HomeMy WebLinkAbout11-100MARCH 8, 2011 11 -100 RESOLUTION
(CARRIED 7 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS
CONTRACT NO. 10 -04 WITH ADVANCE CONSTRUCTION,
INC. FOR VARIOUS CONCRETE PAVING & UTILITY
PROJECTS — NORTH SIDE PAVING PROJECT ( +$129,683.92)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
ADVANCE CONSTRUCTION, INC.
2141 Woodale Avenue
Green Bay, WI 54313
Net Increase to contract: $129,683.92
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct.
No.
311- 0410- 7480 -00000 —
Sidewalk Construction Fund
Acct.
No.
315 - 0410 - 7480 -00000 --
Street Improvement Fund Expenditures
Acct.
No.
317 - 0410 - 7480 -03301 --
Special Assessments Fund — Streets
Acct.
No.
317 - 0410 - 7480 -03302 --
Special Assessments Fund - Sewer
Acct.
No.
317 - 0410 - 7480 -03303 --
Special Assessments Fund - Water
Acct.
No.
317 - 0410 - 7480 -03304 --
Special Assessments Fund - Sidewalks
Acct.
No.
317 - 0410 - 7480 -03305 --
Special Assessments Fund - Storm Water
Acct.
No.
541 - 1810 - 1799 -00000 --
Water Utility Construction Work in Progress
Acct.
No.
551 - 1910 - 1799 -00000 --
Sewer Utility Construction Work in Progress
Acct.
No.
561 - 2010 - 1799 -00000 --
Storm Water Utility Construction Work in
Progress
( 0
Of [-KOJH
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works
DATE: March 3, 2011
RE: Change Order #1 for Public Works Contract No. 10 -04; for Advance Construction, Inc. for
Concrete Paving and Utilities /North Side Paving ( +$129,683.92)
BACKGROUND
Change Order #1 for Contract 10 -04 is scheduled for consideration by the Common Council at the March 8,
2011 meeting. The contract was originally awarded to Advance Construction, Inc. in April of 2010. This change
order is for additional work required to complete the contract and adjusts estimated quantities to actual field
installed quantities.
ANALYSIS
Following is a summary of the significant additional work items performed for each section of the CIP.
- Paving — Additional quantities of High Early Strength concrete were used to provide access, additional
side street lengths were repaired to provide drainage and repair poor pavement.
-Storm Sewer — Actual installed quantities were less than estimated.
- Sanitary Sewer — Additional work to match existing sanitary sewer conditions.
-Water Main — Additional work to adjust water main to avoid conflict with other utilities and install new
water lateral to Melvin Avenue Pump Station
FISCAL IMPACT
Contract Section
Change Order Amount
CIP Budget Amount
New Contract Total
Concrete Paving
$79,083.81
$1,897,300
$1,425,628.96
Storm Sewer
- $21,410.60
$861,905
$1,643,655.25
Sanitary Sewer
$19,780.53
$1,091,700
$800,443.53
Water Main
$52,230.18
$1,145,500
$906,298.43
Total
$129,683.92
$4,995,595
$4,776,026.17
Adequate funds are available in the relating sections of the 2010 Capital Improvement Budget. Adequate
funding is available in the Storm Sewer section from other projects.
RECOMMENDATIONS
I recommend approval of the Change Order #1 to Contact No. 10 -04 in the amount of $129,683.92 to Advance
Construction, Inc.
Respectfully Submitted, Approved:
Steven M. Gohde
1.
Asst. Director of Public Works City Manager
1AEngineering \1 0 -04 Concrete Paving\ Project_ Information \Correspondence \Memo \CO #I exp 10- 04.doc
CHANGE ORDER # 1
DATED: February 9, 2011
TO: Advance Construction Inc.
