HomeMy WebLinkAbout11-116MARCH 22, 2011 11 -116 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT NO. 10 -07 WITH CARL BOWERS & SONS CONSTRUCTION CO. FOR VARIOUS CONCRETE PAVING & UTILITY PROJECTS — NORTHEAST SIDE PAVING PROJECT (- $70,110.95) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: CARL BOWERS & SONS CONSTRUCTION CO. N1844 Maloney Rd. Kaukauna, WI 54130 Net Decrease to contract: (- $70,110.95) PURPOSE: See attached Change Order. ( 0 OHKOH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: March 17, 2011 RE: Change Order #2 for Public Works Contract No. 10 -07; with Carl Bowers & Sons Construction Co. for Concrete Paving & Utilities — Northeast Paving Project ( -$70 ,110.95) BACKGROUND Change Order #2 for Contract 10 -07 is scheduled for consideration by the Common Council at the March 22, 2011 meeting. The contract was originally awarded to Carl Bowers & Sons Construction Co. Inc. in June of 2010. This change order is to finalize all quantities ANALYSIS Following is a summary of the significant changes items performed for each section of the CIP. -Storm Sewer additional labor and materials to avoid conflicts with gas mains, WPS crews, telephone duct package and water main. - Sanitary Sewer included additional labor and materials for a drop manhole. -Water Main included labor and materials to needed due to a failed water valve outside of the project limits. FISCAL IMPACT Contract Section Change Order Amount CIP Budget Amount New Contract Total Street/Sidewalk - $2,542.88 $1,916,000 $1,199,481.17 Storm Sewer - $33,088.27 $1,013,400 $1,011,075.73 Sanitary Sewer - $33,749.80 $983,500 $623,096.20 Water Main - $730.00 $1,457,300 $825,500 Total - $70,110.95 $5,370,200 $3,658,653.10 Adequate funds are available in the Capital Improvement Program Budget. RECOMMENDATIONS I recommend approval of the Change Order #2 to Contact No. 10 -07 in the amount of - $70,110.95 to Carl Bowers & Sons Construction Co. Inc. Respectfully Submitted, Approved: j A'�4j_14& Steven M. Gohde Asst. Director of Public Works City Manager 1:\Engineering \10 -07 Concrete Paving - NORTHEAST\Project_ Information \Correspondence\Memo \CO #2 exp 10- 07.doc CHANGE ORDER # 2 DATED: March 3, 2011 TO: Carl Bowers Construction Co. N1844 Maloney Rd. Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No and changed as follows: NET DECREASE TO: SECTION I - CONCRETE PAVING NET DECREASE TO: SECTION II - STORM SEWER NET DECREASE TO: SECTION III - SANITARY SEWER NET DECREASE TO: SECTION IV - WATER MAIN NET DECREASE TO CONTRACT: Recommended: Director of Public Works C3'il 10 -07 , is hereby amended ($2,542.88) ($33,088.27) ($33,749.80) ($730.00) ($70,110.95) CITY OF OSHKOSH City Manager City Clerk Approved and accepted: r Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 10 -07 CHANGE ORDER # 2 SECTION 1 - CONCRETE PAVING ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER complete ass ecified Yards QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 101 Sidewalk and driveway PRICE PRICE 100 Pavement removal, Square complete ass ecified Yards 5,165 5,335.40 170.40 $1.28 $218.11 101 Sidewalk and driveway removal, complete as Square specified Feet 36,850 42,230.30 5,380.30 $0.50 $2,690.15 102 Excavation, complete as Cubic . Specified Yards 12,620 12,133.40 - 486.60 $9.92 ($4,827.07) 103 7" Non - reinforced concrete pavement, including integral curb, 5" base material and grading, complete as specified Square Yards 23,340 23,122.60 - 217.40 $27.86 1 ($6,056.76) 104 8" Concrete pavement, HES, including integral curb and 6" base material and