HomeMy WebLinkAbout0121323-Building (windows) CITY OF OSHKOSH No 121323
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1230 POWERS ST Owner JEAN M LEONARD Create Date 08/30/2006
Designer Contractor WASCO - WISCONSIN ALUMINUM SUPPLY C(
Category 141 - Exterior Remodeling Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished /Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 • # Structures 0
Use /Nature SFR/Install 6 windows in existing openings and wrap exterior with aluminum trim.
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation x. `
$3,949.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00
Issued By: w.�' Date 08/30/2006 Final /O.P. 00 /00 /0000
❑ Permit Voided Parcel Id # 1508390000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 2546 AMERICAN DR APPLETON WI 54914 - 0000 Telephone Number 920 - 730 -0099
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.