2141 Woodale Avenue
Green Bay WI 54313
Your present contract with the City of Oshkosh, Contract No
and changed as follows:
NET INCREASE TO: SECTION I - CONCRETE PAVING
NET DECREASE TO: SECTION II - STORM SEWER
NET INCREASE TO: SECTION III -SANITARY SEWER
NET INCREASE TO: SECTION IV -WATER MAIN
NET INCREASE TO CONTRACT:
Recommended:
Director of Public Works
10-04 is hereby amended
$79,083.81
($21,410.60)
$19,780.53
$52,230.18
$129,683.92
CITY OF OSHKOSH
City Manager
City Clerk
Approved andjaece��
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT: 10 -04 CHANGE ORDER # 1
SECTION I - CONCRETE PAVING
ITEM
Pavement removal,
Square
CONTRACT
INSTALLED
NET
NET
COSTPER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
101
Sidewalk and driveway
PRICE
PRICE
100
Pavement removal,
Square
complete asspecified
Yards
4,970
5,379.20
409.20
$3.00
$1,227.60
101
Sidewalk and driveway
removal, complete as
Square
specified
Feet
41,630
44,193.00
2,563.00
$0.50
$1,281.50
102
Excavation, complete as
Cubic
specified
Yards
15,290
17,980.80
2,690.80
$6.20
$16,682.96
103
7" non - reinforced concrete
pavement, including
integral curb, 5" base
material and grading,
Square
complete as specified
Yards
27,875
27,944.00
69.00
$26.75
$1,845.75
104
8" concrete pavement,
HES, including integral curb
and 6" base material and
grading, complete as
Square
specified
Yards
1,745
1,983.20
238.20
$35.27
$8,401.31
105
12" wide radius curb head,
complete as specified
Linear
Feet
1,625
1,866.30
241.30
$12.00
$2,895.60
106
Standard 24" curb & gutter,
7" (tie -in), complete as
Linear
specified
Feet
32
210.00
178.00
$25.00
$4,450.00
107
Standard 30" curb & gutter,
7" (tie -in), complete as
Linear
specified
Feet
240
134.50
- 105.50
$25.00
($2,637.50)
108
Sidewalk curb, complete as
Linear
specified
Feet
200
60.20
- 139.80
$18.00
($2,516.40)
109
4" concrete sidewalk,
Square
complete as specified
Feet
22,520
23,946.00
1,426.00
$ 3.03
$4,320.78
110
6" concrete sidewalk &
driveway, complete as
Square
specified
Feet
31,555
28,692.30
- 2,862.70
$3.18
($9,103.39)
111
3 %" asphaltic concrete
driveway, complete as
Square
specified
Feet
95
940.30
845.30
$3.91
$3,305.12
112
2" Asphaltic concrete
transition with base and
asphaltic curb, complete as
Square
specified
Yards
370
243.00
- 127.00
$17.75
($2,254.25)
113
3'/z" asphaltic concrete
transition, with base,
Square
complete asspecified
Yard
860
1,371.50
511.50
$34.85
$17,825.78
114
Furnish and install crushed
stone base course,
complete as specified
Tons
4,590
6,277.00
1,687.00
$7.77
$13,107.99
115
Sawing, complete as
Linear
specified
Feet
2,400
2,424.20
24.20
$1.65
$39.93
116
Furnish and install
pavement ties (epoxy
coated), complete as
specified
Each
460
376.00
-84.00
$6.00
($504.00)
117
Adjust manholes and inlets,
complete as specified
Each
241
229.00
-12.00
$250.00
($3,000.00)
Page 1 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
contract supplement,
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
complete as specified
Tons
0.00
589.10
589.10
$12.00
PRICE
PRICE
118
Furnish and install No. 4
reinforcing bars (epoxy
coated), complete as
Linear
specified
Feet
660
210.00
61.53
- 450.00
$1.00
$2,170.16
($450.00)
119
Remove trees and stumps,
complete as specified
Inch
and 6" base material and
Diameter
270
238.20
-31.80
$22.00
($699.60)
120
Furnish and install trees,
Square
complete as specified
Each
12
9.00
241.70
-3.00
$220.00
1 $8,655.28
($660.00)
121
Provide and install metal
detectable warning plates,
complete as specified
Square
as specified
Feet
680
792.00
112.00
$27.00
$3,024.00
122
Terrace work on Broad
Street, complete as
specified
Lump Sum
1
1.00
$5,345.00
123
Terrace work on Grand
Street, complete as
specified
Lump Sum
1
1.00
$8,600.00
124
Terrace work on E. Melvin
Avenue, complete as
specified
Lump Sum
1
1.00
$17,000.00
125
Terrace work on Ostertag
Place, complete as
specified
Lump Sum
1
1.00
$150.00
126
Terrace work on Powers
Street, complete as
specified
Lump Sum
1
1.00
$9,750.00
127
Terrace work on Rock
Place, complete as
specified
Lump Sum
1
1.00
$600.00
128
Terrace work on E.