grading, complete as Square specified Yards 730 918.70 188.70 $41.20 $7,774.44 105 12" Wide radius curb head, complete as specified Linear Feet 790 780.40 -9.60 $6.00 ($57.60) 106 Standard 30" curb &gutter, 7" (tie -in), complete as Linear specified Feet 565 641.80 76.80 $20.00 $1,536.00 107 Sidewalk curb, complete as Linear specified Feet 200 33.90 - 166.10 $25.00 ($4,152.50) 108 4" Concrete sidewalk, Square complete asspecified Feet 12,960 18,849.50 5,889.50 $3.10 $18,257.45 109 6" Concrete sidewalk & driveway, complete as Square specified Feet 32,065 31,072.40 - 992.60 $3.25 ($3,225.95) 110 3'/" Asphaltic concrete driveway, complete as Square specified Yard 122 147.80 25,80 $37.00 $954.60 111 3'/2' Asphaltic concrete transition, with base, Square complete asspecified Yard 2,230 1 2,432.30 202.30 $23.00 $4,652.90 112 Furnish and install crushed stone base course, complete as specified Tons 4,850 0.00 - 4,850.00 $6.50 ($31,525.00) 113 Furnish CABC and construct 1 -foot wide gravel shoulder, complete as Linear specified Feet 310 257.20 -52.80 $3.50 ($184.80) 114 Sawing, complete as Linear specified Feet 2,170 1,742.10 - 427.90 $1.50 ($641.85) 115 Furnish and install pavement ties (epoxy coated), complete as s ecified Each 220 262.00 42,00 $7.00 $294.00 116 Adjust manholes and inlets, complete as specified Each 172 172.00 $235.00 Page 1 of 10 CONTRACT: 10 -07 CHANGE ORDER # 2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COSTPER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 117 Furnish and install No. 4 reinforcing bars (epoxy coated), complete as Linear specified Feet 300 690.00 390.00 $1.00 $390.00 118 Remove stump, complete inch asspecified Diameter 1 26 60.00 34.00 $15.00 $510.00 119 Remove trees and stumps, complete as specified inch Diameter 40 30.00 -10.00 $15.00 ($150.00) 120 Furnish and install trees, complete asspecified Each 3 2.00 -1.00 $250.00 ($250.00) 121 Provide and install metal detectable warning plates, complete as specified Square Feet 352 1 384.00 32.00 $28.00 $896.00 122 Terrace work on Central Street; complete as Lump specified Sum 1 1.00 $3,800.00 123 Terrace work on Frankfort Street, complete as Lump specified Sum 1 1.00 $5,100.00 124 Terrace work on Harney Avenue, complete as Lump specified Sum 1 1.00 $14,700.00 125 Terrace work on Merrill Street, complete as Lump specified Sum 1 1 1.00 $3,600.00 126 Terrace work on old RR ROW (Prospect to Scott including Scott ROW), Lump complete asspecified Sum 1 1.00 $8,200.00 127 Terrace work on Prospect Avenue, complete as Lump specified Sum 1 1.00 $10,000.00 128 Terrace work on Saratoga Avenue, complete as Lump specified Sum 1 1.00 $2,800.00 129 Terrace work on Shorelane Street, complete as Lump ,specified Sum 1 1.00 $3,200.00 130 Furnish and install cold weather covering, 1 -layer visquine, complete as Square specified Yards 3,500 1,008.80 - 2,491.20 $0.01 ($24.91) 131 Furnish and install cold weather covering, 2 -layer visquine, complete as Square specified Yards 4,090 0.00 - 4,090.00 $0.01 ($40.90) 132 Furnish and install cold weather covering, 2 -layer visquine and 6" hay, Square complete asspecified Yards 4,090 0.00 - 4,090.00 $0.01 ($40.90) 133 Excavation, special, complete asspecified Tons 1000 362.69 - 637.31 $9.00 ($5,735.79) SECTION I - (BID ITEMS 100 - 133) - SUB - TOTALS $38,173.65 ($56,914.03) Page 2 of 10 CONTRACT: 10 -07 CHANGE ORDER # 2 ITEM Extra work - 42" Concrete CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT widening (handwork), Foot 0.00 137.00 137.00 -74.50 $25.50 PRICE PRICE ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION I ITEM Extra work - 42" Concrete CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT widening (handwork), Foot 0.00 137.00 137.00 -74.50 $25.50 PRICE PRICE 134 Extra work - 42" Concrete CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER curb & guter and curb Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT widening (handwork), Foot 0.00 137.00 137.00 -74.50 $25.50 $3,493.50 PRICE 135 Extra work - 7" concrete pavement for angle parking by Stephens Park, Square complete as specified Yard 0.00 285.00 285.00 -0.48 $35.50 $10,117.50 ($20.64) 136 Furnish and install dowel bars, complete as specified Linear specified Each 0.00 16.00 16.00 - 138.10 $13.00 $208.00 ($5,800.20) 137 Furnish and install 1 foot mill and overlay, complete Lump asspecified Sum 0.00 1.00 1.00 $2,378.50 $2,378.50 ADDITIONAL WORK: C.O. 02 -(ITEMS 134-137) - SUB -TOTAL $16,197.50 $0.00 NET DECREASE TO: SECTION 1 ($2,542.88) SECTION II - STORM SEWER ITEM Furnish and install 12" CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT specified Feet 1,168 1,093.50 -74.50 $41.00 PRICE PRICE 200 Furnish and install 12" Storm Sewer, complete as Linear specified Feet 1,168 1,093.50 -74.50 $41.00 ($3,054.50) 201 Furnish and install 12" RCP Class III Storm Sewer, complete as specified Linear Feet 43 42.52 -0.48 $43.00 ($20.64) 202 Furnish and install 15" Storm Sewer, complete as Linear specified Feet 2,314 2,175.90 - 138.10 $42.00 ($5,800.20) 203 Furnish and install 15" RCP Class III Storm Sewer, complete as specified Linear Feet 273 272.35 - 0.65 $44.00 ($28.60) 204 Furnish and install 18" Storm Sewer, complete as Linear specified Feet 845 823.86 -21.14 $46.00 ($972.44) 205 Furnish and install 21" Storm Sewer, complete as Linear specified Feet 213 212.60 -0.40 $48.00 ($19.20) Page 3 of 10 CONTRACT: 10 -07 CHANGE ORDER # 2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 206 Furnish and install 24" Storm Sewer, complete as Linear specified Feet 2,041 1,892.33 - 148.67 $50.00 ($7,433.50) 207 Furnish and install 30" Storm Sewer, complete as Linear specified Feet 584 565.66 -18.34 $65.00 ($1,192.10) 208 Furnish and install 30" RCP Class III Storm Sewer, complete as specified Linear Feet 50 46.03 -3.97 $65.00 ($258.05) 209 Furnish and install 29" x 45" RCP Class III Storm Sewer, complete as Linear specified Feet 173 162.61 -10.39 $90.00 ($935.10) 210 Furnish and install 38" x 60" RCP Class III Storm Sewer, complete as Linear specified Feet 223 218.90 -4.10 $147.00 ($602.70) 211 Furnish and install 48" x 76" RCP Class III Storm Sewer, complete as Linear specified Feet 1,159 1,095.25 -63.75 $170.00 ($10,837.50) 212 Furnish and install 30" RCP Class III Apron Endwall with joint ties, complete as specified Each 1 1.00 $800.00 213 Furnish and install Std. Inlets (Type 3 with 18" sump) with castings, complete asspecified Each 83 81.00 -2.00 $1,200.00 ($2,400.00) 214 Furnish and install Std. Storm Manhole (4' Inside Diameter) in various locations without casting, Vertical complete asspecified Feet 149 180.88 31.88 $280.00 $8,926.40 215 Furnish and install Std. Storm Manhole (5' Inside Diameter) in various locations without casting, Vertical complete ass ecified Feet 25 26.27 1.27 $400.00 $508.00 216 Furnish and install Std. Storm Manhole (7' Inside Diameter) in various locations without casting, Vertical . Complete asspecified Feet 5 5.34 0.34 $800.00 $272.00 217 Furnish and install Std. Storm Box Manhole (7'x 7') in various locations without casting, complete Vertical asspecified Feet 5 4.74 -0.26 $800.00 ($208.00) 218 Furnish