Loading...
HomeMy WebLinkAboutPlumbing #F3-59-1089-P Nov. 14, 1989 Reinke,Hansahe,Last,Inc. 805 N. Main St. Oshkosh, WI 54901 RE :Plumbing Plan Approval for 1332 Monroe #F3- 59 -1089P Gentlemen: Examination of the plumbing plans and specifications for the above mentioned project has been oompleted. In acoord with Chapter 145, Wisconsin Statute, and ILHR 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation noted below: 1. Building sewer cleanout access shall not exceed 75' in length between oleanouts and at all pipe size changes. ILHR 82.35 2. All p-trapa shall be nerved by a sanitary vent. ILHR 82.31 The arohiteot, professional engineer, registered designer, owner or plumbing contractor shall keep, at the construction site, one set of plans bearing the stamp of approval. In the event inatailation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fee shall be filed and an updated approval received before work may commenoe. In granting this approval, the City of Oshkosh, or its representative does not hold itself liable for any defects in plans or specification, plan omissions, examination oversight, construction or any damage that may result in or after installation and reserves the right to order changes or additions should conditions arise making this necessary. It aha ll be necessary for inatalling plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual inatailation of this plumbing system or any of its parts. Sincerely, RICHARD WOOD Plumbing Inspector RW: mr