Loading...
HomeMy WebLinkAboutPW CNT 09-04/CNG1 City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 1 1 OIHKOIH ON THE WATER November 5, 2009 Mr. Bill Bowers Carl Bowers Construction Co., Inc. N1844 Maloney Road Kaukauna, WI 54130 Re: Change Order #1 /Contract 09 -04 Dear Mr. Bowers: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Carl Bowers Construction Co., Inc. regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, 000A/Z41 £� i / - David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original) CHANGE ORDER # 1 DATED: October 7, 2009 TO: Carl Bowers & Sons Construction Co., Inc. N1844 Maloney Road Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No. 09 -04 , is hereby amended and changed as follows: NET INCREASE TO: SECTION III - SANITARY SEWER $16,755.82 NET INCREASE TO: SECTION IV - WATER MAIN $27,679.00 NET INCREASE TO CONTRACT: $44,434.82 CITY OF OSHKOSH BY: /2 /? Recommended: City Manag- .,;.d c. - ,P ark' kk �- Director of Public Works City Clerk Approved and accepted: Vr Contractor certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. C omptroller Apvroved as to form: 1 Cit Attorne - = -°-" ; � NOV 0 9 2009'' CITY CLIF11222.11,gfi CONTRACT: 09 -04 CHANGE ORDER # 1 SECTION III - SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 324 Additional labor, equipment, and materials to plug and re -core new hole in MH E -6 due to water main conflicts, per Lump Invoice #2031 Sum 1.00 1.00 $3,285.00 $3,285.00 325 Additional labor, equipment, and materials to remove existing concrete encased sanitary laterals on 11th Avenue, from Ohio St. to Georgia Lump Ave., per Invoice #2033 Sum 1.00 1.00 $4,187.50 $4,187.50 326 Additional labor, equipment, and materials to core into existing MH 16- 524 in intersection of Sullivan St. and Lombard Ave., due to stub at wrong elevation and direction, per Lump Invoice #2035 Sum 1.00 1.00 $1,050.00 $1,050.00 327 Additional labor, equipment, and materials to connect additional sanitary later from Tan Lump Lines, per Invoice #2036 Sum 1.00 1.00 $1,260.00 $1,260.00 328 Additional labor, equipment, and materials to reconnect laterals at Lakeside Marina that were in conflict with storm sewer installation, per Invoice Lump #2045 Sum 1.00 1.00 $6,973.32 $6,973.32 ADDITIONAL WORK: C. O. # 1 - (ITEMS 324 - 328) - SUB -TOTAL $16,755.82 $0.00 NET INCREASE TO: SECTION III $16,755.82 SECTION IV - WATER MAIN ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 439 Furnish and install 8" solid sleeve, complete as specified Each 4.00 4.00 $275.00 $1,100.00 440 Furnish and install 8" 22 1/2 degree bends, complete as specified Each 3.00 3.00 $275.00 _ $825.00 Page 1 of 3 CONTRACT: 09 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 441 Furnish and install 6x6" locking tee, complete as specified Each 1.00 1.00 $325.00 $325.00 442 Furnish and install 6"x12" SSI sleeve, complete as specified Each 1.00 1.00 $300.00 $300.00 443 Furnish and install 8 "x12" SSI sleeve, complete as specified Each 1.00 1.00 $350.00 $350.00 444 Furnish and install 10 "x8" tee, complete as specified Each 5.00 5.00 $300.00 $1,500.00 445 Furnish and install 10" solid sleeve, complete as specified Each 4.00 4.00 $300.00 $1,200.00 446 Furnish and install 6" solid sleeve, complete as specified Each 2.00 2.00 $225.00 $450.00 447 Furnish and install 10" 45 degree bends, complete as specified Each 4.00 4.00 $300.00 $1,200.00 448 Furnish and install 10" gate valve, complete as specified Each 1.00 1.00 $2,200.00 $2,200.00 449 Furnish and install 10 "x10 "x6" tee, complete as specified Each 1.00 1.00 $475.00 $475.00 450 Furnish and install 10" D.I. watermain, complete as Linear specified Foot 52.80 52.80 $80.00 $4,224.00 451 Additional labor, equipment, and materials to fix unmarked waterman that was hit in the intersection of 11th Ave. and Rugby Ave., per Lump Invoice # 2034 Sum 1.00 1.00 $2,010.00 $2,010.00 452 Additional labor, equipment, and materials to sleeve existing watermain. Plan called for a cut and cap, but due to a leaded tee, it was removed and sleeved, per Invoice Lump #2037 Sum 1.00 1.00 $955.00 $955.00 453 Additional labor, equipment, and materials to cut -in and sleeve existing waterman. Plan called for 8 "x10" tapping tees but Water Department requested cut -in, per Lump Invoice #2038 Sum 1.00 1.00 $930.00 $930.00 Page 2 of 3 CONTRACT: 09 -04 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 454 Additional labor, equipment, and materials to lower the watermain that was in conflict with the storm sewer in the intersection of Hawk St. and Taft Ave., per Invoice Lump #2039 Sum 1.00 1.00 $3,975.00 $3,975.00 455 Additional labor, equipment and materials to lower new waterman that was in conflict with storm sewer after safe sample was taken, per Invoice #2040 Lump Sum 1.00 1.00 $670.00 $670.00 456 Additional labor, equipment, and material s to extend 10" watermain through the intersection of Hawk St. and Taft Ave., per Invoice #2041 Lump Sum 1.00 1.00 $4,990.00 $4,990.00 ADDITIONAL WORK: C.O. # 1 (ITEMS 439 - 456) - SUB -TOTAL $27,679.00 $0.00 NET INCREASE TO: SECTION IV $27,679.00 NET INCREASE TO CONTRACT: $44,434.82 Page 3 of 3