Loading...
HomeMy WebLinkAboutBuilding (no permit) - 02/05/2003 INSPECTION SERVICES DIVISION CITY OF OSHKOSH DEPARTMENT OF COMMUNITY DEVELOPMENT 215 CHURCH AVE OSHKOSH Room 205 PO Box 1130 ON THE WATER CORRECTION NOTICE OSHKOSH WI 54903 -1130 Issue Date 02/05/2003 Compliance Date 02/19/2003 Compliance No Address 3770 GLENSHIRE LN Inspected By John Zarate 236 -5119 Name Address City State Zip Code Sent to (J Owner ROBERT KANE 3770 GLENSHIRE LN Oshkosh WI 54901 -0000 HI Contractor _ 0 -0000 Li Other I _ 0 -0000 Li Inspector Li Required for Occupancy Occupancy Single Family Notice 0 First • Final Q Other Violations must be corrected and approved within 30 days unless otherwise noted. Call for reinspections prior to concealment and /or occupancy. Upon completing the corrections, the owner /contractor /agent must sign and date at the bottom of this notice and return it to the Inspection Services Division by the Compliance Date of 02/19/2003 introduction This is a second notice for you to obtain a permit for siding that has been installed on your home. Item # 1 Code Mun. 7 - 8 Compliance No Compliance Date 02/19/2003 IMMEDIATELY Description No building or structure or any part thereof shall be moved, built, enlarged, altered, or demolished within the City unless a permit is obtained. There is no permit on record for re- siding at this address. Summary The permit must be applied for within the next 10 days to avoid citations. Permit hours are Monday -Friday 7:30- 8:30am and 12:30- 1:30pm. If you have questions feel free to contact me at 236 -5119. DEFICIENCIES MUST BE CORRECTED AND APPROVED BEFORE CONCEALMENT. CALL (920) 236 - 5050 FOR INSPECTION. Signature Date 2/51200.3 I hereby certify the violations listed on this report have been corrected in compliance with the applicable codes. �i4tSE2�' /r4 /VE P nt a�e Company 1 L -- /1 -- t�3 Signature Date R ECE IVE D FEB 21 20o3 DE.PARTMENT OF - 7 :v1MUNITY EVE DEVELOPMENT Page 1 of 1 0 INSPECTION SERVICES DIVISION CITY OF OSHKOSH DEPARTMENT OF COMMUNITY DEVELOPMENT 215 CHURCH AVE OSHKOSH Room 205 PO Box 1130 ON THE WATER CORRECTION NOTICE OSHKOSH WI 54903 -1130 Issue Date 02/05/2003 Compliance Date 02/19/2003 Compliance No Address 3770 GLENSHIRE LN Inspected By John Zarate 236 -5119 Name Address City State Zip Code Sent to IJ Owner ROBERT KANE 3770 GLENSHIRE LN Oshkosh WI 54901 -0000 �J Contractor 0 -0000 LA Other 0 -0000 U Inspector u Required for Occupancy I Occupancy Single Family Notice 0 First • Final 0 Other Violations must be corrected and approved within 30 days unless otherwise noted. Call for reinspections prior to concealment and /or occupancy. Upon completing the corrections, the owner /contractor /agent must sign and date at the bottom of this notice and return it to the Inspection Services Division by the Compliance Date of 02/19/2003 Introduction This is a second notice for you to obtain a permit for siding that has been installed on your home. Item # 1 Code Mun. 7 - 8 Compliance No Compliance Date 02/19/2003 IMMEDIATELY Description No building or structure or any part thereof shall be moved, built, enlarged, altered, or demolished within the City unless a permit is obtained. There is no permit on record for re- siding at this address. Summary The permit must be applied for within the next 10 days to avoid citations. Permit hours are Monday -Friday 7:30- 8:30am and 12:30- 1:30pm. If you have questions feel free to contact me at 236 -5119. DEFICIENCIES MUST BE CORRECTED AND APPROVED BEFORE CONCEALMENT. CALL (920) 236 -5050 FOR INSPECTION. b Signature 0,4 Date Zls/Zp,� I hereby certify the violations listed on this report have been corrected in compliance with the applicable codes. Print Name Company Signature Date Page 1 of 1 Zarate, John F. Subject: 3770 Glenshire Start Date: Monday, June 17, 2002 Due Date: Thursday, February 27, 2003 Status: In Progress Percent Complete: 0% Total Work: 0 hours Actual Work: 0 hours Owner: Zarate, John F. Siding no permit Sent out 1st notice June 17, 2002 Sent out 2nd notice February 2/5/2003 2/19- Tried to call - no answer 2/24- Received notice on 2/21 that the violations have been corrected. Still no permit on file. tried calling owner 1:27pm no answer or machine. 4/9/03 - Project closed no permit on file. No contact by phone owner apparently he is not understanding. 1