Loading...
HomeMy WebLinkAboutPWT CNT 09-06/CNG 2 City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 Oh - <OJH ON THE WATER January 20, 2010 Mr. Leroy Fischer Fischer -Ulman Construction, Inc. 1115 S. Theodore Street Appleton, WI 54915 Re: Change Order #2 /Contract 09 -06 Dear Mr. Fischer: Enclosed please find an executed copy of the Change Order #2 between the City of Oshkosh and Fischer -Ulman Construction, Inc. regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, J«�.,1 C. David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original) CHANGE ORDER # 2 DATED: December 30, 2009 TO: FISCHER -ULMAN CONSTRUCTION 1115 S. THEODORE STREET APPLETON, WI 54915 Your present contract with the City of Oshkosh, Contract No. 09 -06 , is hereby amended and changed as follows: NET INCREASE TO CONTRACT: $73,360.74 CITY OF OSHKOSH � BY:_i Recommended: City Manager I , c-. &L. • Director of Public Works City Clerk Approved and accepted: E r / Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. /24 -cam omp roller Approved as to form: C , L41 City Att. - , CONTRACT: 09 -06 CHANGE ORDER # 2 CONCRETE SIDEWALK (New and Reconstruction) ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Sidewalk removal & driveway removal, Square complete as specified Feet 95,520.00 106,019.38 10,499.38 0.33 3,464.80 2 Concrete /asphalt sawing, Linear complete as specified Feet 4,750.00 4,826.20 76.20 2.00 152.40 3 Construct 4" thick concrete sidewalk in various locations in the City of Oshkosh, complete as Square specified Feet 92,500.00 97,452.64 4,952.64 2.72 13,471.18 4 Construct 6" thick concrete sidewalk in various locations in the City of Oshkosh, complete as Square specified Feet 18,000.00 17,890.10 - 109.90 3.08 ($338.49) 5 Construct 7" thick crosswalk areas, complete Square as specified Feet 5,000.00 3,006.77 - 1,993.23 3.28 ($6,537.79) 6 Provide and install metal detectable warning plates, complete as specified Square Feet 272.00 248.00 -24.00 28.00 ($672.00) 7 Three (3 ") inch asphalt replacement, complete as Square specified Feet 2,000.00 2,313.35 313.35 3.70 1,159.40 8 Curb and gutter removal, Linear complete as specified Feet 425.00 442.60 17.60 3.50 61.60 9 Construct 30" curb and gutter, complete as Linear specified Feet 425.00 442.60 17.60 16.80 295.68 10 Terrace restoration, including seed, fertilizer, and mulch, complete as Square specified Yards 1,000.00 3,618.66 2,618.66 3.90 10,212.77 11 Furnish and install pavement ties, complete as specified Each 125.00 51.00 -74.00 7.00 ($518.00) 12 Construct 4" thick concrete sidewalk in Water Dept. repair locations as approx. 60 sites, complete as Square specified Feet 2,500.00 2,141.85 - 358.15 4.10 ($1,468.42) 13 Construct 6" thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as Square specified Feet 1,500.00 630.93 - 869.07 4.26 ($3,702.24) 14 7" non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, Square complete as specified Yards 100.00 126.01 26.01 39.00 1,014.39 Page 1 of 5 CONTRACT: 09 -06 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 15 8" non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terrace & traffic control, complete as specified Square Yards 1,500.00 311.37 - 1,188.63 39.00 ($46,356.57) 16 8" special High Early Strength, non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading, terracing and traffic control, Square complete as specified Yards 175.00 8.00 - 167.00 46.50 ($7,765.50) 17 Extra crushed stone base, complete as specified Tons 250.00 79.20 - 170.80 14.00 ($2,391.20) 18 No. 4 epoxy- coated reinforced rods, installed Linear as specified Feet 300.00 260.00 -40.00 1.50 ($60.00) 19 Furnish, install, and maintain Type "C" inlet protection, complete as specified Each 15.00 0.00 -15.00 40.00 ($600.00) 20 Furnish, install, and maintain Type "D" inlet protection, complete as specified Each 5.00 41.00 36.00 40.00 1,440.00 21 Construct 12" wide radius curb head, complete as Linear specified Feet 175.00 113.50 -61.50 3.50 ($215.25) 22 Furnish, install, and maintain erosion mat, Square complete as specified Yards 600.00 70.60 - 529.40 1.75 ($926.45) 23 Profile sawcut concrete Linear curb, complete as specified Feet 60.00 37.40 -22.60 40.00 ($904.00) SUB -TOTAL CONCRETE SIDEWALK (NEW & RECONSTRUCTION) 31,272.22 ($72,455.91) CHANGES TO CHANGE ORDER #1 ADDITIONAL WORK FOR THE MILES KIMBALL REDEVELOPMENT CONCRETE PAVING ITEM C/O #1 INSTALLED NET NET COST PER INCREASE 1N DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Pavement removal Square Yards 453.30 442.80 -10.50 7.00 ($73.50) 2 Sidewalk & driveway Square removal Feet 10,141.00 11,565.20 1,424.20 0.33 469.99 3 8" Concrete pavement with integral curb, 6" base & Square grading Yards _ 1,034.40 881.90 - 152.50 39.00 ($5,947.50) Page 2 of 5 CONTRACT: 09 -06 