HomeMy WebLinkAbout146636-Building (replace concrete floor) CITY OF OSHKOSH No 146636
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 2737 HARRISON ST Owner OSHKOSH CORPORATION Create Date 06/23/2011
Designer Contractor B P BAKER CONSTRUCTION INC
Inspector Brian Noe
Category 211 - Alteration Industrial Plan No Formal Rev
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished /Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature 1IND/ Remove and replace concrete floor for tack system and concstruct pits per plans in FMTV
of Work assembly area North end of building East of locker room.
O.K. to issue --
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $32,000.0 P1 n Approval $0.00 Permit Fee Paid $184.00 Park Dedication $0.00
Issued By: Jg/ /Ad Date 07/01/2011 Final /O.P. 00 /00 /0000
❑ Permit Voided Parcel Id # 1519600000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to s re y necessa royals before starting such activity.
I have read and d nd the of e nti d information.
Signature %/ Date
Agent/Owner
Address 5524 ZOAR RD PICKETT WI 54964 - 0000 Telephone Number 920 - 589 -5750
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.