Tennessee Avenue,
complete as specified
Lump Sum
1
1.00
$1,750.00
SECTION I - (BID ITEMS 100 - 128) - SUB - TOTALS $78,408.32 ($21,825.14)
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
contract supplement,
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
complete as specified
Tons
0.00
589.10
589.10
$12.00
PRICE
PRICE
129
Haul contaminated soil per
contract supplement,
complete as specified
Tons
0.00
589.10
589.10
$12.00
$7,069.20
130
8" concrete sidewalk and
driveways and 6" base
material and grading,
Square
complete as specified
Yards
0.00
61.53
61.53
$35.27
$2,170.16
131
7" concrete pavement,
HES, including integral curb
and 6" base material and
grading, complete as
Square
specified
Yards
0.00
241.70
241.70
$35.81
1 $8,655.28
132
Furnish and install 3" clear
stone breaker run used in
undercut areas, complete
as specified
Tons
0.00
175.40
175.40
$15.29
$2,681.87
Page 2 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
specified
Feet
1,824
1982.30
158.30
$45.50
PRICE
PRICE
133
Furnish and install 5" hot
mix asphaltic pavement,
Square
complete asspecified
Yards
0.00
12.40
12.40
- 119.00
$52.60
$652.24
($5,414.50)
134
Remove additional
concrete sidewalk to realign
Linear
sidewalk by Sub - Contractor
Feet
508
487.50
-20.50
$46.85
($960.43)
203
per Inspector's orders,
complete as specified
Square
specified
Feet
0.00
152.50
152.50
-38.10
$0.75
$114.38
135
Additional landscaping
beyond the project limits,
Lump
complete as specified
Sum
0.00
1.00
1.00
- 157.50
$223.00
$223.00
($8,095.50)
136
Added hot water to
concrete mix at batch plant
Linear
due to late season
Feet
570
524.60
-45.40
$66.60
($3,023.64)
206
installation, complete as
Lump
specified
Sum
0.00
1.00
1.00
$934.50
$934.50
137
Additional days added to
Feet
616
568.50
-47.50
$77.60
($3,686.00)
207
contract for various
additional work per letter
Linear
dated July 6, 2010
Days
0.00
0.00
12.00
-15.70
$0.00
($1,461.67)
ADDITIONAL WORK: C.0.#1 -(ITEMS 129-136)-SUB-TOTAL $22,500.63 $0.00
NET INCREASE TO: SECTION 1 $79,083.81
SECTION II - STORM SEWER
ITEM
Furnish and install 12"
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
specified
Feet
1,824
1982.30
158.30
$45.50
PRICE
PRICE
200
Furnish and install 12"
storm sewer, complete as
Linear
specified
Feet
1,824
1982.30
158.30
$45.50
$7,202.65
201
Furnish and install 15"
storm sewer, complete as
Linear
specified
Feet
2,248
2129.00
- 119.00
$45.50
($5,414.50)
202
Furnish and install 18"
storm sewer, complete as
Linear
specified
Feet
508
487.50
-20.50
$46.85
($960.43)
203
Furnish and install 21"
storm sewer, complete as
Linear
specified
Feet
919
880.90
-38.10
$49.50
204
Furnish and install 24"
storm sewer, complete as
Linear
specified
Feet
580
422.50
- 157.50
$51.40
($8,095.50)
205
Furnish and install 36"
storm sewer, complete as
Linear
s ' pecified
Feet
570
524.60
-45.40
$66.60
($3,023.64)
206
Furnish and install 42"
storm sewer, complete as
Linear
specified
Feet
616
568.50
-47.50
$77.60
($3,686.00)
207
Furnish and install 48"
storm sewer, complete as
Linear
specified
Feet
222
206.30
-15.70
$93.10
($1,461.67)
Page 3of14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE /N
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
PRICE
PRICE
208
Furnish and install 48" T_ CP
Class III storm sewer,
complete as specified
Linear
Feet
1 59
74.00
15.00
$93.10
$1,396.50
209
Furnish and install 38" x
60" RCP Class III storm
sewer, complete as
Linear
specified
Feet
274
228.10
-45.90
$112.15
($5,147.69)
210
Furnish and install 48" x
76" RCP Class III storm
sewer, complete as
Linear
specified
Feet
453
438.40
-14.60
$151.85
($2,217.01)
211
Furnish and install 4'x 6'
box culvert storm sewer,
Linear
complete asspecified
Feet
1,150
1134.20
-15.80
$218.35
($3,449.93)
212
Furnish and install 4' x 8'
box culvert storm sewer,
Linear
complete as specified
Feet
997
980.20
-16.80
$304.00
($5,107.20)
213
Furnish and install 4' x 6'
box culvert storm sewer
w /manhole riser, complete
Linear
as specified
Feet
72
60.00
-12.00
$218.35
($2,620.20)
214
Furnish and install 4'x 8'
box culvert storm sewer
w /manhole riser, complete
Linear
as specified
Feet
48
63.00
15.00
$304.00
$4,560.00
215
Furnish and install 66" steel
casing pipe, complete as
Linear
specified
Feet
59
60.00
1.00
$1,100.00
$1,100.00
216
Furnish and install std.
inlets (type 3 with 18"
sump) with castings,
complete as specified
Each
102
102.00
$1,400.00
217
Furnish and install std.
inlets (type 3 with no sump)
with castings, complete as
specified
Each
3
4.00
1.00
$1,330.00
$1,330.00
218
Furnish and install std.
