HomeMy WebLinkAbout0146179-Building (elevator) CITY OF OSHKOSH No 146179
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 2875 ATLAS AVE Owner 4IMPRINT INC Create Date 05/17/2011
Designer Schindler Contractor C.D. SMITH
Inspector Brian Noe
Category 223 - Alteration Offices, Banks, Professional Plan No Formal Rev
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const:
Size
Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished /Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use /Nature Construction of elevator per plans submitted
of Work
O.K. to issue
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $72,000.00 Plan Approval $0.00 Permit Fee Paid $304.00 Park Dedication $0.00
Issued By:
Date 06/03/2011 Final/O.P. 00/00/0000
❑ Permit Voided Parcel Id # 1329200400
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read and nders nd the m ntioned inf ation�
Signature � Date 6 (3 t. l
ttt Agent/Owner
Address PO BOX 1006 FOND DU LAC WI 54936 - 1006 Telephone Number 924 -2900
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.