Loading...
HomeMy WebLinkAbout11-154APRIL 12, 2011 (CARRIED 6 -0 PURPOSE: INITIATED BY: 1§11M R511 RESOLUTION LOST LAID OVER WITHDRAWN ) APPROVE AMENDMENT TO TESTING AGREEMENT WITH BADGER LABORATORIES & ENGINEERING PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached Amendment to Testing Agreement for analysis work for the City's pretreatment program is hereby approved and the proper City officials are hereby authorized to execute and deliver the Amendment to Testing Agreement in substantially the same form as attached hereto, any changes in the execution copy being deemed approved by their respective signatures, and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the Agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 551 - 1955 - 6401 -00000 — Sewer Utility — Pretreatment Professional Services OJHKO H ON THE WATER MEMORANDUM TO: FROM DATE: RE: Honorable Mayor and Members of the Common Council Stephan M. Brand, Utilities Superintendent April 7, 2011 Amendment to Contract 06 -07 Sampling and Analysis of Industrial Wastewater by Badger Laboratories and Engineering, BACKGROUND Badger Laboratories was awarded Contract No. 06 -07 to provide industrial wastewater discharge sampling and analysis in April 2006. The Wisconsin Department of Natural Resources requires that discharges from industry to the public sanitary sewers be monitored to prevent the discharge of wastes that can interfere with treatment processes at the wastewater treatment plant. The costs of the program are billed to the local industries for the required sampling and testing. Badger Laboratories is requesting a one year extension on the current contract. ANALYSIS This is a unit price contract based on the test and sampling requirements which are unique to each industry. The industry is charged only for the individual sampling and tests that are required. In 2009 there was no increase in cost proposed. In 2010 a 2% increase was approved. The pricing will remain at the 2010 levels for the proposed contract extension for 2011. FISCAL IMPACT There is no increase in cost included in the contract extension. The pricing will be the same as in 2010. RECOMMENDATIONS I recommend approval of the extension of Contract 06 -07 for one year with Badger Laboratories and Engineering Inc. Respectfully Submitted, Approved: p Stephan M. Brand Utilities Superintendent City Manager - BADGER LABORATORIES & ENGINEERING INC. ENGINEERS 501 WEST BELL ST=;EE T NEENAH, VVISCONSIN 54956 -4868 • EST. 1 9GE (9201729-1 100 FAX [920) 729 -4945 • 1-900-778-719e March 14, 2011 Steve Brand, Utilities Supt. City of Oshkosh WWTP 233 N. Campbell Rd. Oshkosh, WI 54902 RE. Industrial Wastewater Contract 06 -07 Extension for 2011 -2012 Dear Steve: This letter is to confirm our recent phone conversation regarding the contract referenced above. Badger Laboratories & Engineering, Inc. would agree to a one -year extension and would maintain all pricing from our current contract. Also we will plan on talking with you early in 2012 about a future arrangement. I am enclosing a price sheet that will confirm the unit prices in effect for the 4/l/11-3/31/12 term. We appreciate the City's business on this contract and hope that this agreement will work for you. Please call me with any questions, clarifications, or additional materials needed. Sincerely, Richard Larson, Pres. Badger Laboratories & Engineering, Inc. 501 W. Bell St. Neenah, WI 54956 Tel 920 - 729 -1100 State Certified Lab # 445023150 Encl. Members W1 CNR Certified Lab #445023150 WI Environmental Laos; Am. Chemical Soc.; WI Reg. Engineers (Corp.) #CE00601 T.A.P.P.7.; WI Food Processors Assn.; WI DATCP Certified #205 (Bacteria - Water) Wisc. Paper Council AMENDMENT TO TESTING AGREEMENT WHEREAS, the Common Council for the City of Oshkosh at their meeting on April 12, 2011, Resolution #11 -154, authorized and directed the proper City Officials to enter into an appropriate agreement and extensions thereto with Badger Laboratories & Engineering for sampling and analysis work for the City's pretreatment program; and WHEREAS, Badger Laboratories has requested renewal of the agreement for a period of one year, with no increase in price per the attached Exhibit A.; and WHEREAS, it is financially advantageous to the City of Oshkosh to extend the agreement on those terms. NOW, THEREFORE, IT IS AGREED by and between the parties that the Agreement between these parties is hereby amended as follows: 1. That the term of the Agreement shall be amended to end on March 31, 2012. 2. That in accordance with the previous agreement and amendments thereto, the costs for all unit prices shall be amended as per the attached Exhibit A. 3. That all rights and responsibilities under the original Agreement and amendments thereto between these parties not specifically amended by this amendment shall remain in effect. IN WITNESS WHEREOF, the parties heretofore have caused this Amendment to be signed by the proper persons of each party and their corporate seals, if any, to be hereunto affixed. Dated: April 13, 2011. BADGER LABORATORIES & ENGINEERING 0 Richard O. Larson, Vice President CITY OF OSHKOSH By: And: Mark A. Rohloff City Manager Pamela R. Ubrig, City Clerk Approved as to Form and Execution: Lynn A. Lorenson, City Attorney Attached: Exhibit A — List of prices EXHIBIT A CONTRACT YEAR 4/1/11 — 3/31/12 INDICATE UNIT PRICE FOR EACH PARAMETER LISTED WITH A UNIT REPRESENTING ONE SAMPLE EVENT COST FOR ANALYSIS AND COLLECTION 1. Laboratory analysis, sample retainage or disposal, analysis report transmittal, sample report chain -of- custody documentation and bench sheets complete as specified for the following: PARAMETERS PER EVENT PARAMETER CHARGE a. 'DOD, SS, Phos. a. 23.00 b. Ammonia- Nitrogen b. 10.00 C. COD C. 15.00 d. CdM d. 8.00 C. Cr(i) C. 8.00 f CUM f. 8.00 9- Pb(T) g. 8.00 h. Mo(T) h. 8.00 L Ni(T) I. 8.00 J' Zn(I) 7• 8.00 IL Hg(r) k. 17.00 l' Ag(T) L - Coo m pH M. 4.00 n• .Cyanide n. 21.00 o• `VOC's o. _ 80.00 p• PAH'S P. 40.00 Q• BETX (NR215.03) q. 50.00 r• Oil & Grease r. 27.00 S. Sulfate S. 9.00 t. Chloride t. 4.00 U. Chlorine U. 35.00 V. Record flow (GPD) ** V. NC w PCB'S w 100.00 *' * Collecthandlestore & document x Grab samples x 21.00 ** * For portable equipment sites collecthandle,store & document y 24hr. Composite FP samples y 13 8.00 * ** For dedicated equipment sites collect,handlestore & document z 24hr. Composite FP samples y 12 . 0 0 ** (Provide flow / sample chart) * ** Confined Space Entry obligation of contractor