Storm manhole (4' inside
diameter) in 4 locations
without casting, complete
Vertical
as specified
Feet
121
117.42
-3.58
$170.00
($608.60)
219
Furnish and install std.
storm manhole (5' Inside
diameter) in 3 locations
without casting, complete
Vertical
as specified
Feet
24
22.15
1
-1.85
$267.00
($493.95)
220
Furnish and install std.
storm manhole (6' Inside
diameter) in 7 locations
without casting, complete
Vertical
as specified
Feet
50
50.00
$340.00
221
Furnish and install std.
storm box manhole (7'x 7')
in 1 location without
casting, complete as
Vertical
specified
Feet
10
28.37
18.37
$640.00
$11,756.80
Page 4 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE 1N
DECREASE IN
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
PRICE
PRICE
222
Furnish and install std.
storm manhole riser (4'
inside diameter) in 15
locations without casting,
Vertical
complete as specified
Feet
46
47.00
1.00
$116.00
1 $116.00
223
Furnish and install std.
storm inlet manhole (4'
inside diameter) in 2
locations with casting,
Vertical
complete as specified
Feet
8
8.67
0.67
$273.00
$182.91
224
Furnish and install std.
storm inlet manhole (5'
inside diameter) in 1
location with casting,
Vertical
complete as specified
Feet
7
6.00
-1.00
$320.00
($320.00)
225
Furnish and install std.
storm box inlet manhole (7'
x 7') in 1 location with
casting, complete as
Vertical
specified
Feet
9
0.00
-9.00
$700.00
1
($6,300.00)
226
Furnish and install std.
storm junction chambers
without casting, complete
as specified
Each
6
6.00
$16,000.00
227
Furnish and install 6" storm
lateral, complete as
Linear
specified
Feet
3,908
3606.50
- 301.50
$38.00
($11,457.00)
228
Furnish and install 8" storm
lateral, complete as
Linear
specified
Feet
26
36.00
10.00
$40.00
$400.00
229
Furnish and install storm
lateral marker balls,
complete as specified
Each
290
283.00
-7.00
$13.00
($91.00)
230
Abandon lineal feet of 8" -
12" storm sewer, complete
Linear
asspecified
Feet
1,120
1100.00
-20.00
$3.00
($60.00)
231
Abandon lineal feet of 15"
and larger storm sewer,
Linear
complete as specified
Feet
4,133
4100.00
-33.00
$5.00
($165.00)
232
Abandon inlets or
manholes, complete as
specified
Each
47
47.00
$250.00
233
Furnish, install, and
maintain Type "D" inlet
protection std., complete as
specified
Each
271
192.00
-79.00
$75.00
$5,925.00)
234
Furnish, install, and
maintain silt fence,
Linear
com fete as specified
Feet
30
0.00
-30.00
$2.00
($60.00)
235
Furnish, install, and
maintain stone bags,
complete as sp ecified
Each
5
0.00
-5.00
$8.00
($40.00
236
Utility line opening,
T Each
complete asspecified
2
0.00
-2.00
$550.00
($1,100.00)
SECTION II - (BID ITEMS 200 - 236) - SUB - TOTALS $28,044.86 ($69,690.27)
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION If
Page 5 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COSTPER
INCREASE IN
DECREASE IN
NUMBER
equipment, and materials to
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
install Type I inlet with 18"
PRICE
PRICE
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COSTPER
INCREASEIN
DECREASEIN
NUMBER
specified
Sum
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
238
Additional labor,
PRICE
PRICE
237
Additional labor,
equipment, and materials to
install Type I inlet with 18"
sump, complete as
Lump
specified
Sum
0.00
1.00
1.00
$1,400.00
$1,400.00
238
Additional labor,
equipment, and materials to
repair 18" storm sewer on
Eastman St, complete as
Lump
specified
Sum
0.00
1.00
1.00
$2,222.18
$2,222.18
239
Additional labor,
equipment, and materials to
remove the rock
obstructions on the boring
of the railroad tracks on
Melvin Ave, complete as
Lump
specified
Sum
0.00
1.00
1.00
$3,901.37
$3,901.37
240
Additional labor,
equipment, and materials to
install clay dam at the
northeast corner of Melvin
Ave. and Grove St.,
Lump
complete as specified
Sum
0.00
1.00
1.00
$3,086.16
$3,086.16
241
Additional labor,
equipment, and materials to
install clay dam through the
intersection of Melvin and
Grove, complete as
Lump
specified
Sum
0.00
1.00
1.00
$3,000.00
$3,000.00
242
Additional labor,
equipment, and materials to
install weir plate in MH M-
57 to prevent storm water
flow to allow completion of
storm water lift station,
complete as specified
Lump
Sum
0.00
1.00
1.00
$925.10
$925.10
243
Additional labor,
equipment, and materials to
move yard inlet on Melvin
just west of tracks,
complete as specified
Lump
Sum
0.00
1.00
1.00
$1,200.00
$1,200.00
244
