HomeMy WebLinkAbout11-116MARCH 22, 2011 11 -116 RESOLUTION
(CARRIED 7 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS
CONTRACT NO. 10 -07 WITH CARL BOWERS & SONS
CONSTRUCTION CO. FOR VARIOUS CONCRETE PAVING &
UTILITY PROJECTS — NORTHEAST SIDE PAVING PROJECT
(- $70,110.95)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
CARL BOWERS & SONS CONSTRUCTION CO.
N1844 Maloney Rd.
Kaukauna, WI 54130
Net Decrease to contract: (- $70,110.95)
PURPOSE: See attached Change Order.
( 0
OHKOH
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works
DATE: March 17, 2011
RE: Change Order #2 for Public Works Contract No. 10 -07; with Carl Bowers & Sons Construction
Co. for Concrete Paving & Utilities — Northeast Paving Project ( -$70 ,110.95)
BACKGROUND
Change Order #2 for Contract 10 -07 is scheduled for consideration by the Common Council at the March 22,
2011 meeting. The contract was originally awarded to Carl Bowers & Sons Construction Co. Inc. in June of
2010. This change order is to finalize all quantities
ANALYSIS
Following is a summary of the significant changes items performed for each section of the CIP.
-Storm Sewer additional labor and materials to avoid conflicts with gas mains, WPS crews, telephone
duct package and water main.
- Sanitary Sewer included additional labor and materials for a drop manhole.
-Water Main included labor and materials to needed due to a failed water valve outside of the project
limits.
FISCAL IMPACT
Contract Section
Change Order Amount
CIP Budget Amount
New Contract Total
Street/Sidewalk
- $2,542.88
$1,916,000
$1,199,481.17
Storm Sewer
- $33,088.27
$1,013,400
$1,011,075.73
Sanitary Sewer
- $33,749.80
$983,500
$623,096.20
Water Main
- $730.00
$1,457,300
$825,500
Total
- $70,110.95
$5,370,200
$3,658,653.10
Adequate funds are available in the Capital Improvement Program Budget.
RECOMMENDATIONS
I recommend approval of the Change Order #2 to Contact No. 10 -07 in the amount of - $70,110.95 to Carl
Bowers & Sons Construction Co. Inc.
Respectfully Submitted,
Approved:
j A'�4j_14&
Steven M. Gohde
Asst. Director of Public Works City Manager
1:\Engineering \10 -07 Concrete Paving - NORTHEAST\Project_ Information \Correspondence\Memo \CO #2 exp 10- 07.doc
CHANGE ORDER # 2
DATED: March 3, 2011
TO: Carl Bowers Construction Co.
N1844 Maloney Rd.
Kaukauna, WI 54130
Your present contract with the City of Oshkosh, Contract No
and changed as follows:
NET DECREASE TO: SECTION I - CONCRETE PAVING
NET DECREASE TO: SECTION II - STORM SEWER
NET DECREASE TO: SECTION III - SANITARY SEWER
NET DECREASE TO: SECTION IV - WATER MAIN
NET DECREASE TO CONTRACT:
Recommended:
Director of Public Works
C3'il
10 -07 , is hereby amended
($2,542.88)
($33,088.27)
($33,749.80)
($730.00)
($70,110.95)
CITY OF OSHKOSH
City Manager
City Clerk
Approved and accepted:
r
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT: 10 -07 CHANGE ORDER # 2
SECTION 1 - CONCRETE PAVING
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
complete ass ecified
Yards
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
101
Sidewalk and driveway
PRICE
PRICE
100
Pavement removal,
Square
complete ass ecified
Yards
5,165
5,335.40
170.40
$1.28
$218.11
101
Sidewalk and driveway
removal, complete as
Square
specified
Feet
36,850
42,230.30
5,380.30
$0.50
$2,690.15
102
Excavation, complete as
Cubic
. Specified
Yards
12,620
12,133.40
- 486.60
$9.92
($4,827.07)
103
7" Non - reinforced concrete
pavement, including
integral curb, 5" base
material and grading,
complete as specified
Square
Yards
23,340
23,122.60
- 217.40
$27.86
1 ($6,056.76)
104
8" Concrete pavement,
