH2M / 1 of RPR — AECOM INC Date
it
APPR 1 D
.04 . d . C/
Contractor — Miron Construct" Date
David G. Voss Jr., - • = nt
RECOMMENDED BY OWNER
•-Nwa Pc4-de_ -5- /I -2oIo
Director of Public Works Date
APPROVED BY OWNER
�--- _ �" 5-43//0
Ci anager 1 Date
" %Z ,�i� 1 Imo I 0
City Clerk Date
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,
Wi p nsin under this Chan e Order.
e-a44- 57
City Comp ro er Date
APPROVED AS TO FORM `, ) -1, i
1 „Cit Attorn� Da e
y Y