HomeMy WebLinkAboutPWT CNT 09-28/CNG 1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 Fa. (920) 236 -5065 Ol -KO /H Fax (920) 236-5068 ON THE WATER February 11, 2010 Mark Schleis PTS Contractors, Inc. 4075 Eaton Road Green Bay, WI 54311-9340 Re: Change Order #1 /Contract 09 -28 Dear Mr. Schleis: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Vinton Construction Company regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, c Vle-c David C. Patek Director of Public Works o ECEI7VELD DCP /kcd Enclosure FEB 12 2010 cc: Pam Ubrig, City Clerk (w /original) CITY CLERK' OFFICE Lynn Lorenson, Assistant City Attorney (w /copy) File Copy (w /original) 1: \Engineering109 -28 Jackson & Murdock Utility Relocation \Project_Information \Contract Page 1 of 1 Info \CHANGE ORDERS \_Blank Executed Change Order Letter.doc CHANGE ORDER # 1 DATED: January 22, 2010 TO: PTS CONTRACTORS, INC. 4075 EATON RD GREEN BAY, WI 54311 -9340 Your present contract with the City of Oshkosh, Contract No. 09 -28 , is hereby amended and changed as follows: NET DECREASE TO: SECTION I - CONCRETE PAVING ($2,601.90) NET DECREASE TO: SECTION II - STORM SEWER ($952.00) NET DECREASE TO: SECTION III - SANITARY SEWER ($15,653.34) NET DECREASE TO: SECTION IV - WATER MAIN ($5,720.64) NET DECREASE TO CONTRACT: ($24,927.88) CITY OF OSHKOSH BY: Q;-- Recommended: City Man- • - r On , Director of Public Works City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Ade, m P troller ApprAved as to form: City Attorney CONTRACT: 09 - 28 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 100 Pavement removal, Square complete as specified Yards 3450 1840.93 - 1,609.07 $0.26 ($418.36) 101 Sidewalk and driveway removal, complete as Square specified Feet 1000 200.00 - 800.00 $0.16 ($128.00) 102 Excavation, complete as Lump specified Sum 1 1.00 $2,100.00 103 Furnish and install temporary pavement and driveways, complete as Square specified Yards 4150 1840.83 - 2,309.17 $10.64 ($24,569.57) 104 Sawing, complete as Linear specified Feet 500 3931.61 3,431.61 $1.70 $5,833.74 105 Adjust manholes and inlets, complete as specified Each 20 7.00 -13.00 $132.00 ($1,716.00) 106 Terrace work on West Murdock Avenue, complete Lump as specified Sum 1 0.00 -1.00 $660.00 ($660.00) 107 Terrace work on Jackson Street, complete as Lump specified Sum 1 0.00 -1.00 $150.00 ($150.00) 108 Eliminated Square from specified Yard& 2980 - - - -- Contract 109 Furnish and inctall 8 inch Eliminated Sg uare from Yard& 574 Contract 110 Furnish and install traffic control, complete as Lump specified Sum 1 1.00 $13,000.00 111 Furnish and install traffic delineator replacement, complete as specified Each 100 0.00 - 100.00 $0.01 ($1.00) SECTION I - (BID ITEMS 100 - 111) - SUB - TOTALS $5,833.74 ($27,642.93) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 112 Excavation and disposal of contaminated soil encountered on project Ton 0.00 517.02 517.02 $37.15 $19,207.29 ADDITIONAL WORK: C.O. # 1 - (ITEM 112) - SUB -TOTAL $19,207.29 $0.00 NET DECREASE TO: SECTION 1 ($2,601.90) Page 1 of 6 CONTRACT: 09 - 28 CHANGE ORDER # 1 INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE SECTION II - STORM SEWER INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 200 Furnish and install reconnecting of existing storm sewer or inlet leads, complete as specified Each 10 6.00 -4.00 $238.00 ($952.00) 201 Furnish, install, and maintain Type "D" inlet protection, complete as specified Each 10 10.00 $85.00 SECTION II - (BID ITEMS 201 - 202) - SUB - TOTALS $0.00 ($952.00) NET