Additional labor,
equipment, and materials to
recore manholes G28 and
G -30 to match field
conditions, complete as
Lump
specified
Sum
0.00
1.00
1.00
$4,500.00
$4,500.00
ADDITIONAL WORK: C.O. it 1 - (ITEMS 237 - 243) - SUB -TOTAL $20,234.81 $0.00
NET DECREASE TO: SECTION II ($21,410.60)
Page 6 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
JUMBER DESCRIPTION UNIT CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PIC
ECTION III - SANITARY SEWER PRICE RE
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
JUMBER QUANTITIES QUANTITIES INCREASE I DECREASE UNIT CONTRACT I CONTRACT
PRICE PRICE
300
Furnish and install 8"
sanitary sewer (relay),
Linear
complete asspecified
Feet
4,625
5038.20
413.20
$60.00
$24,792.00
301
Furnish and install 8"
sanitary sewer drop,
Vertical
complete as specified
Feet
30
15.01
-14.99
$250.00
($3,747.50)
302
Furnish and install 10"
sanitary sewer (relay),
Linear
complete asspecified
Feet
2,950
2598.00
- 352.00
$62.00
($21,824.00)
303
Furnish and install 12"
sanitary sewer (relay),
Vertical
complete as specified
Feet
15
10.00
-5.00
$75.00
($375.00)
304
Furnish and install 12"
sanitary sewer drop.
Vertical
complete as specified
Feet
5
0.00
-5.00
$300.00
($1,500.00)
305
Furnish and install 15"
sanitary sewer (relay),
Vertical
complete as specified
Feet
5
5.00
$90.00
306
Furnish and install 18"
sanitary sewer (relay),
Vertical
complete as specified
Feet
50
50.00
$96.00
307
Furnish and install 30"
sanitary sewer (relay),
Vertical
complete as specified
Feet
5
0.00
-5.00
$150.00
($750.00)
308
Furnish and install std,
sanitary manhole (4' inside
diameter) in various
locations, complete as
specified, without casting
Vertical
Feet
440
473.16
33.16
$200.00
$6,632.00
309
Furnish and install 8" x 4"
factory wyes or tees,
complete as specified
Each
1
0.00
-1.00
$40.00
($40.00)
310
Furnish and install 8" x 6"
factory wyes or tees,
complete asspecified
Each
100
100.00
$61.00
311
Furnish and install 10" x 6"
factory wyes or tees,
complete asspecified
Each
30
27.00
-3.00
$95.00
($285.00)
312
Furnish and install new 4"
sanitary laterals, complete
Linear
as specified
Feet
380
370.00
-10.00
$51.00
($510.00)
313
Furnish and install 4'Y6"
sanitary lateral relay,
Linear
complete as specified
Feet
2,950
2785.50
- 164.50
$52.00
($8,554.00)
314
Furnish and install sanitary
lateral marker balls,
complete as specified
315
Furnish and install concrete
Each
255
254.00
-1.00
$13.00
collars, complete as
specified
Each
2
4.00
2.00
$400.00
$800.00
Page 7 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE 1N
install tracer wire and tracer
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT-
CONTRACT
CONTRACT
316
Core into existing manhole,
wire boxes for sanitary
PRICE
PRICE
complete as specified
lateral for the storm water
317
Abandon sanitary
Each
6
5.00
-1.00
$550.00
($550.00 )
327
manholes at various
Sum
0.00
1.00
1.00
$1,353.03
$1,353.03
locations, complete as
equipment, and materials to
specified
Each
8
8.00
$350.00
318
Abandon 8" sanitary sewer
concrete ballast at the
at various locations
Linear
complete as specified
Feet
860
860.00
4.00 1
4.00 1
$2.70
$850.00
$3,400.00
319
Abandon 10" sanitary
sewer at various locations,
complete as specified
Linear
Feet
815
815.00
$3.00
320
Abandon 12" sanitary
sewer at various locations,
complete as specified
Linear
321
Furnish and install
Feet
1,040
240.00
- 800.00
$3.40
($2,720.00)
connections of new sanitary
main to existing sanitary
main (various locations and
sizes), complete as
specified
Each
23
18.00
-5.00
$550.00
($2,750.00)
322
Furnish and install 8" plug,
complete as specified
Each
1
1.00
$250.00
323
Furnish and install 18"
casing pipe (18' lengths),
complete as specified
Each
1
1.00
$2,000.00
324
Furnish and install 10" x 4"
factory wye or tee,
complete as specified
Each
1
0.00
-1.00
$80.00
($80.00)
325
Furnish and install 4"
sanitary lateral cleanout,
1
complete as specified
Each
3
0.00
-3.00
$290.00
($870.00)
SECTION III - (BID ITEMS 300 - 325) - SUB - TOTALS $32,224.00 ($44,568.50)
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
326
Additional labor,
equipment, and materials to
install tracer wire and tracer
wire boxes for sanitary
lateral for the storm water
pump station, complete as
Lump
327
specified
Additional labor,
Sum
0.00
1.00
1.00
$1,353.03
$1,353.03
equipment, and materials to
jack hammer and remove
concrete ballast at the
connection to MH H -8,
complete as specified
Hrs.
