Loading...
HomeMy WebLinkAbout11-431SEPTEMBER 27, 2011 11 -431 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 11 -04 WITH LALONDE CONTRACTORS, INC. FOR VARIOUS CONCRETE PAVING & UTILITY PROJECTS — CENTRAL CITY AREA ( +$126,525.59) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: LALONDE CONTRACTORS, INC. P.O. Box 070420 Milwaukee, WI 54307 -0420 Net Increase to contract: $126,525.59 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 315 - 0410 - 7480 -00000 Street Improvement Fund Expenditures Acct. No.317- 0410 - 7480 -03301 Special Assessments Fund — Streets Acct. No.317- 0410 - 7480 -03302 Special Assessments Fund — Sewer Acct. No.317- 0410 - 7480 -03303 Special Assessments Fund — Water Acct. No.317- 0410 - 7480 -03305 Special Assessments Fund — Storm Water Acct. No.541- 1810 - 1799 -00000 Water Utility Construction Work in Progress Acct. No.551- 1910 - 1799 -00000 Sewer Utility Construction Work in Progress Acct. No.561- 2010 - 1799 -00000 Storm Water Utility Construction Work in Progress ( 0 Of HKO H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: September 22, 2011 RE: Approval of Change Order #1 for Public Works Contract No. 11 -04 with LaLonde Contractors Inc. for Various Concrete Paving and Utility Projects — Central City Area ( +$126,525.59) BACKGROUND Change Order #1 for Contract 11 -04 is scheduled for consideration by the Common Council at the September 27, 2011 meeting. The contract was originally awarded to LaLonde Contractors Inc. in March of 2011. This change order is for additional work required to complete the project. Significant changes to the contract occurred due to multiple existing utilities creating conflicts with the proposed utilities. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Concrete Paving — A portion of Osceola Street required construction by hand vs. machine pouring. • Storm Sewer — Additional work was required to avoid existing utilities and create temporary connections. • Sanitary Sewer — Several existing facilities were encased in concrete requiring additional work to remove and dispose. • Water Main — Additional work was required to avoid existing utilities. FISCAL IMPACT Contract Section Change Order Amount CIP Budget Amount New Contract Total Concrete Paving $11,824.56 $1,897,900 $1,453,246.11 Storm Sewer $38,430.97 $2,644,000 $2,233,039.14 Sanitary Sewer $31,135.99 $1,595,300 $1,204,482.51 Water Main $45,134.07 $1,131,800 $1,087,471.05 Total $126,525.59 $7,269,000 $5,978,238.81 Adequate funds are available in the related sections of the 2011 Capital Improvement Budget. RECOMMENDATIONS I recommend approval of the Change Order #1 to Contact No. 11 -04 in the amount of +$126,525.59 to LaLonde Contractors Inc. Respectfully Submitted, Steven M. Gohde Asst. Director of Public Works SMG /tit Approved: Mark A. Rohloff City Manager I:\Enginccring \I 1 -04 Concrete Paving and Uti lines No ithcast\Proj cc l_ Information \CorrespondenceWemo \I 1 -04 CO 019 -22 -IL doc CHANGE ORDER # 1 DATED: August 12, 2011 TO: Lalonde Contractors, Inc. P.O. Box 070420 Milwaukee, WI 54307 -0420 Your present contract with the City of Oshkosh, Contract No. 11 -04 is hereby amended and changed as follows: NET INCREASE TO: SECTION I -CONCRETE PAVING $11,824.56 NET INCREASE TO: SECTION II -STORM SEWER $38,430.97 NET INCREASE TO: SECTION III - SANITARY SEWER $31,135.99 NET INCREASE TO: SECTION IV- WATER MAIN $45,134.07 NET INCREASE TO CONTRACT: $126,525.59 CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works City Clerk Approved and ac c pte Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 11 -04 CHANGE ORDER # 1 SECTION 1 - CONCRETE PAVING ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I ITEM DESCRIPTION UNIT BID INSTALLED Z NET UNIT INCREASEIN DECREASE/N NUMBER and equipment to furnish QUANTITY QUANTITIES DECREASE PRICE CONTRACT CONTRACT and install cold mix patch PRICE PRICE 10000 Additional labor, materials, and equipment to furnish and install cold mix patch in the Pearl & Osceola 20D00 intersection, due to the Each 0.00 33.00 33.00 $65.05 $2,146.65 delay in storm sewer construction, per Invoice (004) dated 4/27/11, Lump complete as specified Sum 0.00 1.00 1.00 $2,104.56 $2,104.56 10001 Additional price increase to Lump 20001 do hand work paving on Sum 0.00 1.00 1.00 $1,192.64 $1,192.64 Osceola Street due to change of width from UW- O Fiber duct package in conflict, per Invoice (030) L dated 7/11/11, complete as Square specified Yards 0.00 1,215.00 1,215.00 $8.00 $9,720.00 10002 Additional Days added to Sum 0.00 1.D0 1.00 $1,989.50 $1,989.50 the completion date due to extra work and delays Days 0.00 21.00 21.00 $0.00 $0.00 ADDITIONAL WORK: C.O. # 1 - (ITEMS 10000.10001) - SUB -TOTAL NET INCREASE TO: SECTION 1 SECTION II - STORM SEWER ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION 11 $11,824.56 $0.00 $11,824.56 I ITEM I DESCRIPTION I UNIT BID INSTALLED NET NET UNIT INCREASE IN IDECREASE1111 II I NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 2 6 Furnish, install, maintain, and remove stone bags per Invoice (003) dated 4/18/11, complete as 20D00 s ecified Additional labor, materials, Each 0.00 33.00 33.00 $65.05 $2,146.65 and equipment to core two 12 -inch holes into MH P -10 to match field conditions, per Invoice (002) dated 4/27/11, complete as Lump 20001 specified Additional labor, materials, Sum 0.00 1.00 1.00 $1,192.64 $1,192.64 and equipment to remove a poured in place concrete structure and repair the existing storm sewer L manhole on Osceola , per Invoice (006) dated 5/9/11, Lump complete as specified Sum 0.00 1.D0 1.00 $1,989.50 $1,989.50 Page 1 of 6 CONTRACT: 11 -04 CHANGE ORDER # 1 ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASEIN CONTRACT PRICE DECREASEIN CONTRACT PRICE 20002 Additional labor, materials, and equipment to excavate and re- connect to an existing storm lateral. Upon further investigation, it was determined that the lateral was never installed and the hole was backfilled with gravel, per Invoice (008) dated 5/9/11, complete as specified Lump 20003 Additional labor, materials, Sum 0.00 1.00 1.00 $2,155.35 $2,155.35 and equipment to re- install two storm inlets that were staked incorrectly, per Invoice (012) dated 5/24/11, complete as Lump 20004 specified Additional labor, materials, Sum 0.00 1.00 1.00 $1,925.57 $1,925.57 and equipment to remove an unknown buried concrete foundation and storm sewer on Osceola Street, per Invoice (014) dated 6/21/11, complete as Lump specified Sum 0.00 1.00 1.00 $1,962.36 $1,962.36 20005 Additional labor, materials, and equipment to temporarily connect to existing 42 -inch storm sewer, after the storm sewer installation was put on hold due to UW- Oshkosh fiber conflict, per Invoice (015) dated 6/21/11, complete as Lump specified Sum 0.00 1.00 1.00 $3,702.02 $3,702.02 20006 Additional labor, materials, and equipment to raise the proposed 3'x6' box culvert over the UW- Oshkosh steam tunnel that was in conflict, per Invoice (019) dated 6/21111, complete as Lump specified Sum 0.00 1.00 1.00 $5,564.85 $5,564.85 20007 Additional labor, materials, and equipment to install 48 inch storm sewer and inlets on Osceola Street that were in conflict with the UW- Oshkosh fiber duct package. Osceola was ultimately narrowed to allow inlets to be installed, per Invoice (020) dated 6/21/11, complete as Lump 20008 specified Additional labor, materials, Sum 0.00 1.00 1.00 $6,684.38 $6,684.38 and equipment to permanently connect the 3' x 6' box culvert to the existing storm sewer after the storm sewer box culvert was eliminated from the contract between station 17 +25 and 20 +00, per Invoice (022) dated 6/28/11, complete as Lump specified Sum 1 0.00 1.00 1.00 $3,292.06 $3,292.06 Page 2 of 6 CONTRACT: 11 -04 CHANGE ORDER # 1 ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE' DECREASE 1N CONTRACT PRICE 20009 Additional labor, materials, and equipment to remove 6- inches of mud from the storm sewer due to the water main break and repair the storm sewer, per Invoice (032) dated 7/15111, complete as Lump specified Sum 0.01) 1.00 1.00 $1,614.49 $1,614.49 20010 Additional labor, materials, and equipment to install a storm lateral that was not in the correct location according to the plan. Contractor had to re- excavate in new location and backfill original location, per Invoice (034) dated 7/19/11, Complete as Lump specified Sum 0.00 1.00 1.00 $820,20 $820.20 20011 Additional labor, materials, and equipment to connect the UW- Oshkosh Wellness Center storm lateral to the 3'x6' box culvert. UW -O told us that the lateral was connected to an inlet outside the building but it was determined it was connected to the abandoned storm sewer main. Contractor had to re- mobilize to that area, excavate, de- water, and re- slurry the abandond storm sewer, per Invoice (036) dated 7/29/11, complete as specified Lump Sum 0.00 1.00 1.00 $5,380.90 $5,380.90 ADDITIONAL WORK: C.O. # 1 -(ITEMS 2862 - 20011) - SUB -TOTAL $38,430.97 $0.00 NET INCREASE TO: SECTION II $38,430.97 Page 3 of 6 CONTRACT: 11 -04 CHANGE ORDER # 1 SECTION III - SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III BER P M DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NE7 INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3815 Abandon 27 -inch sanitary sewer, complete as Linear 30D00 s ecified Additional labor, materials, Feet 0.00 238.00 238.00 $13.00 $3,094.00 and equipment to move and rebuild MH 0-1, due to existing 33 -inch sanitary sewer being encased in concrete, per Invoice (001) dated 4/27/11, Complete as specified Lump 30001 Additional labor, materials, Sum 0.00 1.00 1.00 $9,260.88 $9,260.88 and equipment to core new hole into MH 0-2 to match field conditions, and cap new lateral that was shown on plans, but was abandoned, per Invoice (005) dated 5/2/11. Lump complete as specified Sum 0.00 1.00 1.00 $1,227.07 $1.227.07 30002 Additional labor, materials, and equipment to remove concrete encased manhole in front of Blackhawk Commons, per Invoice (007) dated 5/9/11, Lump complete as specified Sum 0.00 1.00 1.00 $5,725.85 $5,725.85 30003 Additional labor, materials, and equipment to break up and dispose of concrete encased sanitary/storm manhole structure that was excavated on 5 /5/11, per Invoice (010) dated 5/25111, complete as Lump 30004 specified Additional labor, materials, Sum 0.00 1.00 1.00 $1,143.68 $1,143.68 and equipment to remove a poured in place sanitary manhole on Algoma Avenue, per Invoice (024) dated 6/26111, complete as Lump 30005 specified Construction crew down Sum 0.00 1.00 1.00 $7,151.85 $7,151.85 time due to Gabe's Construction air - hammering the concrete off AT &T's duct package on Elmwood Avenue. Sewer crew could not install sanitary or storm until Gabe's was complete with their work, per Invoice (027) dated 6/28/11, Lump complete as specified Sum 0.00 1.00 1.00 $3,172.71 $3,172.71 30006 Additional labor, materials, and equipment to use a concrete buster to remove encased concrete