HomeMy WebLinkAbout0145390-Building (fence) 'C_r CITY OF OSHKOSH Ai F 145390
0
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD -82011
ON THE WATER
Or
Job Address 2021 MOUNT VERNON ST Owner MICHAEL A NIGL Create Date 04/08/2011
Designer Contractor RAMMER FENCE
Category 251 - Fences Plan
Type O Building O Sign 0 Canopy • Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection I
Finished /Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation 0 Poured Concrete 0 Floating Slab O Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature SFR / INSTALL 173' OF 6' HIGH CEDAR FENCE IN REAR YARD
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $4,980.00 Plan Approval $0.00 Permit Fee Paid $53.00 Park Dedication $0.00
Issued By:n Date 04/08/2011 Final /O.P. 00 /00 /0000
❑ Permit Voided I Parcel Id # 1515390000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read and unders he mentioned information.
Signature l ---- ,��� l� �
Date `
Agent/Owner
Address 1955 STILLMAN DR OSHKOSH WI 54901 - 1009 Telephone Number 233 -2444
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
w
S 1 1,h 1 h!
d
n
r
1 al `10.1111 C
pq Ii 1
11 iiiii 54.61 54.6
Y �
4 .6
54 54.6
IV
J "
. 0
'.:
f
1c ,..
c � � W
l { i 1
3 s 3r k P1 <
1
f i
't:
if
ik.. Vii'
` Z
m - - ■
M1 x,;51 a� m er r eetce���c
Imo it
lig I :r
1 i 3 o k 4' L; Ca&r et Ace___C‘A re--el-r: 4 .4.1 , -.314L_________
E d Z8EE ' °N Aapwoa ysmso to Ali ° WdLE:Z 1.1.07, '2 'AV