Loading...
HomeMy WebLinkAbout11-112MARCH 8, 2011 11 -112 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: ESTABLISH 2011 STORM WATER UTILITY RATE TO $72.36/ERU INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has previously established a Stormwater Utility; and WHEREAS, Section 24.14 (C)(2)(b) of the Oshkosh Municipal Code gives the Common Council authority to establish the Equivalent Runoff Unit (ERU) charge for the Utility. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the Equivalent Runoff Unit (ERU) charge for 2011 shall be $72.36/ERU. BE IT FURTHER RESOLVED that the appropriate City officials are authorized and directed to take those steps necessary to implement this charge to become effective for services provided on and after April 1, 2011. ( 0 Of HKO1H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: March 2, 2011 RE: Storm Water Utility Rate Increase BACKGROUND The City of Oshkosh implemented a Storm Water Utility in 2003 to fund improvements to the City's storm water management facilities. Based on the initial Storm Water Utility study completed in September of 2002 the Common Council implemented a phased introduction of the rates. The rate was initially set at $19.10 per Equivalent Runoff Unit (ERU) per year for one half of 2003. There were three subsequent rate increases, the most recent being to $62.92 per ERU per year in 2009. The Storm Water Utility has funded several projects to date including the Fair Acres detention basin, Anchorage Channel Construction, the Baldwin Avenue area dry detention basin, Tipler School area dry detention basin, North High School area wet detention basin and Oakwood Road wet detention basin. The City has experienced significant flooding during rain storms in 1990, 1993, 1996, 1999, 2001, 2004, 2008 and 2010. Localized areas also flood during smaller events. In addition, the City is now under a permit (MS4) from the DNR, as mandated by the EPA Clean Water Act, for discharge of storm water. This permit requires the implementation of multiple items to reduce the amount of pollutants entering lakes and rivers. The largest expense item in the permit is reducing the Total Suspended Solids (TSS) generated by the City as a whole by 20% in 2008 and 40% by 2013. We have met the 20% goal. AECOM was hired by the City to develop a City wide plan for pollution reduction. The City has also completed several flood studies in the past and is currently studying several watersheds to develop plans to reduce flooding in combination with pollution control. City staff, based on information from all studies, developed a schedule of work needed to reduce flooding and implement pollution control measures. The schedule calls for approximately two detention basins to be constructed per year with an emphasis on flood control. Where ever possible, pollution control measures will be implemented with flood control measures. ANALYSIS The City hired AECOM to perform a rate analysis to implement the projects outlined in the schedule, to implement other Capital Improvement Projects, and to fund operational costs. In order to support these activities, a rate of $72.36 per ERU per year is recommended. This rate will allow the City to complete all of the projects listed in the Capital Improvement Program (CIP) — Storm Sewer Section and also maintain daily operations. The rate is proposed to be in effect from April 2011 through 2012. The rate is able to be held constant through 2012 by applying reimbursed grant funds and cash reserves of the Storm Water Utility to the expenses anticipated for 2012. Finance Director Steeno has reviewed the cash reserves and concluded the Storm Water Utility can reduce its reserves to stabilize the utility rate. Even with this 1 AEngineeringAStorm Water InformationA201 I rate study memo. doc action, the Utility is able to retain adequate reserves to maintain favorable bond ratings and meet the operating needs of the utility. The Storm Water Utility Committee reviewed the proposed rate increase and recommended approval of the rate based on the needs of the community to address flooding and pollution control requirements. In the event grants or other monies are secured at more favorable rates than anticipated in the study, the rate increases for future years can be offset. The intent is to review the rate annually to incorporate actual construction costs from the previous year and incorporate other funds that became available to the utility. Attached is a 3 year projection of the Storm Water Utility rates. FISCAL IMPACT The rate of $72.36 per ERU per year is required to implement all of the projects and operations in the 2011 budgets. Any reduced rate increase will result in some projects listed in the CIP being postponed until future years. Pushing projects to future years will result in less reduction of flooding during significant rain events prior to project completion and will delay reaching the 40% TSS reduction goal. RECOMMENDATIONS The Storm Water Utility Committee recommends a rate increase to $72.36 per ERU per year. The Department of Public Works and Finance Department agree with the recommendation. It is recommended that the rate go into effect on April 1, 2011. The effect of the increase in April equates to a total cost of $70.00 per ERU for 2011. Respectfully Submitted, &,gh P�Z� Steven M. Gohde Asst. Director of Public Works Approved: City Manager L\Engineering\Storm Water Information1201 1 rate study memo.doc c O U . a) O ^ L 0. L W M O O .� O O 4-j D -f-j 1` d' V) C 00 W � -f–j co N 1` O O E� O O u N ti 0 0 CO O V L W M a) c� E O cn � L a) O CL a) Q C 0 0 (Q (6 C U O _0 a) cn > cu a) (n _ N 0 a a c L o 0 CU cm a) U' 0 a j O C O U U > m a) uS 0 - a) C: a) E Q E O UE Co c� � ca_ O 5 +_�' C N C — (n N = O a) a) a) a) +� ' O =3 a) M n a) N N a) (a L N ay (yj .::3 cy.) � r � -O �LL0 ON N N O O O O O O O O O O 1` d' CO co C 00 O N O N 1` O O O O u N ti 0 r- CO CO O O O T- N u i Q9- Q-, 1` Q9- � Q!)- (0 60- O CD O O ° O O O U) O CD O LO CO c^� N (D ° w MM .. N r O O cfl O q O M O M (D U O 00 M Ul) 1` 609- N M o0 Co LO � N � N � O O O O O O O CO M N O O N M d^ L N r O L O L f` Sri CO L N O w 00 M 00 LO 1` 09- N N CO M M O N rn U m C: a) co Q a) a) a a-- U W c L Ll1 N , a) a) a) O ca 0 4t a) c� E O cn � L a) O CL a) Q C 0 0 (Q (6 C U O _0 a) cn > cu a) (n _ N 0 a a c L o 0 CU cm a) U' 0 a j O C O U U > m a) uS 0 - a) C: a) E Q E O UE Co c� � ca_ O 5 +_�' C N C — (n N = O a) a) a) a) +� ' O =3 a) M n a) N N a) (a L N ay (yj .::3 cy.) � r � -O �LL0 ON N N