around sanitary sewer manhole to gain access, per Invoice (028) dated 6/28/22, Lump complete as specified Sum 0.00 1.00 1.00 $359.95 $359,95 ADDITIONAL WORK: C. O. # 1 - (ITEMS 3815 - 30DD6) - SUB -TOTAL $31,135.99 $0.D0 NET INCREASE TO: SECTION III $31,135.99 Page 4 of 6 CONTRACT: 11 -04 CHANGE ORDER # 1 SECTION IV - WATER MAIN ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV kIT EMBID DESCRIPTION UNIT INSTALLED NINCREASE IN DECREASE MBER and equipment to move QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT and install new 12 -inch PRICE PRICE 40000 Additional labor, materials, and equipment to move and install new 12 -inch water main to match the field conditions and avoid conflicts with the proposed sanitary and storm sewer and the existing 20 -inch watermain, per Invoice (011) dated 5/24/11, Lump complete as specified Sum 0.00 1.00 1.00 $11,588.B1 $11,588.81 40001 Additional cost for installing Megalugs on all bends and fittings, per Invoive (013) dated 6121/11, complete as specified Lump Sum 0.00 1.00 1.00 $17,914.70 $17,914.70 40002 Additional labor, materials, and equipment to remove fittings for tee and valve on Elmwood Avenue at Woodland Avenue, once it was determined that there was a conflict with re- routed sanitary sewer, per Invoice (1) 16) dated 6/21/11, complete as Lump specified Sum 0.00 1.00 1.00 $1,247.18 $1,247.18 40003 Additional labor, materials, and equipment to offset proposed water main on Elmwood Avneue at Woodland Avenue over the exisitng storm that was in conflict, per Invoice (0 17) dated 6/21111, Lump complete as specified Sum 0.00 1.00 1.00 $1,870.76 $1,870.76 40004 Additional labor, materials, and equipment to offset proposed water main on Elmwood Avenue at Vine Avenue under the existing storm sewer that was in conflict, per Invoice (017) dated 6/21/11, complete as Lump specified Sum 0.00 1.00 1.00 $1,364.91 $1,364.91 40005 Additional labor, materials, and equipment to re- install watermain that was in conflict with the UW- Oshkosh fiber duct package on Elmwood Avenue between Amherst Avenue and Irving Avenue, per Invoice (023) dated 6/28/11, complete as Lump specified I Sum 0.00 1.00 1.00 $7,133.81 $7,133.81 Page 5 of 6 CONTRACT: 11.04 CHANGE ORDER # 1 ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE /NCREASEIN CONTRACT PRICE DECREASE/N CONTRACT PRICE 40006 Additional labor, materials, and equipment to install a temporary water service to the UW- Oshkosh Diversity Center. Contractor was told that the existing water Service was tapped off the 6 -inch fire protection lateral and 4 -inch water lateral was abandoned. It was determined that the 2 -inch service was connected to the 4 -inch lateral, per Invoice (025) dated 6/28/11, complete as Lump 40007 specified Additional labor, materials, Sum 0.00 1.00 1.00 $1,289.87 $1,289.87 and equipment to repair a watermain that was improperly marked by the utility locator, per Invoice (03 1) dated 7/15/11. Lump 40008 complete as specified Additional labor, materials, Sum 0.00 1.00 1.00 $619.67 $619.67 and equipment to repair a unmarked watermain on Irving Avenue, per Invoice (026), dated 6/28/11, Lump complete as specified Sum 0.00 1.00 1.00 $739.63 40009 Additional labor, materials, $739.63 and equipment to repair a watermain leak on Elmwood Avenue, per Invoice (033), dated 7119/11, complete as Lump specified Sum 0.00 1.00 1.00 $1,364.73 $1,364.73 ADDITIONAL WORK: C.O. # 1 (ITEMS 40000 - 40009) - SUB -TOTAL $45,134.07 $0.00 NET INCREASE TO: SECTION IV $45,134.07 NET INCREASE TO SECTIONS I, II, III, IV $126,525.59 NET DECREASE TO SECTIONS I, il, III, IV $0.00 NET INCREASE TO CONTRACT: $126,525.59 Page 6 of 6