Loading...
HomeMy WebLinkAbout2011-Building (ramp & stairs) (a) CITY OF OSHKOSH No 146991 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1542 REPP AVE Owner ELIZABETH A CARPENTER Create Date 07/27/2011 Designer Contractor READY BUILDERS INC Inspector Category 142 - Decks, Patios, Ramps Plan Type 0 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection Finished /Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature SFR/ Ramp & Stairs* to be constructed along the front and side of the house. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,998.00 Plan Approval $0.00 Permit Fee Paid $85.00 Park Dedication $0.00 Issued By: Date 07/27/2011 Final /O.P. 00 /00 /0000 ❑ Permit Voided Parcel Id # 1601330400 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no - uthority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit applic. 1,.n within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any : ssary approvals • -fore starting such activity. I have read and understa j�> ' , o ,- do' -d ' form. ; on. Signature X _ ,, i OP ► / Date 3e/7a//'/' Agent/Owner Address E2734 HOBSON AD WAUPACA WI 54981 - 9426 Telephone Number 715 - 258 -5688, home I' To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.