0.00
4.00 1
4.00 1
$850.00
$3,400.00
Page 8 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
COST PER
UNIT
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
PRICE
PRICE
328
Sanitary MH #18 was built
and delivered to site, upon
excavation it was
determined that the field
conditions did not match
MH #18 and manhole could
not be used, therefore the
city bought the manhole
section and it was delivered
Lump
to City yard
Sum
0.00
1.00
1.00
$1,604.75
$1,604.75
329
Existing field conditions did
not match inverts of MH M-
16, MH M10 was
substituted for MH M -16,
and MH M -16 was bought
by City and delivered to the
City yard. Payment for
additional crew time was
granted for the switching of
Lump
manholes
Sum
0.00
1.00
1.00
$3,892.25
$3,892.25
330
Additional labor,
equipment, and materials to
rebuild and plug MH M -8 to
match existing field
conditions, complete as
Hrs.
0.00
4.00
4.00
1 $750.00
$3,000.00
331
Additional labor,
equipment, and materials to
install 8" sanitary sewer
and casing pipe under the
box culvert at 705 Melvin,
complete as specified
Lump
Sum
0.00
1.00
1.00
$1,200.00
$1,200.00
332
Additional crew time and
jack hammer rental to cut
off existing drops and
concrete casing on existing
sanitary manhole at Melvin
and Powers, complete as
specified
Hours
0.00
4.00
4.00
$850.00
$3,400.00
333
Additional crew time and
jack hammer rental to cut
off existing drops and
concrete casing on existing
sanitary manhole MH N -10
at New York Ave., complete
as specified
Hours
0.00
3.50
3.50
$850.00
$2,975.00
334
Additional crew time and
jack hammer rental to cut
off existing drops and
concrete casing on existing
sanitary manhole at Broad
and Irving
Hours
0.00
1.50
1.50
$850.00
$1,275.00
335
Additional crew time and
jack hammer rental to cut
off existing drops and
concrete casing on existing
32" sanitary sewer on
Hazel St., complete as
specified
Hours
0.00
3.50
150
$850.00
$2,975.00
Page 9 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
COST PER
UNIT
INCREASE IN
CONTRACT
PRICE
DECREASE IN
CONTRACT
PRICE
336
Existing 12" sanitary sewer
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
was slurry filled, per
PRICE
PRICE
Inspector's request,
Linear
complete as specified
Feet
1 0.00
800.00
800.00
1 $6.00
$4,800.00
337
Additional labor,
equipment, and matreials to
install additional access
point to lift station lateral,
Linear
per City of Oshkosh
Feet
325
327.00
2.00
$53.45
$106.90
402
Plumbing Inspector's
orders, complete as
Lump
specified.
