Loading...
HomeMy WebLinkAboutPW CNT 08-01/CNG 2 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O. Box 1130 OF)Oshkosh, Wisconsin 54903 -1130 Ph. (920) 236 -5065 Fax (920) 236 -5068 011 --KOJH ON THE WATER February 11, 2010 Mark Hinsz S. J. Louis Construction Inc. 1351 W Broadway Street P. O. Box 459 Rockville, MN 56369 Re: Change Order #2, Contract 08 -01 Dear Mr. Hinsz: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Vinton Construction Company regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, D- id RM/ O David C. Patek J Director of Public Works F1EB DCP/kcd M/ 1 2 / 20/o Enclosure C/ 9 cc: Pam Ubrig, City Clerk (w /original) F ice Lynn Lorenson, Assistant City Attorney (w /copy) File Copy (w /original) I: \Engineering \08 -0I Hazel & New York Interceptor, New York Page 1 of 1 Storm \Project_Information \Contract Info \Change Orders \_Blank Executed Change Order Letter.doc CHANGE ORDER # 2 DATED: January 15, 2010 TO: S. J. LOUIS CONSTRUCTION, INC. 1351 W. BROADWAY STREET P.O. BOX 459 ROCKVILLE, MN 56369 Your present contract with the City of Oshkosh, Contract No. 08 -01 , is hereby amended and changed as follows: NET INCREASE TO: WORK UNIT A - SECTION I - CONCRETE PAVING $11,550.00 NET INCREASE TO: WORK UNIT A - SECTION II - STORM SEWER $8,173.28 NET INCREASE TO: WORK UNIT A - SECTION III - SANITARY SEWER $53,463.66 NET INCREASE TO: WORK UNIT A - SECTION IV - WATER MAIN $63,522.23 NET INCREASE TO CONTRACT: $136,709.17 CITY OF OSHKOSH r BY: `. �.:/ Recommended: City Manager- Director of Public Works City Clerk Approved and accepted: L1 ontra I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. (-1°4 2mpt - roller App ,tied as to form: , al drah 1 et _.. City A'" '"f 1 ° CONTRACT: 08 -01 CHANGE ORDER # 2 WORK UNIT A - SECTION I - CONCRETE PAVING ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 135 Additional labor, equipment, and materials to install underground conduit, pull boxes, and concrete bases for traffic signals in the intersection of Bowen St. and Lump New York Ave., per SPR #15 Sum 1.00 1.00 $11,550.00 $11,550.00 ADDITIONAL WORK: C.O. # 2 - (ITEM 135) - SUB -TOTAL $11,550.00 $0.00 NET INCREASE TO: SECTION 1 $11,550.00 WORK UNIT A - SECTION 11- STORM SEWER ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION II ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 220 Additional labor, equipment, and materials to cut down and cut in new holes for storm sewer in MH SS -2 due to plan being incorrect, per Lump SPR #21 Sum 1.00 1.00 $2,896.52 $2,896.52 221 Additional labor, equipment, and materials to cut one foot of base and re -cut 12" storm , sewer connections on MH ``' SS -3 due to plan elevations Lump being incorrect, per SPR # Sum 1.00 1.00 $1,024.01 $1,024.01 222 Additional labor, equipment, and materials to over excavate area to install storm sewer lead from inlet 3.4 to inlet 3.3 and relocate inlet 3.4 due to gas main conflict, Lump per SPR #27 Sum 1.00 1.00 $779.08 $779.08 223 Additional labor, equipment, and materials to cut in opening in new inlet and MH #3 to install added 12" RCP which was added to contract, Lump per SPR #30 Sum 1.00 1.00 $400.91 $400.91 Page 1 of 5 CONTRACT: 08 -01 CHANGE ORDER # 2 224 Additional labor, equipment, and materials to relocate inlet 4-4 to the west to avoid conflict with gas main. Gas main had to be over excavated to it to be raised 1.5 feet per SPR #29 and Lump SPR #31 Sum 1.00 1.00 $2,799.76 $2,799.76 225 Additional labor, equipment, and materials needed to cut down and lower storm inlets. Inlets were set to plan grade Lump per SPR #33 Sum 1.00 1.00 $273.00 $273.00 ADDITIONAL WORK: C.O. # 2 - (ITEMS 220 -225) - SUB -TOTAL $8,173.28 $0.00 NET INCREASE TO: SECTION II $8,173.28 WORK UNIT A - SECTION III - SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION III ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 341 Additional labor, equipment, and materials to reset MH H- 12. Elevations were incorrect on plans and MH needed to be raised 1.0 feet. Drop in MH H -12 was abandoned. New hole 18" pipe needed to be cut in and lower hole was required to be abandoned and plugged. Sewage needed to be bi- passed during the reconfiguration of manhole, Lump per SPR #18 & SPR #19. Sum 1.00 1.00 $12,577.81 $12,577.81 342 Additional labor, equipment, and materials to raise MH N- 6 three feet due to wrong elevation on plans. Additional manhole section needed to be ordered and installed, MH N -6 was buried to allow traffic onto roadway while section was being built and had to be excavated once section arrived, per Lump SPR #20 Sum 1.00 1.00 $962.45 $962.45 343 Additional labor, equipment, and materials to reconnect existing sanitary sewer outside of MH #13 at Broad St. Existing main was 15' higher than plan grade and required 2 -10" 45° bends to Lump be installed, per SPR #24 Sum 1.00 1.00 $1,614.36 $1,614.36 Page 2of5 CONTRACT: 08 -01 CHANGE ORDER # 2 344 Additional labor, equipment, and