DECREASE TO: SECTION II ($952.00) SECTION III - SANITARY SEWER INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 300 Furnish and install 10" sanitary sewer relay, Linear complete as specified Feet 40 42.00 2.00 $62.90 $125.80 301 Furnish and install 15" sanitary sewer relay, Linear complete as specified Feet 1235 1219.10 -15.90 $58.45 ($929.36) 302 Furnish and install 24" sanitary sewer relay, Linear complete as specified Feet 20 23.00 3.00 $112.00 $336.00 303 Furnish and install std. sanitary manhole (4' inside diameter) in various locations, complete as Vertical specified Feet 35 33.23 -1.77 $239.00 ($423.03) 304 Furnish and install 15" x 6" factory wyes, complete as specified Each 10 10.00 $259.00 305 Furnish and install 4 "/6" sanitary lateral relay, Linear complete as specified Feet 375 24.00 - 351.00 $41.25 ($14,478.75) 306 Furnish and install sanitary lateral marker balls, complete as specified Each 20 8.00 -12.00 $28.50 ($342.00) 307 Furnish and install connections of new sanitary main to existing main (various locations and sizes), complete as specified Each 4 3.00 -1.00 $370.00_ ($370.00) Page 2 of 6 • CONTRACT: 09 - 28 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PR /CE 308 Furnish and install concrete collars, complete as specified Each 1 2.00 1.00 $530.00 $530.00 309 Remove or abandon existing sanitary manholes, complete as specified Each 7 6.00 -1.00 $340.00 ($340.00) 310 Abandon 8" sanitary sewer at various locations, complete as specified Linear Feet 55 55.00 $5.30 311 Abandon 10" sanitary sewer at various locations, complete as specified Linear Feet 35 35.00 $5.30 312 Abandon 15" sanitary sewer at various locations, complete as specified Linear Feet 20 20.00 $17.00 313 Abandon 24" sanitary sewer at various locations, complete as specified Linear Feet 670 670.00 $7.50 314 Furnish and install reconnections of sanitary laterals, complete as specified Each 7 8.00 1.00 $238.00 $238.00 SECTION III - (BID ITEMS 300 - 314) - SUB - TOTALS $1,229.80 ($16,883.14) NET DECREASE TO: SECTION III ($15,653.34) SECTION IV - WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 400 Furnish and install 4" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 45 9.00 -36.00 $57.50 ($2,070.00) 401 Furnish and install 6" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 100 63.00 -37.00 $60.00 ($2,220.00) 402 Furnish and install 8" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 25 27.00 2.00 $62.80 $125.60 403 Furnish and install 10" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included) Feet 1700 1668.00 -32.00 $70.60 ($2,259.20) Page 3 of 6 CONTRACT: 09 - 28 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 404 Furnish and install 1" water service relay, complete as specified, not including corporation and stop box Linear Feet 100 30.00 - 70.00 $40.60 ($2,842.00) 405 Furnish and install 1 "A" water service relay, complete as specified, not including corporation and Linear stop box Feet 50 34.00 -16.00 $54.30 ($868.80) 406 Furnish and install 2" water service relay, complete as specified, not including corporation and stop box Linear Feet 15 4.00 -11.00 $64.35 ($707.85) 407 Furnish and install 1" corporation and stop box with rod, complete as specified Each 3 3.00 $227.30 408 Furnish and install 1 %Y" corporation and stop box with rod, complete as specified Each 3 3.00 $480.00 409 Furnish and install 2" corporation and stop box with rod, complete as specified Each 3 2.00 -1.00 $630.00 ($630.00) 410 Furnish and install 8" x 6" tee, complete