Sum
0.00
1.00
1.00
$2,250.00
$2,250.00
ADDITIONAL WORK: C. 0. 1 - (ITEMS 326 - 335) - SUB -TOTAL $32,125.03 $0.00
NET INCREASE TO: SECTION III $19,780.53
SECTION IV - WATER MAIN
ITEM
Furnish and install 4"
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
--T
PRICE
PRICE
400
Furnish and install 4"
ductile iron water main
wlpoly wrap, complete as
specified (fittings not
Linear
included)
Feet
20
384.00
364.00
$80.00
$29,120.00
401
Furnish and install 6"
ductile iron water main
wlpoly wrap, complete as
specified (fittings not
Linear
included)
Feet
325
327.00
2.00
$53.45
$106.90
402
Furnish and install 8"
ductile iron water main
w /poly wrap, complete as
specified (fittings not
Linear
included)
Feet
6,600
7010.00
410.00
$58.00
$23,780.00
403
Furnish and install 18"
ductile iron water main
w /poly wrap, complete as
specified (fittings not
Linear
included)
Feet
50
49.00
-1.00
$100.00
($100.00)
404
Furnish and install 1" water
service relay, complete as
specified, not including
corporation and stop box
Linear
Feet
3,000
2917.00
-83.00
$38.00
($3,154.00)
405
Furnish and install new 1"
water service, complete as
specified, not including
corporation and stop box
Linear
Feet
40
10.00
-30.00
$39.00
($1,170.00)
406
Furnish and install V
corporation and stop box
with stainless steel rod,
complete as specified
Each
125
122.00
-3.00
$300.00
($900.00)
Page 10 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
407
Furnish and install 8" x 6"
tees, complete as specified
Each
23
20.00
-3.00
$325.00
($975.00)
408
Furnish and install 8" x 8"
tees, complete as specified
Each
7
9.00
2.00.
$350.00
$700.00
409
Furnish and install 8" x 8"
cross, complete as
specified
Each
4
4.00
$336.00
410
Furnish and install 6"
valves, complete as
specified
Each
21
21.00
$855.00
411
Furnish and install 8"
valves, complete as
specified
Each
44
49.00
5.00
$1,120.00
$5,600.00
412
Furnish and install 18"
valves, complete as
specified
Each
2
2.00
$9,100.00
413
Furnish and install 6" x 6"
tapping valve and sleeve,
complete as specified
Each
1
0.00
-1.00
$2,200.00
($2,200.00)
414
Furnish and install 12" x 8"
tapping valve and sleeve,
complete as specified
Each
2
0.00
-2.00
$2,888.00
$5,776.00)
415
Furnish and install 4" - 22
' /2 degree bends, complete
as specified
Each
2
0.00
-2.00
$140.00
($280.00)
416
Furnish and install 6" - 22
'/ degree bends, complete
as specified
Each
3
0.00
-3.00
$180.00
($540.00)
417
Furnish and install 8" - 22
% degree bends, complete
as specified
Each
3
7.00
4.00
$245.00
$980.00
418
Furnish and install 4 " -45
degree bends, complete as
specified
Each
2
6.00
4.00
$145.00
$580.00
419
Furnish and install 6" -45
degree bends, complete as
specified
Each
18
34.00
16.00
$190.00
$3,040.00
420
Furnish and install 8 " -45
degree bends, complete as
specified
Each
34
53.00
19.00
$245.00
$4,655.00
421
Furnish and install 18" - 45
degree bends, complete as
specified
Each
4
4.00
$1,330.00
422
Furnish and install 8" x 4"
reducer, complete as
specified
Each
1
2.00
1.00
$200.00
$200.00
423
Furnish and install 8" x 6"
reducers, complete as
specified
Each
18
19.00
1.00
$215.00
$215.00
424
Relocate hydrant, complete
as specified
Each
2
0.00
-2.00
$800.00
($1,600.00)
425
Furnish and install
hydrants, complete as
specified
Each
17
20.00
3.00
$2,900.00
$8,700.00
Page 11 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
426
Furnish and install
gradeloks for hydrant
branches, complete as
specified
Each 1
17
0.00
-17.00 1
$400.00
($6,800.00)
427
Furnish and install
connections of new water
main to existing water main
(various sizes and
locations), complete as
specified
Each
28
25.00
-3.00
$1,735.00
($5,205.00)
428
Furnish and install 6" cap,
complete as specified
Each
5
0.00
-5.00
$250.00
($1,250.00)
429
Furnish and install 8" cap,
complete as specified
Each
7
3.00
-4.00
$300.00
($1,200.00)
430
Cut and cap existing 4"
water main, complete as
specified
Each
1
0.00
-1.00
$350.00
($350.00)
431
Cut and cap existing 6"
water main, complete as
specified
Each
3
0.00
-3.00
$380.00
($1,140.00)
432
Cut and cap existing 8"
water main, complete as
specified
Each
1
0.00
-1.00
$450.00
($450.00)
433
Furnish and install 6"
sleeve, complete as