HES, including integral
curb and 6" base material
and grading, complete as
Square
specified
Yards
730
918.70
188.70
$41.20
$7,774.44
105
12" Wide radius curb head,
complete as specified
Linear
Feet
790
780.40
-9.60
$6.00
($57.60)
106
Standard 30" curb &gutter,
7" (tie -in), complete as
Linear
specified
Feet
565
641.80
76.80
$20.00
$1,536.00
107
Sidewalk curb, complete as
Linear
specified
Feet
200
33.90
- 166.10
$25.00
($4,152.50)
108
4" Concrete sidewalk,
Square
complete asspecified
Feet
12,960
18,849.50
5,889.50
$3.10
$18,257.45
109
6" Concrete sidewalk &
driveway, complete as
Square
specified
Feet
32,065
31,072.40
- 992.60
$3.25
($3,225.95)
110
3'/" Asphaltic concrete
driveway, complete as
Square
specified
Yard
122
147.80
25,80
$37.00
$954.60
111
3'/2' Asphaltic concrete
transition, with base,
Square
complete asspecified
Yard
2,230
1 2,432.30
202.30
$23.00
$4,652.90
112
Furnish and install crushed
stone base course,
complete as specified
Tons
4,850
0.00
- 4,850.00
$6.50
($31,525.00)
113
Furnish CABC and
construct 1 -foot wide gravel
shoulder, complete as
Linear
specified
Feet
310
257.20
-52.80
$3.50
($184.80)
114
Sawing, complete as
Linear
specified
Feet
2,170
1,742.10
- 427.90
$1.50
($641.85)
115
Furnish and install
pavement ties (epoxy
coated), complete as
s ecified
Each
220
262.00
42,00
$7.00
$294.00
116
Adjust manholes and inlets,
complete as specified
Each
172
172.00
$235.00
Page 1 of 10
CONTRACT: 10 -07 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COSTPER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
117
Furnish and install No. 4
reinforcing bars (epoxy
coated), complete as
Linear
specified
Feet
300
690.00
390.00
$1.00
$390.00
118
Remove stump, complete
inch
asspecified
Diameter
1 26
60.00
34.00
$15.00
$510.00
119
Remove trees and stumps,
complete as specified
inch
Diameter
40
30.00
-10.00
$15.00
($150.00)
120
Furnish and install trees,
complete asspecified
Each
3
2.00
-1.00
$250.00
($250.00)
121
Provide and install metal
detectable warning plates,
complete as specified
Square
Feet
352
1 384.00
32.00
$28.00
$896.00
122
Terrace work on Central
Street; complete as
Lump
specified
Sum
1
1.00
$3,800.00
123
Terrace work on Frankfort
Street, complete as
Lump
specified
Sum
1
1.00
$5,100.00
124
Terrace work on Harney
Avenue, complete as
Lump
specified
Sum
1
1.00
$14,700.00
125
Terrace work on Merrill
Street, complete as
Lump
specified
Sum
1 1
1.00
$3,600.00
126
Terrace work on old RR
ROW (Prospect to Scott
including Scott ROW),
Lump
complete asspecified
Sum
1
1.00
$8,200.00
127
Terrace work on Prospect
Avenue, complete as
Lump
specified
Sum
1
1.00
$10,000.00
128
Terrace work on Saratoga
Avenue, complete as
Lump
specified
Sum
1
1.00
$2,800.00
129
Terrace work on Shorelane
Street, complete as
Lump
,specified
Sum
1
1.00
$3,200.00
130
Furnish and install cold
weather covering, 1 -layer
visquine, complete as
Square
specified
Yards
3,500
1,008.80
- 2,491.20
$0.01
($24.91)
131
Furnish and install cold
weather covering, 2 -layer
visquine, complete as
Square
specified
Yards
4,090
0.00
- 4,090.00
$0.01
($40.90)
132
Furnish and install cold
weather covering, 2 -layer
visquine and 6" hay,
Square
complete asspecified
Yards
4,090
0.00
- 4,090.00
$0.01
($40.90)
133
Excavation, special,
complete asspecified
Tons
1000
362.69
- 637.31
$9.00
($5,735.79)
SECTION I - (BID ITEMS 100 - 133) - SUB - TOTALS $38,173.65 ($56,914.03)
Page 2 of 10
CONTRACT: 10 -07 CHANGE ORDER # 2
ITEM
Extra work - 42" Concrete
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
widening (handwork),
Foot
0.00
137.00
137.00
-74.50
$25.50
PRICE
PRICE
