HomeMy WebLinkAbout0145241-Building (kitchen & 2nd flr bathroom remodel) I CITY OF OSHKOSH No 145241
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 216 W 12TH AVE Owner JEREMIAH J SCHWERSENSKA Create Date 03/18/2011
Designer Contractor OWNER
Category * 140 - Interior Remodeling Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished /Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation 0 Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature SFR/ LATE PERMIT/ Kitchen Remodel, 2nd Floor Bathroom Remodel, Rear Landing & Steps *Remodeled the kichen to include new
of Work cabinets and countertops (no walls were opened), remodeled the second floor bathroom to include new cabinets and countertops (no
walls opened) and the installation of a landing and steps off the rear exit door. This work was in addition to the permit for the stairway to
the 2nd floor.
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $8,500.00 Plan Approval $0.00 Permit Fee Paid $42.00 Park Dedication $0.00
Issued By: ?J v Date 03/23/2011 Final /O.P. 00 /00 /0000
❑ Permit Voided Parcel Id # 0901230000
Cautionary Statement to Owners Obtaining Building Permits
101.65(1r) of the Wisconsin Statutes requires municipalities that enforce the Uniform Dwelling Code to provide an owner who applies for a
building permit with a statement advising the owner that:
If the owner hires a contractor to perform work under the building permit and the contractor is not bonded or insured as required under
s. 101.654 (2) (a), the following consequences might occur:
(a) The Owner may be held liable for any bodily injury to or death of others or for any damage to the property of others that arises out of
the work performed under the building permit or that is caused by any negligence by the contractor that occurs in connection with the
work performed under the building permit.
(b) The Owner may not be able to collect from the contractor damages for any loss sustained by the owner because of a violation by the
contractor of the one and two family dwelling code or an ordinance enacted under sub. (1) (a), because of any bodily injury to or
death of others or damage to the property of others that arise out of the work performed under the building permit or because of any
bodily injury to or death of others of damage to the property of others that is caused by any negligence by the contractor that occurs
in connection with the work performed under the building permit.
* 140 - Interior Remodeling See Chapter NR 447 of the Wisconsin Administrative Code and Notification Form 4500 -113 on the DNR Asbestos Program
website; http: / /dnr.wi.gov /air /compenf /asbestos /. For additional information on hazards present in buildings see the Pre- Demolition Environmental
Checklist at http: / /dnr.wi.gov /org /aw /wm /publications /anewpub /WA651.pdf
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit pplication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur ny necessary approvals before starting such activity.
I have read and and , t d ''e orementioned information.
Signature Date 33
Agent/Owner
Address Op,
W 12TH AVE OSHKOSH WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.