specified
Each
5
6.00
1.00
$360.00
$360.00
434
Furnish and install 8"
sleeve complete as
specified
Each
5
6.00
1.00
$410.00
$410.00
435
Furnish and install 10"
sleeve complete as
specified
Each
5
0.00
-5.00
$550.00
($2,750.00)
436
Furnish and install 12"
sleeve complete as
specified
Each
5
1.00
-4.00
$700.00
($2,800.00)
437
Abandon water main on
Broad Street (Parkway Ave
to Irving Ave), complete as
Lump
specified
Sum
1
1.00
$1,000.00
438
Abandon water main on
Grand Street (Lincoln Ave
to New York Ave),
Lump
complete as specified
Sum
1
1.00
$3,000.00
439
Abandon water main on
Melvin Avenue (Eastman
Ave to Hazel St), complete
Lump
as specified
Sum
1
1.00
$3,000.00
440
Abandon water main on
Powers St. (New York Ave
to Nevada Ave), complete
Lump
as specified
Sum
1
1.00
$1,000.00
441
Abandon water main on
Rock Place (Grand Ave to
CN RR ROW), complete as
Lump
specified
Sum
1
1.00
$1,000.00
Page 12 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
CO UN IT
INCREASE IN
DECREASE IN
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
442
Furnish and install 2"
PRICE
PRICE
447
casing pipe (18 foot
lengths), complete as
443
specified
Furnish and install 18"
Each
8
4.00
-4.00
$360.00
($1,440.00)
casing pipe (18 foot
lengths), complete as
444
specified
Furnish and install 36"
Each
5
5.00
1.00
$2,000.00
448
casing pipe (18 foot
$10,927.66
$10,927.66
lengths), complete as
449
specified
Each
1
1.00
36.00
$48.00
$1,728.00
445
Furnish and install 1'/"
$5,000.00
water service, complete as
specified, not including
corporation and stop box
Linear
446
Furnish and install 1' /z"
Feet
360
0.00
1.00
- 360.00
$48.00
$4,719.81
($17,280.00)
corporation and stop box
with stainless steel rod,
complete as specified
Each
1
0.00
to save large Oak tree,
-1.00
$742.00
($742.00)
SECTION IV - (BID ITEMS 400 - 446) - SUB - TOTALS
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV
$78,446.90 ($58,102.00)
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE !N
DECREASE IN
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
PRICE
PRICE
447
Additionallabor,
equipment, and materials to
lower 12" water main in the
intersection of Broad St.
and Parkway Avenue,
complete as specified
L.S.
0.00
1.00
1.00
448
Relay 1 -1/4" water service
$10,927.66
$10,927.66
on Powers and Nevada,
449
com fete asspecified
Additional labor,
L. F.
0.00
36.00
36.00
$48.00
$1,728.00
equipment, and materials to
install 6" x 4" tapping valve
and sleeve for storm water
lift station, complete as
450
specified
Additional labor,
L.S.
0.00
1.00
1.00
$4,719.81
$4,719.81
equipment, and materials to
relocate 8" water main on
Melvin St at Station 12 +45
to save large Oak tree,
complete as specified
451
Additional labor ,
L.S.
0.00
1.00
1.00
$2,250.00
$2,250.00
equipment, and materials to
remove old leaded cross
and tee and replace new 6"
x 6" tee on Eastman and
Melvin, complete as
specified
L.S.
0.00
1.00
1.00
$4,058.17
$4,058.17
Page 13 of 14
CONTRACT: 10 -04 CHANGE ORDER # 1
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE 1N
DECREASE IN
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
PRICE
CONTRACT
PRICE
452
Additionallabor,
equipment, and materials to
fix water main blowout on
8/30 on Grand St.,
453
complete as specified
Additional labor,
L.S.
0.00
1.00
1.00
$1,370.00
$1,370.00
equipment, and materials to
fix crack in existing water
main on 8/23, complete as
454
specified
Additional labor,
Hrs.
0.00
1.50
1.50
$750.00
$1,125.00
equipment, and materials to
temporary patch the
Eastman St. and Melvin
Ave. intersection where
water main was extended
and old water main was
abandoned, complete as
455
specified
Additional labor,
L.S.
0.00
1.00
1.00
$2,555.09
$2,555.09
equipment, and materials to
fix leaking water service at
1002 Bong Ct., complete as
456
specified
Furnish and install 18" solid
Hrs.
0.00
2.00
2.00
$750.00
$1,500.00
sleeve, complete as
specified
Each
0.00
1.00
1.00
$1,651.55
$1,651.55
ADDITIONAL WORK: C.O. # 1 (ITEMS 447 - 455) - SUB -TOTAL $31,885.28 $0.00
NET INCREASE TO: SECTION IV $52,230.18
NET INCREASE TO SECTIONS I, II, III, IV
NET DECREASE TO SECTIONS I, II, III, IV
NET INCREASE TO CONTRACT:
$323,869.83
($194,185.91)
$129,683.92