HomeMy WebLinkAbout0145226-Plumibng (renew #133448) CITY OF OSHKOSH No 145226
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1727 ELMWOOD AVE Owner AARON E DROESSLER/RONALD C WIEGMAN Create Date 02/14/2011
Contractor BARTELT PLUMBING Category 413 - Res - Interior (Replacement Fixtures) Plan
Bathtub 1 Clothes Wshr 1 Classrm Sink Surgeons Sink Roof Drain Deduct Meters
Shower 1 Lndry Tray 1 Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs
Whirlpool Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs
Lavatory 2 San Sump /Pump FIr/Wst Sink Bidet Site Drain Misc.
Toilet 2 Water Softner Hand Sink Urinal Wait. St. Fixtures
Kit Sink 1 Standp Rec 1 Lab Sink Beer Tap Ice Chest
Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker
..... _.. -_ .
Dishwasher 1 Local Waste Sculry Sink Drink Ftn _ Int Grease Trap
Floor Drain 0 Bar Sink Sery Sink Wash Ftn Ext Grease Trap
Hose Bibb 1 Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn
Water Heater
Use /Nature SFR\ Renewal of permit 133448 to final out the project
of Work . -,
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1200670000
Valuation $5,000.00 Plan Approval $0.00 Permit Fees $84.00 ! Permit Voided
Issued By z, Date 03/22/2011
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to an r cessary approvals before such activity.
Signature � ,04 c.., ,
Date "3/4
Agent/Owner
Address 2659 YORKTON PL Oshkosh WI 54904 - 0000 Telephone Number 233 -1670
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may •
continue if the inspection is not performed within two business days from the time the project is ready.
"1"
D
R AWL,"
1110110" I 7_ 4.....7-1,.rnaMe, APR 1 8 2011
AL14 or
OSHKOSH WATER CALCULATION WORKSHEET
ON THE WATER coMML;N 1 v DE\lanr'MENT
INSPEC - ;"Vi: rWASION
INFORMATION REQUIRED TO CALCULATE WATER SERVICE SIZE
1. Demand of building in gallons per minutes. (GPM)
2. Difference in elevation from main or external pressure tank to building control valve. (feet) 6
3. Size of water meter (when meter is required 5/8" , 3/4" ix- 1" • 1/2" • 2" larger size 5:183
4. Developed length from main or external pressure tank to building control valve. (feet) 50
5. Low pressure at main in street or external pressure tank. (Psi)
CALCULATE WATER SERVICE PRESSURE LOSS
6. Low pressure at main in street or external pressure-tank/ (value of #5 above) C
7. Determine pressure loss due to friction in 3 A-1, inch diameter water service . Subtract value of "7" S■
subtotal
8. Determine pressure loss due to elevation,
(multiply the value of #2 above by .434) Subtract value of "8" 1 ee 0
9. Available pressure after the bldg. Control valve. (enter in "B” below) subtotal 53 90
CALCULATE THE PRESSURE AVAILABLE FOR UNIFORM LOSS (VALUE OF "A")
B. Available pressure after the bldg. Control valve. (from "9" above) Value of lit" 1- 1&90
C. Pressure loss of water meter (when meter is required) Subtract value of "C" 50
subtotal L 12.•40
D. Pressure at controlling fixture. Subtract value of 1r 70 0
subtotal ( '40
E. Difference In elevation between the building control valve
and the controlling fixture in feet 11 X .434 psVlt. Subtract value of "E" t 2.5
subtotal L112.0
F. Pressure loss due to water treatment devices, instantaneous
water heaters and backflow preventers which serve the
controlling rectum. Subtract value of "F" 0
subtotal
G. Developed length from building control valve to controlling
fixture in feet 9s" X 1.5 Divide by value of "G"
subtotal .112_
Multiply by 100
A. Pressure available for uniform loss 1 12-