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION I
ITEM
Extra work - 42" Concrete
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
widening (handwork),
Foot
0.00
137.00
137.00
-74.50
$25.50
PRICE
PRICE
134
Extra work - 42" Concrete
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
curb & guter and curb
Linear
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
widening (handwork),
Foot
0.00
137.00
137.00
-74.50
$25.50
$3,493.50
PRICE
135
Extra work - 7" concrete
pavement for angle parking
by Stephens Park,
Square
complete as specified
Yard
0.00
285.00
285.00
-0.48
$35.50
$10,117.50
($20.64)
136
Furnish and install dowel
bars, complete as specified
Linear
specified
Each
0.00
16.00
16.00
- 138.10
$13.00
$208.00
($5,800.20)
137
Furnish and install 1 foot
mill and overlay, complete
Lump
asspecified
Sum
0.00
1.00
1.00
$2,378.50
$2,378.50
ADDITIONAL WORK: C.O. 02 -(ITEMS 134-137) - SUB -TOTAL $16,197.50 $0.00
NET DECREASE TO: SECTION 1 ($2,542.88)
SECTION II - STORM SEWER
ITEM
Furnish and install 12"
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
specified
Feet
1,168
1,093.50
-74.50
$41.00
PRICE
PRICE
200
Furnish and install 12"
Storm Sewer, complete as
Linear
specified
Feet
1,168
1,093.50
-74.50
$41.00
($3,054.50)
201
Furnish and install 12" RCP
Class III Storm Sewer,
complete as specified
Linear
Feet
43
42.52
-0.48
$43.00
($20.64)
202
Furnish and install 15"
Storm Sewer, complete as
Linear
specified
Feet
2,314
2,175.90
- 138.10
$42.00
($5,800.20)
203
Furnish and install 15" RCP
Class III Storm Sewer,
complete as specified
Linear
Feet
273
272.35
- 0.65
$44.00
($28.60)
204
Furnish and install 18"
Storm Sewer, complete as
Linear
specified
Feet
845
823.86
-21.14
$46.00
($972.44)
205
Furnish and install 21"
Storm Sewer, complete as
Linear
specified
Feet
213
212.60
-0.40
$48.00
($19.20)
Page 3 of 10
CONTRACT: 10 -07 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
206
Furnish and install 24"
Storm Sewer, complete as
Linear
specified
Feet
2,041
1,892.33
- 148.67
$50.00
($7,433.50)
207
Furnish and install 30"
Storm Sewer, complete as
Linear
specified
Feet
584
565.66
-18.34
$65.00
($1,192.10)
208
Furnish and install 30" RCP
Class III Storm Sewer,
complete as specified
Linear
Feet
50
46.03
-3.97
$65.00
($258.05)
209
Furnish and install 29" x
45" RCP Class III Storm
Sewer, complete as
Linear
specified
Feet
173
162.61
-10.39
$90.00
($935.10)
210
Furnish and install 38" x
60" RCP Class III Storm
Sewer, complete as
Linear
specified
Feet
223
218.90
-4.10
$147.00
($602.70)
211
Furnish and install 48" x
76" RCP Class III Storm
Sewer, complete as
Linear
specified
Feet
1,159
1,095.25
-63.75
$170.00
($10,837.50)
212
Furnish and install 30" RCP
Class III Apron Endwall
with joint ties, complete as
specified
Each
1
1.00
$800.00
213
Furnish and install Std.
Inlets (Type 3 with 18"
sump) with castings,
complete asspecified
Each
83
81.00
-2.00
$1,200.00
($2,400.00)
214
Furnish and install Std.
Storm Manhole (4' Inside
Diameter) in various
locations without casting,
Vertical
complete asspecified
Feet
149
180.88
31.88
$280.00
$8,926.40
215
Furnish and install Std.
Storm Manhole (5' Inside
Diameter) in various
locations without casting,
Vertical
complete ass ecified
Feet
25
26.27
1.27
$400.00
$508.00
216
Furnish and install Std.
Storm Manhole (7' Inside
Diameter) in various
locations without casting,
Vertical
. Complete
asspecified
Feet
5
5.34
0.34
$800.00
$272.00
217
Furnish and install Std.
Storm Box Manhole (7'x
7') in various locations
without casting, complete
Vertical
asspecified
Feet
5
4.74
-0.26
$800.00
($208.00)
218
Furnish and install Std.