and install Std. Storm Box Manhole (8'x 8') in various locations without casting, complete Vertical asspecified Feet 59 61.21 2.21 $900.00 $1,989.00 Page 4 of 10 CONTRACT: 10 -07 CHANGE ORDER # 2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 219 Furnish and install Std. UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT Storm Manhole (5' Inside PRICE PRICE Diameter) in various locations with casting, Vertical complete asspecified Feet 4 2.65 -1.35 $500.00 ($675.00) 220 Furnish and install 6" Storm Lateral, complete as Linear specified Feet 5,050 4,766.50 - 283.50 $29.00 ($8,221.50) 221 Furnish and install storm lateral marker balls, complete asspecified Each 354 358.00 4.00 $19.00 $76.00 222 Abandon lineal feet of 8" - 12" storm sewer, complete Linear asspecified Feet 2,724 2,724.00 $10.00 223 Abandon lineal feet of 15" and larger storm sewer, Linear complete asspecified Feet 766 766.00 $10.00 224 Abandon Inlets or Manholes, complete as specified Each 37 37.00 $250.00 225 Furnish, install, and maintain Type "D" Inlet Protection Std., complete asspecified Each 224 2D0.00 -24.00 $80.00 ($1,920.00) 226 Furnish, install, and maintain silt fence, Linear complete asspecified Feet 140 0.00 - 140.00 $4.00 ($560.00) 227 Furnish, install, and maintain stone bags, com fete asspecified Each 10 0.00 -10.00 $12.00 ($120.00) 228 Furnish, install, and maintain sediment logs, Linear complete asspecified Feet 53 0.00 -53.00 $12.00 ($636.00) SECTION 11 - (BID ITEMS 200 - 228) - SUB - TOTALS $11,771.40 ($45,895.03) ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION 11 240 Furnish and install steel plate on storm manhole due to shallow depth of Lump manhole Sum 0.00 1.00 1.00 $1,035.36 $1,035.36 ADDITIONAL WORK: C.O. # 2 - (ITEMS 240) - SUB -TOTAL $1,035.36 $0.00 NET DECREASE TO: SECTION II ($33,088.27) Page 5 of 10 INCREASE 1N DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 240 Furnish and install steel plate on storm manhole due to shallow depth of Lump manhole Sum 0.00 1.00 1.00 $1,035.36 $1,035.36 ADDITIONAL WORK: C.O. # 2 - (ITEMS 240) - SUB -TOTAL $1,035.36 $0.00 NET DECREASE TO: SECTION II ($33,088.27) Page 5 of 10 CONTRACT: 10 -07 CHANGE ORDER # 2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER sanitary sewer (relay), Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT complete as specified Feet 6,100 6,054.10 -45.90 $54.00 PRICE PRICE SECTION III - SANITARY SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE 1N DECREASE 1N NUMBER sanitary sewer (relay), Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT complete as specified Feet 6,100 6,054.10 -45.90 $54.00 PRICE PRICE 300 Furnish and install 8" sanitary sewer (relay), Linear complete as specified Feet 6,100 6,054.10 -45.90 $54.00 ($2,478.60) 301 Furnish and install 12" sanitary sewer (relay), Linear , complete asspecified Feet 340 338.20 -1.80 $59.00 ($106.20) 302 Furnish and install std. sanitary manhole (4' inside diameter) in various locations, complete as specified, without casting Vertical Feet 270 253.86 -16.14 $175.00 ($2,824.50) 303 Furnish and install 8" x 4" factory wyes or tees, complete asspecified Each 2 3.00 1.00 $70.00 $70.00 304 Furnish and install 8" x 6" Factory Wyes or Tees Linear complete asspecified Feet 181 167.00 -14.00 $80.00 ($1,120.00) 305 Furnish and install new 4" sanitary laterals, complete Linear asspecified Feet 60 59.50 -0.50 $47.00 1 ($23.50) 306 Furnish and install 4 " /6" sanitary lateral relay, Linear complete asspecified Feet 4,820 4,198.00 - 622.00 $45.00 ($27,990.00) 307 Furnish and install