materials to investigate a lateral backup at 1136 Eastman. Lateral was excavated to determine the cause of backup. Upon excavation, it was determined nothing was wrong with lateral, per SPR Lump #28 Sum 1.00 1.00 $1,187.44 $1,187.44 345 Additional labor, equipment and materials to excavate and install sanitary lateral and water service for # 905 E. New York Avenue. Utilities were not shown on plans and in conflict with sewer, per Lump SPR #38 and SPR #39 Sum 1.00 1.00 $2,621.29 $2,621.29 346 Additional labor, equipment, and materials to excavate around utilities not shown on plans to install sanitary sewer Lump main, per SPR #40 Sum 1.00 1.00 $3,246.40 $3,246.40 347 Due to the timing of the construction of Mt. Vernon Ave. by Carl Bowers & Sons, various temporary manholes did not need to be installed. Since manholes were already delivered we bought manholes and put them in Lump City yard, per SPR #47 Sum 1.00 1.00 $4,966.97 $4,966.97 348 After S.J. Louis televised sanitary sewer, sewer laterals had large amounts of clear water. City requested the laterals be televised to verify the source of inflow. Upon completion it was determined that inflow was outside limits of construction, Lump per SPR #48 Sum 1.00 1.00 $1,617.54 $1,617.54 349 Furnish and install 8" sanitary sewer drops, complete as specified Each 15.36 15.36 $350.00 $5,376.00 350 Furnish and install 10" sanitary sewer drops, complete as specified Each 5.06 5.06 $415.00 $2,099.90 351 Furnish and install 12" sanitary sewer drops, complete as specified Each 28.66 28.66 $475.00 $13,613.50 352 Furnish and install 21" sanitary sewer drops, complete as specified Each 3.58 3.58 $1,000.00 $3,580.00 ADDITIONAL WORK: C. O. # 2 - (ITEMS 341 -352) - SUB -TOTAL $53,463.66 $0.00 NET INCREASE TO: SECTION I11 $53,463.66 WORK UNIT A - SECTION IV - WATER MAIN Page 3 of 5 CONTRACT: 08 -01 CHANGE ORDER # 2 ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 434 Additional labor, equipment, and materials to cut and cap existing 6" watermain to install sanitary sewer between MH# 7 and MH# 8, and the watermain had to be relocated around MH# 8 due to the size and location. City supplied parts and S.J. Louis installed pipe, per SPR Lump #22 and SPR #23 Sum 1.00 1.00 $6,253.06 $6,253.06 435 At watermain connection by railroad tracks plan called for a 90° bend. City requested 2- 45° bends to be used due to location of existing watermain, additional time was required to make Lump connection, per SPR #25 Sum 1.00 1.00 $5,057.01 $5,057.01 436 Due to shallowness and condition of existing watermain by MH N-4, the watermain broke when MH N- 4 was excavated. Additional time to cut & cap watermain, City supplied all parts, per Lump SPR #34 Sum 1.00 1.00 $3,260.42 $3,260.42 437 Additional labor, equipment, and materials to install watermain across New York Ave. at Oak St. after MH N-4 was installed and backfilled. Watermain broke in another Lump location, perSPR #35 Sum 1.00 1.00 $1,639.45 $1,639.45 438 Additional labor, equipment, and materials to expose watermain in Oak St. Once exposed, water department decided a new valve and tee needed be installed, per SPR Lump #36 and SPR #37 Sum 1.00 1.00 $2,694.37 $2,694.37 439 Additional labor and equipment to repair watermain that was broke over the weekend at station 74 +50. City supplied the parts, per SPR #42 and SPR Lump #43 Sum 1.00 1.00 $3,809.92 $3,809.92 440 Additional labor, equipment, and materials to cut and cap broken watermain by MH N- Lump 18, per SPR #44 Sum 1.00 1.00 $2,661.29 $2,661.29 Page 4 of 5 CONTRACT: 08 -01 CHANGE ORDER # 2 441 Additional labor and equipment to repair leaking watermain at stations 50 +50 Lump and 80 +90, per SPR #45 Sum 1.00 1.00 $2,474.24 $2,474.24 442 Additional labor and equipment to cap broken watermain at station 75 +25, Lump per SPR #46 Sum 1.00 1.00 $1,024.97 $1,024.97 443 Additional labor, equipment, and materials to lower watermain approximately 2.5 feet from plan grade to eliminate multiple bends and potential service conflicts with storm sewer, per SPR Lump #49 Sum 1.00 1.00 $29,137.50 $29,137.50 444 Furnish and install 4" sleeve, complete as specified Each 1.00 1.00 $180.00 $180.00 445 Furnish and install 6" sleeve, complete as specified Each 10.00 10.00 $200.00 $2,000.00 446 Furnish and install 8" sleeve, complete as specified Each 2.00 2.00 $240.00 $480.00 447 Fumish and install 6 "x6 "x6" tee, complete as specified Each 1.00 1.00 $350.00 $350.00 448 Furnish and install 6 "x6" tapping valve and sleeve, Lump complete as specified Sum 1.00 1.00 $1,200.00 $1,200.00 449 Furnish and install 8 "x6" tapping valve and sleeve, Lump _complete as specified Sum 1.00 1.00 $1,300.00 $1,300.00 ADDITIONAL WORK: C.O. *2 (ITEMS 434 -449) - SUB -TOTAL $63,522.23 $0.00 NET INCREASE TO: SECTION IV $63,522.23 NET INCREASE TO SECTIONS 1, 11, III, IV $136,709.17 NET DECREASE TO SECTIONS 1,11, 111, IV $0.00 NET INCREASE TO CONTRACT: $136,709.17 Page 5 of 5