Storm Box Manhole (8'x
8') in various locations
without casting, complete
Vertical
asspecified
Feet
59
61.21
2.21
$900.00
$1,989.00
Page 4 of 10
CONTRACT: 10 -07 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
219
Furnish and install Std.
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
Storm Manhole (5' Inside
PRICE
PRICE
Diameter) in various
locations with casting,
Vertical
complete asspecified
Feet
4
2.65
-1.35
$500.00
($675.00)
220
Furnish and install 6"
Storm Lateral, complete as
Linear
specified
Feet
5,050
4,766.50
- 283.50
$29.00
($8,221.50)
221
Furnish and install storm
lateral marker balls,
complete asspecified
Each
354
358.00
4.00
$19.00
$76.00
222
Abandon lineal feet of 8" -
12" storm sewer, complete
Linear
asspecified
Feet
2,724
2,724.00
$10.00
223
Abandon lineal feet of 15"
and larger storm sewer,
Linear
complete asspecified
Feet
766
766.00
$10.00
224
Abandon Inlets or
Manholes, complete as
specified
Each
37
37.00
$250.00
225
Furnish, install, and
maintain Type "D" Inlet
Protection Std., complete
asspecified
Each
224
2D0.00
-24.00
$80.00
($1,920.00)
226
Furnish, install, and
maintain silt fence,
Linear
complete asspecified
Feet
140
0.00
- 140.00
$4.00
($560.00)
227
Furnish, install, and
maintain stone bags,
com fete asspecified
Each
10
0.00
-10.00
$12.00
($120.00)
228
Furnish, install, and
maintain sediment logs,
Linear
complete asspecified
Feet
53
0.00
-53.00
$12.00
($636.00)
SECTION 11 - (BID ITEMS 200 - 228) - SUB - TOTALS $11,771.40 ($45,895.03)
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION 11
240 Furnish and install steel
plate on storm manhole
due to shallow depth of Lump
manhole Sum 0.00 1.00 1.00 $1,035.36 $1,035.36
ADDITIONAL WORK: C.O. # 2 - (ITEMS 240) - SUB -TOTAL $1,035.36 $0.00
NET DECREASE TO: SECTION II ($33,088.27)
Page 5 of 10
INCREASE 1N
DECREASE IN
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
PRICE
PRICE
240 Furnish and install steel
plate on storm manhole
due to shallow depth of Lump
manhole Sum 0.00 1.00 1.00 $1,035.36 $1,035.36
ADDITIONAL WORK: C.O. # 2 - (ITEMS 240) - SUB -TOTAL $1,035.36 $0.00
NET DECREASE TO: SECTION II ($33,088.27)
Page 5 of 10
CONTRACT: 10 -07 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
sanitary sewer (relay),
Linear
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
complete as specified
Feet
6,100
6,054.10
-45.90
$54.00
PRICE
PRICE
SECTION III - SANITARY SEWER
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE 1N
DECREASE 1N
NUMBER
sanitary sewer (relay),
Linear
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
complete as specified
Feet
6,100
6,054.10
-45.90
$54.00
PRICE
PRICE
300
Furnish and install 8"
sanitary sewer (relay),
Linear
complete as specified
Feet
6,100
6,054.10
-45.90
$54.00
($2,478.60)
301
Furnish and install 12"
sanitary sewer (relay),
Linear
, complete asspecified
Feet
340
338.20
-1.80
$59.00
($106.20)
302
Furnish and install std.