sanitary lateral marker balls, complete as specified Each 369 361.00 -8.00 $19.00 ($152.00) 308 Furnish and install connections of new sanitary main to existing sanitary main (various locations and sizes), complete asspecified Each 11 11.00 $400.00 309 Core into existing manhole, complete as specified Each 1 0.00 -1.00 $700.00 ($700.00) 310 Abandon sanitary manholes at various locations, complete as specified Each 3 3.00 $365.00 311 Abandon 8" sanitary sewer at various locations, complete as specified Linear Feet 60 60.00 $3.00 312 Abandon 10" sanitary sewer at various locations, complete as specified Linear Feet 300 300.00 $3.00 Page 6 of 10 CONTRACT: 10 -07 CHANGE ORDER # 2 ITEM Furnish and install 4" CONTRACT INSTALLED NET NET COST PER INCREASE 1N DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT NUMBER wlpoly wrap, complete as QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 313 Abandon 12" sanitary Linear PRICE PRICE sewer at various locations, Feet 35 24.00 -11.00 $90.00 ($990.00) 401 complete as specified Linear ductile iron water main Feet 60 60.00 $8.00 314 Furnish and install concrete collars, complete as Linear specified Each 1 1.00 65.00 $250.00 $4,875.00 315 Furnish and install 8" sanitary sewer drop, Vertical complete asspecified Feet 13 18.25 5.25 $300.00 $1,575.00 316 Furnish and install 18" Linear casing pipe (18' lengths), Feet 6,760 7,116.00 356.00 $57.00 $20,292.00 403 corn lete asspecified Each 2 2.00 $1,500.00 317 Furnish and install 12" x 6" Factory wyes, complete as specified I Each 10 10.00 $200.00 SECTION III - (BID ITEMS 300 - 317) - SUB - TOTALS $1,645.00 ($35,394.80) NET DECREASE TO: SECTION III ($33,749.80) SECTION IV - WATER MAIN ITEM Furnish and install 4" CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION UNIT CONTRACT CONTRACT NUMBER wlpoly wrap, complete as QUANTITIES QUANTITIES INCREASE DECREASE UNIT specified (fittings not Linear PRICE PRICE 400 Furnish and install 4" ductile iron water main wlpoly wrap, complete as specified (fittings not Linear included ) Feet 35 24.00 -11.00 $90.00 ($990.00) 401 Furnish and install 6" ductile iron water main wlpoly wrap, complete as specified (fittings not Linear included ) Feet 175 240.00 65.00 $75.00 $4,875.00 402 Furnish and install 8" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included ) Feet 6,760 7,116.00 356.00 $57.00 $20,292.00 403 Furnish and install 1" water service relay, complete as specified, not including corporation and stop box Linear Feet 4,150 4 9.00 $38.00 $342.00 404 Furnish and install new 1" water service, complete as specified, not including corporation and stop box Linear Feet 40 41.00 1.00 $41.00 $41.00 405 Furnish and install 1" corporation and stop box with stainless steel rod, complete asspecified Each 175 177.00 2.00 $275.00 $550.00 Page 7 of 10 CONTRACT: 10 -07 CHANGE ORDER # 2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 406 Furnish and install 8" x 6" tees, complete as specified Each 20 1 18.00 -2.00 $360.00 ($720.00) 407 Furnish and install 8" x 8" tees, complete as specified Each 11 8.OD -3.00 $370.00 ($1,110.00) 408 Furnish and install 8" x 8" cross, complete as specified Each 2 2.00 $350.00 409 Furnish and install 6" valves, complete as specified Each 22 19.00 -3.00 $1,050.00 ($3,150.00) 410 Furnish and install 8" valves, complete as specified Each 44 34.00 -10.00 $1,350.00 ($13,500.00) 411 Furnish and install 6" x 6" tapping valve and sleeve, complete asspecified Each 4 4.00 $2,300.00 412 Furnish and install 8" x 8" tapping valve and sleeve, complete asspecified Each 1 