HomeMy WebLinkAboutBuilding (no permit) - 02/05/2003 INSPECTION SERVICES DIVISION CITY OF OSHKOSH
DEPARTMENT OF COMMUNITY DEVELOPMENT 215 CHURCH AVE
OSHKOSH Room 205 PO Box 1130
ON THE WATER CORRECTION NOTICE OSHKOSH WI 54903 -1130
Issue Date 02/05/2003 Compliance Date 02/19/2003 Compliance No
Address 3770 GLENSHIRE LN Inspected By John Zarate 236 -5119
Name Address City State Zip Code
Sent to (J Owner ROBERT KANE 3770 GLENSHIRE LN Oshkosh WI 54901 -0000
HI Contractor _ 0 -0000
Li Other I _ 0 -0000
Li Inspector
Li Required for Occupancy Occupancy Single Family Notice 0 First • Final Q Other
Violations must be corrected and approved within 30 days unless otherwise noted. Call for reinspections prior to concealment
and /or occupancy. Upon completing the corrections, the owner /contractor /agent must sign and date at the bottom of this notice
and return it to the Inspection Services Division by the Compliance Date of 02/19/2003
introduction This is a second notice for you to obtain a permit for siding that has been installed on your home.
Item # 1 Code Mun. 7 - 8 Compliance No Compliance Date 02/19/2003 IMMEDIATELY
Description No building or structure or any part thereof shall be moved, built, enlarged, altered, or demolished within the City unless a
permit is obtained. There is no permit on record for re- siding at this address.
Summary The permit must be applied for within the next 10 days to avoid citations. Permit hours are Monday -Friday 7:30- 8:30am and
12:30- 1:30pm. If you have questions feel free to contact me at 236 -5119.
DEFICIENCIES MUST BE CORRECTED AND APPROVED BEFORE CONCEALMENT. CALL (920) 236 - 5050 FOR INSPECTION.
Signature Date 2/51200.3
I hereby certify the violations listed on this report have been corrected in compliance with the applicable codes.
�i4tSE2�' /r4 /VE
P nt a�e
Company
1 L -- /1 -- t�3
Signature Date
R ECE IVE D
FEB 21 20o3
DE.PARTMENT OF
- 7 :v1MUNITY EVE DEVELOPMENT
Page 1 of 1
0 INSPECTION SERVICES DIVISION CITY OF OSHKOSH
DEPARTMENT OF COMMUNITY DEVELOPMENT 215 CHURCH AVE
OSHKOSH Room 205 PO Box 1130
ON THE WATER CORRECTION NOTICE OSHKOSH WI 54903 -1130
Issue Date 02/05/2003 Compliance Date 02/19/2003 Compliance No
Address 3770 GLENSHIRE LN Inspected By John Zarate 236 -5119
Name Address City State Zip Code
Sent to IJ Owner ROBERT KANE 3770 GLENSHIRE LN Oshkosh WI 54901 -0000
�J Contractor 0 -0000
LA Other 0 -0000
U Inspector
u Required for Occupancy I Occupancy Single Family Notice 0 First • Final 0 Other
Violations must be corrected and approved within 30 days unless otherwise noted. Call for reinspections prior to concealment
and /or occupancy. Upon completing the corrections, the owner /contractor /agent must sign and date at the bottom of this notice
and return it to the Inspection Services Division by the Compliance Date of 02/19/2003
Introduction This is a second notice for you to obtain a permit for siding that has been installed on your home.
Item # 1 Code Mun. 7 - 8 Compliance No Compliance Date 02/19/2003 IMMEDIATELY
Description No building or structure or any part thereof shall be moved, built, enlarged, altered, or demolished within the City unless a
permit is obtained. There is no permit on record for re- siding at this address.
Summary The permit must be applied for within the next 10 days to avoid citations. Permit hours are Monday -Friday 7:30- 8:30am and
12:30- 1:30pm. If you have questions feel free to contact me at 236 -5119.
DEFICIENCIES MUST BE CORRECTED AND APPROVED BEFORE CONCEALMENT. CALL (920) 236 -5050 FOR INSPECTION.
b
Signature 0,4 Date Zls/Zp,�
I hereby certify the violations listed on this report have been corrected in compliance with the applicable codes.
Print Name Company
Signature Date
Page 1 of 1
Zarate, John F.
Subject: 3770 Glenshire
Start Date: Monday, June 17, 2002
Due Date: Thursday, February 27, 2003
Status: In Progress
Percent Complete: 0%
Total Work: 0 hours
Actual Work: 0 hours
Owner: Zarate, John F.
Siding no permit
Sent out 1st notice June 17, 2002
Sent out 2nd notice February 2/5/2003
2/19- Tried to call - no answer
2/24- Received notice on 2/21 that the violations have been corrected. Still no permit on file.
tried calling owner 1:27pm no answer or machine.
4/9/03 - Project closed no permit on file. No contact by phone owner apparently he is not understanding.
1