sanitary manhole (4' inside
diameter) in various
locations, complete as
specified, without casting
Vertical
Feet
270
253.86
-16.14
$175.00
($2,824.50)
303
Furnish and install 8" x 4"
factory wyes or tees,
complete asspecified
Each
2
3.00
1.00
$70.00
$70.00
304
Furnish and install 8" x 6"
Factory Wyes or Tees
Linear
complete asspecified
Feet
181
167.00
-14.00
$80.00
($1,120.00)
305
Furnish and install new 4"
sanitary laterals, complete
Linear
asspecified
Feet
60
59.50
-0.50
$47.00
1
($23.50)
306
Furnish and install 4 " /6"
sanitary lateral relay,
Linear
complete asspecified
Feet
4,820
4,198.00
- 622.00
$45.00
($27,990.00)
307
Furnish and install sanitary
lateral marker balls,
complete as specified
Each
369
361.00
-8.00
$19.00
($152.00)
308
Furnish and install
connections of new
sanitary main to existing
sanitary main (various
locations and sizes),
complete asspecified
Each
11
11.00
$400.00
309
Core into existing manhole,
complete as specified
Each
1
0.00
-1.00
$700.00
($700.00)
310
Abandon sanitary
manholes at various
locations, complete as
specified
Each
3
3.00
$365.00
311
Abandon 8" sanitary sewer
at various locations,
complete as specified
Linear
Feet
60
60.00
$3.00
312
Abandon 10" sanitary
sewer at various locations,
complete as specified
Linear
Feet
300
300.00
$3.00
Page 6 of 10
CONTRACT: 10 -07 CHANGE ORDER # 2
ITEM
Furnish and install 4"
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE 1N
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
NUMBER
wlpoly wrap, complete as
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
313
Abandon 12" sanitary
Linear
PRICE
PRICE
sewer at various locations,
Feet
35
24.00
-11.00
$90.00
($990.00)
401
complete as specified
Linear
ductile iron water main
Feet
60
60.00
$8.00
314
Furnish and install concrete
collars, complete as
Linear
specified
Each
1
1.00
65.00
$250.00
$4,875.00
315
Furnish and install 8"
sanitary sewer drop,
Vertical
complete asspecified
Feet
13
18.25
5.25
$300.00
$1,575.00
316
Furnish and install 18"
Linear
casing pipe (18' lengths),
Feet
6,760
7,116.00
356.00
$57.00
$20,292.00
403
corn lete asspecified
Each
2
2.00
$1,500.00
317
Furnish and install 12" x 6"
Factory wyes, complete as
specified
I Each
10
10.00
$200.00
SECTION III - (BID ITEMS 300 - 317) - SUB - TOTALS $1,645.00 ($35,394.80)
NET DECREASE TO: SECTION III ($33,749.80)
SECTION IV - WATER MAIN
ITEM
Furnish and install 4"
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
DESCRIPTION
UNIT
CONTRACT
CONTRACT
NUMBER
wlpoly wrap, complete as
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
specified (fittings not
Linear
PRICE
PRICE
400
Furnish and install 4"
ductile iron water main
wlpoly wrap, complete as
specified (fittings not
Linear
included )
Feet
35
24.00
-11.00
$90.00
($990.00)
401
Furnish and install 6"
ductile iron water main
wlpoly wrap, complete as
specified (fittings not
Linear
included )
Feet
175
240.00
65.00
$75.00
$4,875.00
402
Furnish and install 8"
ductile iron water main
w /poly wrap, complete as
specified (fittings not
Linear
included )
Feet
6,760
7,116.00
356.00
$57.00
$20,292.00
403
Furnish and install 1" water
service relay, complete as
specified, not including
corporation and stop box
Linear
Feet
4,150
4
9.00
$38.00
$342.00
404
Furnish and install new 1"
water service, complete as
specified, not including
corporation and stop box
Linear
Feet
40
41.00
1.00
$41.00
$41.00
405
Furnish and install 1"
corporation and stop box
with stainless steel rod,
complete asspecified
Each
175
177.00
2.00
$275.00
$550.00
Page 7 of 10
CONTRACT: 10 -07 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
PRICE
PRICE
406
Furnish and install 8" x 6"
tees, complete as specified
Each
20
1 18.00
-2.00
$360.00
($720.00)
407
Furnish and install 8" x 8"
tees, complete as specified
Each
11
8.OD
-3.00
$370.00
($1,110.00)
408
Furnish and install 8" x 8"
cross, complete as
specified
Each
2
2.00
$350.00
409
Furnish and install 6"
valves, complete as
