HomeMy WebLinkAboutPlumbing #F3-59-1089-P Nov. 14, 1989
Reinke,Hansahe,Last,Inc.
805 N. Main St.
Oshkosh, WI 54901
RE :Plumbing Plan Approval for 1332 Monroe
#F3- 59 -1089P
Gentlemen:
Examination of the plumbing plans and specifications for the
above mentioned project has been oompleted.
In acoord with Chapter 145, Wisconsin Statute, and ILHR 81 through
85, Wisconsin Administrative Code, the plumbing plans and
specifications are approved contingent upon compliance with the
stipulation noted below:
1. Building sewer cleanout access shall not exceed 75' in length
between oleanouts and at all pipe size changes. ILHR 82.35
2. All p-trapa shall be nerved by a sanitary vent. ILHR 82.31
The arohiteot, professional engineer, registered designer, owner
or plumbing contractor shall keep, at the construction site, one
set of plans bearing the stamp of approval.
In the event inatailation of this plumbing system has not
commenced within two years from this date, this approval shall
become void. A new application accompanied by full examination
fee shall be filed and an updated approval received before work
may commenoe.
In granting this approval, the City of Oshkosh, or its
representative does not hold itself liable for any defects in
plans or specification, plan omissions, examination oversight,
construction or any damage that may result in or after
installation and reserves the right to order changes or additions
should conditions arise making this necessary.
It aha ll be necessary for inatalling plumber to obtain a plumbing
permit from the City of Oshkosh before proceeding with actual
inatailation of this plumbing system or any of its parts.
Sincerely,
RICHARD WOOD
Plumbing Inspector
RW: mr