0.00 -1.00 $2,800.00 ($2,800.00) 413 Furnish and install 8" - 11 % degree bends, complete asspecified Each 1 2.00 1.00 $275.00 $275.00 414 Furnish and install 4" - 22 '/2 degree bends, complete asspecified Each 3 0.00 -3.00 $210.00 ($630.00) 415 Furnish and install 6" - 22 '/z degree bends, complete asspecified Each 3 0.00 -3.00 $215.00 ($645.00) 416 Furnish and install 8" - 22 '/ degree bends, complete asspecified Each 4 2.00 -2.00 $270.00 ($540.00) 417 Furnish and install 4" - 45 degree bends, complete as , specified Each 6 6.00 $210.00 418 Furnish and install 6" - 45 degree bends, complete as specified Each 6 34.00 28.00 $225.00 $6,300.00 419 Furnish and install 8" - 45 degree bends, complete as specified Each 20 28.00 8.00 $270.00 $2,160.00 420 Furnish and install 8" x 4° reducer, complete as specified Each 2 2.00 $225.00 421 Furnish and install 8" x 6" reducers, complete as specified Each 9 9.00 $240.00 422 Relocate hydrant, complete asspecified Each 2 0.00 -2.00 $600.00 ($1,200.00) 423 Furnish and install hydrants, complete as s ecified Each 19 19.00 $2,800.00 424 Furnish and install gradeloks for hydrant branches, complete as specified Each 19 0.00 -19.00 1 $350.00 1 1 ($6,650.00) Page 8 of 10 CONTRACT: 10 -07 CHANGE ORDER # 2 ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 425 Furnish and install connections of new water main to existing water main (various sizes and locations), complete as specified Each 10 10.00 $1,000.00 426 Furnish and install 4" cap, complete as specified 427 Furnish and install 6" cap, Each 1 0.00 -1.00 $150.00 ($150.00) complete as specified 428 Furnish and install 8" cap, Each 3 0.00 -3.00 $175.00 ($525.00) complete as specified 429 Cut and cap existing 4" Each 3 0.00 -3.00 $210.00 ($630.00) water main, complete as specified Each 1 0.00 -1.00 $350.00 ($350.00) 430 Cut and cap existing 6" water main, complete as specified Each 1 0.00 -1.00 $400.00 ($400.00) 431 Cut and cap existing 8" water main, complete as specified Each 4 0.00 -4.00 $450.00 ($1,800.00) 432 Furnish and install 6" sleeve, complete as specified Each 5 6.00 1.00 $225.00 $225.00 433 Furnish and install 8" sleeve, complete as specified Each 8 8.00 $275.00 434 Abandon water main on Central St. (Prospect Ave. to W. New York Ave), Lump complete as specified Sum 1 1.00 $600.00 435 Abandon water main on Frankfort St. (Ceape Ave. to Bay Shore Dr.), Lump complete ass ecified Sum 1 1.00 $2,000.00 436 Abandon water main on Harney Ave. (Bowen St. to Eveline St.), complete as Lump specified Sum 1 1.00 $2,800.00 437 Abandon water main on Merrill St. (Prospect Ave. to W. New York Ave), Lump complete asspecified Sum 1 1.00 $600.00 438 Abandon water main on Prospect Ave. (Jackson St. to N. Main St.), complete Lump ass ecified Sum 1 1.00 $2,800.00 439 Abandon water main on Saratoga Ave. (Prospect Ave. to W. New York Ave), Lump complete as specified Sum 1 1.00 $1,200.00 Page 9 of 10 CONTRACT: 10 -07 CHANGE ORDER # 2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COSTPER INCREASE IN DECREASE IN NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 440 Abandon water main on Shorelane St. (Waugoo Ave. to Babbitz Ave.), Lump complete asspecified Sum 1 1.00 $400.00 441 Furnish and install 18" ___T casing pipe (18' lengths), complete asspecified Each 3 3.00 $1,500.00 SECTION IV - (BID ITEMS 400 - 441) - SUB - TOTALS NET DECREASE TO: SECTION IV NET INCREASE TO SECTIONS I, II, 111, IV NET DECREASE TO SECTIONS I, II, III, IV NET DECREASE TO CONTRACT: $35,060.00 ($35,790.00) ($730.00) $103,882.91 ($173,993.86) ($70,110.95) Page 10 of 10