as specified Each 1 1.00 $302.00 411 Furnish and install 10" x 4" tee, complete as specified Each 1 1.00 $312.00 412 Furnish and install 10" x 6" tees, complete as specified Each 2 2.00 $348.00 413 Furnish and install 10" x 8" tees, complete as specified Each 2 2.00 $376.50 414 Furnish and install 10" x 10" cross, complete as specified Each 1 1.00 $525.00 415 Furnish and install 4" valve, complete as specified Each 1 1.00 $740.00 416 Furnish and install 6" valves, complete as specified Each 3 3.00 $875.00 417 Furnish and install 8" valves, complete as specified Each 2 2.00 $1,204.00 418 Furnish and install 10" valves, complete as specified Each 6 8.00 2.00 $1,670.00 $3,340.00 419 Furnish and install 10" cut - in valve, complete as specified Each 1 0.00 -1.00 $2,277.00 ($2,277.00) Page 4 of 6 CONTRACT: 09 - 28 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 420 Furnish and install 10" -11 '' "A bends, complete as specified Each 3 0.00 -3.00 $289.00 ($867.00) 421 Furnish and install 4" - 45° bends, complete as specified Each 2 1.00 -1.00 $138.00 ($138.00) 422 Furnish and install 6" - 45° bends, complete as specified Each 4 14.00 10.00 $182.00 $1,820.00 423 Furnish and install 10" - 45° bends, complete as specified Each 17 9.00 -8.00 $310.00 ($2,480.00) 424 Furnish and install 8" x 6" reducers, complete as specified Each 2 2.00 $200.00 425 Furnish and install 10" x 6" reducers, complete as specified Each 1 1.00 $220.00 426 Fumish and install hydrants, complete as specified Each 3 3.00 $2,460.00 427 Furnish and install gradeloks, complete as specified Each 3 0.00 -3.00 $74.00 ($222.00) 428 Furnish and install connections of new water main to existing water main (various sizes and locations), complete as specified Each 5 7.00 2.00 $1,488.00 $2,976.00 429 Abandon water main on W. Murdock Avenue (Wisconsin St. to Burdick St.), complete as specified Lump Sum 1 1.00 $1,060.00 430 Abandon water main on Jackson Street (Sta 19 +00 to Sta 25 +00), including crossing streets, complete as specified Lump Sum 1 1.00 $1,060.00 431 Furnish and stall reconnections of existing water services, complete as specified Each 7 4.00 -3.00 $300.00 ($900.00) SECTION IV - (BID ITEMS 400 - 431) - SUB - TOTALS $8,261.60 ($18,481.85) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 432 Furnish and install 10" sleeves, complete as specified Each 0.00 3.00 3.00 $257.90 $773.70 Page 5 of 6 CONTRACT: 09 - 28 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PR /CE 433 Furnish and install 6" sleeves, complete as specified Each 0.00 3.00 3.00 $175.20 $525.60 434 Furnish and install 6" cap, complete as specified Each 0.00 1.00 1.00 $111.15 $111.15 435 Furnish and install low permeable plugs, complete as specified Each 0.00 4.00 4.00 $65.00 $260.00 436 Furnish and install 12" sleeve, complete as specified Each 0.00 1.00 1.00 $387.60 $387.60 437 Furnish excavation, labor, and equipment to cut and plug existing watermain in the intersection of Jackson and Murdock, per Invocie Lump #09- 558 -01 Sum 0.00 1.00 1.00 $1,296.23 $1,296.23 438 Furnish labor and equipment to remove existing water valve manhole that was in clonflcit with propsoed water main work at Station 56 +75, per Invocie #09 -558• Lump 02 Sum 0.00 1.00 1.00 $1,145.33 $1,145.33 ADDITIONAL WORK: C.O. # 1 (ITEMS 432 - 438) - SUB -TOTAL $4,499.61 50.00 NET DECREASE TO: SECTION IV ($5,720.64) NET INCREASE TO SECTIONS I, II, III, IV $39,032.04 NET DECREASE TO SECTIONS I, II, III, IV ($63,959.92) NET DECREASE TO CONTRACT: ($24,927.88) Page 6 of 6