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 4 12" Radius curb head Linear Feet 113.40 123.20 9.80 3.50 34.30 5 4" Concrete sidewalk Square Feet 5,188.50 7,542.20 2,353.70 2.72 6,402.06 6 6" Concrete sidewalk Square Feet 2,592.00 1,364.90 - 1,227.10 3.08 ($3,779.47) 7 Adjust manholes & inlets Each 13.00 15.00 2.00 125.00 250.00 8 No. 4 reinforcing bars Linear (epoxy coated) Feet 240.00 540.00 300.00 1.50 450.00 9 Detectable warning field Square Feet 48.00 56.00 8.00 28.00 224.00 10 Terrace work Square Yards 922.40 744.60 - 177.80 3.90 ($693.42) CHANGE TO ADDITIONAL ITEMS - CONCRETE PAVING - SUB - TOTALS 7,830.35 ($10,493.89) CHANGES TO CHANGE ORDER #1 ADDITIONAL WORK FOR THE MILES KIMBALL REDEVELOPMENT STORM SEWER ITEM C/O #1 INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 11 12" Storm sewer Linear Feet 159.00 157.80 -1.20 49.50 ($59.40) 12 Inlets (type 3 with 18" sum. with castings Each 8.00 8.00 1,650.00 13 Rebuild storm manhole in one location Each 2.50 6.86 4.36 1,375.00 5,995.00 14 Std. storm manhole in one location (5' ID) Each 4.46 3.47 -0.99 550.00 ($544.50) 15 Abandon inlets or manholes Each 5.00 5.00 385.00 16 Furnish, install, & maintain type D inlet protection Each 17.00 6.00 -11.00 110.00 ($1,210.00) 17 Connect to ex storm manhole Each 5.00 5.00 165.00 CHANGE TO ADDITIONAL ITEMS - STORM SEWER - SUB - TOTALS 5,995.00 ($1,813.90) ADDITIONAL WORK FOR THE MILES KIMBALL REDEVELOPMENT - CIO #2 CONCRETE PAVING ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 18 Abandon two concrete vaults on W. 8th Avenue, Lump complete as specified Sum 0.00 1.00 1.00 1,845.00 1,845.00 19 Concrete sawing, complete Linear as specified Feet 0.00 49.10 49.10 2.00 98.20 Page 3 of 5 CONTRACT: 09 -06 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 20 8" Special High Early Strength non - reinforced concrete pavement removal & replacement, including sawing, pavement ties, integral curb and grading, terracing and traffic control, Square complete as specified Yards 0.00 40.50 40.50 46.50 1,883.25 21 Extra crushed stone base, complete as specified Tons 0.00 250.00 250.00 14.00 3,500.00 22 8"/7-bag non - reinforced concrete removal and replacement, including sawing, pavement ties, integral curb & grading, terracing and traffic control, Square complete as specified Yards 0.00 250.70 250.70 45.12 11,311.58 23 8" Concrete sidewalk, Square complete as specified Feet 0.00 56.00 56.00 4.77 267.12 ADDITIONAL ITEMS - CONCRETE PAVING - SUB - TOTALS 18,905.15 $0.00 ADDITIONAL WORK FOR THE MILES KIMBALL REDEVELOPMENT - CIO #2 STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 24 6 Hours to relocate inlets on W. 9th Avenue and Nebraska Street Each 0.00 6.00 6.00 300.00 1,800.00 ADDITIONAL ITEMS - STORM SEWER - SUB - TOTALS 1,800.00 $0.00 CONCRETE SIDEWALK (New and Reconstruction) ADDITIONAL ITEMS ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 25 7"17-Bag non - reinforced concrete removal & replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, Square complete as specified Yards 0.00 72.51 72.51 44.55 3,230.32 Page 4 of 5 CONTRACT: 09 -06 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 26 8 "/7 -bag non - reinforced concrete removal & replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, Square complete as specified Yards 0.00 1,146.08 1,146.08 45.12 51,711.13 27 8 "/8 -bag non - reinforced concrete removal & replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, Square complete as specified Yards 0.00 276.17 276.17 45.92 12,681.73 28 9 "17 -bag non - reinforced concrete removal & replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, Square complete as specified Yards 0.00 164.52 164.52 54.75 9,007.47 29 9 "/8 -bag non - reinforced concrete removal & replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, Square complete as specified Yards 0.00 92.25 92.25 59.85 5,521.16 30 8" curb, complete as Linear specified Feet 0.00 63.00 63.00 5.17 325.71 31 8" sidewalk, complete as Square specified Feet 0.00 1,560.00 1,560.00 4.77 7,441.20 32 Move shed at 3098 Jackson Street, complete Lump as specified Sum 0.00 1.00 1.00 80.00 80.00 33 Remove trees, brush, and stumps at 3098 Jackson Street, complete as Lump specified Sum 0.00 1.00 1.00 875.00 875.00 34 Remove two trees at 51 Fernau Avenue, complete Lump as specified Sum 0.00 1.00 1.00 120.00 120.00 35 Remove 56 ft. of .5' curb at 2920 N. Main Street, Linear complete as specified Feet 0.00 56.00 56.00 3.50 196.00 36 Replace 21 ft. of .5' curb at 2920 N. Main Street, Linear complete as specified Feet 0.00 21.00 21.00 12.00 252.00 37 Grade fill under sidewalk at miscellaneous locations, Lump complete as specified Sum 0.00 1.00 1.00 880.00 880.00 ADDITIONAL ITEMS - CONCRETE SIDEWALK 92,321.72 $0.00 158,124.44 ($84,763.70) NET INCREASE TO CONTRACT 09 -06: 73,360.74 Page 5 of 5