specified
Each
22
19.00
-3.00
$1,050.00
($3,150.00)
410
Furnish and install 8"
valves, complete as
specified
Each
44
34.00
-10.00
$1,350.00
($13,500.00)
411
Furnish and install 6" x 6"
tapping valve and sleeve,
complete asspecified
Each
4
4.00
$2,300.00
412
Furnish and install 8" x 8"
tapping valve and sleeve,
complete asspecified
Each
1
0.00
-1.00
$2,800.00
($2,800.00)
413
Furnish and install 8" - 11
% degree bends, complete
asspecified
Each
1
2.00
1.00
$275.00
$275.00
414
Furnish and install 4" - 22
'/2 degree bends, complete
asspecified
Each
3
0.00
-3.00
$210.00
($630.00)
415
Furnish and install 6" - 22
'/z degree bends, complete
asspecified
Each
3
0.00
-3.00
$215.00
($645.00)
416
Furnish and install 8" - 22
'/ degree bends, complete
asspecified
Each
4
2.00
-2.00
$270.00
($540.00)
417
Furnish and install 4" - 45
degree bends, complete as
, specified
Each
6
6.00
$210.00
418
Furnish and install 6" - 45
degree bends, complete as
specified
Each
6
34.00
28.00
$225.00
$6,300.00
419
Furnish and install 8" - 45
degree bends, complete as
specified
Each
20
28.00
8.00
$270.00
$2,160.00
420
Furnish and install 8" x 4°
reducer, complete as
specified
Each
2
2.00
$225.00
421
Furnish and install 8" x 6"
reducers, complete as
specified
Each
9
9.00
$240.00
422
Relocate hydrant, complete
asspecified
Each
2
0.00
-2.00
$600.00
($1,200.00)
423
Furnish and install
hydrants, complete as
s ecified
Each
19
19.00
$2,800.00
424
Furnish and install
gradeloks for hydrant
branches, complete as
specified
Each
19
0.00
-19.00 1
$350.00 1
1
($6,650.00)
Page 8 of 10
CONTRACT: 10 -07 CHANGE ORDER # 2
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
PRICE
PRICE
425
Furnish and install
connections of new water
main to existing water main
(various sizes and
locations), complete as
specified
Each
10
10.00
$1,000.00
426
Furnish and install 4" cap,
complete as specified
427
Furnish and install 6" cap,
Each
1
0.00
-1.00
$150.00
($150.00)
complete as specified
428
Furnish and install 8" cap,
Each
3
0.00
-3.00
$175.00
($525.00)
complete as specified
429
Cut and cap existing 4"
Each
3
0.00
-3.00
$210.00
($630.00)
water main, complete as
specified
Each
1
0.00
-1.00
$350.00
($350.00)
430
Cut and cap existing 6"
water main, complete as
specified
Each
1
0.00
-1.00
$400.00
($400.00)
431
Cut and cap existing 8"
water main, complete as
specified
Each
4
0.00
-4.00
$450.00
($1,800.00)
432
Furnish and install 6"
sleeve, complete as
specified
Each
5
6.00
1.00
$225.00
$225.00
433
Furnish and install 8"
sleeve, complete as
specified
Each
8
8.00
$275.00
434
Abandon water main on
Central St. (Prospect Ave.
to W. New York Ave),
Lump
complete as specified
Sum
1
1.00
$600.00
435
Abandon water main on
Frankfort St. (Ceape Ave.
to Bay Shore Dr.),
Lump
complete ass ecified
Sum
1
1.00
$2,000.00
436
Abandon water main on
Harney Ave. (Bowen St. to
Eveline St.), complete as
Lump
specified
Sum
1
1.00
$2,800.00
437
Abandon water main on
Merrill St. (Prospect Ave. to
W. New York Ave),
Lump
complete asspecified
Sum
1
1.00
$600.00
438
Abandon water main on
Prospect Ave. (Jackson St.
to
N. Main St.), complete
Lump
ass ecified
Sum
1
1.00
$2,800.00
439
Abandon water main on
Saratoga Ave. (Prospect
Ave. to W. New York Ave),
Lump
complete as specified
Sum
1
1.00
$1,200.00
Page 9 of 10
CONTRACT: 10 -07 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COSTPER
INCREASE IN
DECREASE IN
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
PRICE
PRICE
440
Abandon water main on
Shorelane St. (Waugoo
Ave. to Babbitz Ave.),
Lump
complete asspecified
Sum
1
1.00
$400.00
441
Furnish and install 18"
___T
casing pipe (18' lengths),
complete asspecified
Each
3
3.00
$1,500.00
SECTION IV - (BID ITEMS 400 - 441) - SUB - TOTALS
NET DECREASE TO: SECTION IV
NET INCREASE TO SECTIONS I, II, 111, IV
NET DECREASE TO SECTIONS I, II, III, IV
NET DECREASE TO CONTRACT:
$35,060.00 ($35,790.00)
($730.00)
$103,882.91
($173,993.86)
($70,110.95)
Page 10 of 10