HomeMy WebLinkAboutHVAC #R2-3224-0211-H City of Oshkosh
Division of Inspection Services
215 Church Avenue
PO Box 1130
n ^ �l� Oshkosh WI 54903 -1130
WW I-i www.ci.oshkosh.wi.us
ON THE WATER
February 23, 2011
Joel Clary
Summit Design LLC
W6744 Rogersville Road
Fond du Lac, WI 54937
Coyote of Wisconsin LLC
PO Box 370948.
Milwaukee, WI 53201
Site: Plan Number: R2- 3224 - 0211 -H
Oshkosh Corporation
2211 Oregon St Suite L & M
Oshkosh WI 54901
For:
Description: Interior Alterations
Object Type: HVAC only
Alteration level: Level 2 Alteration
Plan Submission Date: February 14, 2011
Class of Construction: IIB - 5694 Sq Ft.; unsprinldered
Occupancy: B: Business / Office
The submittal described above, has been reviewed for conformance with applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in Chapter
101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements.
Key Item(s) / Conditions:
• Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve rules under
this code and which are made to construction documents that have previously been granted approval by the
department or its authorized representative, shall be submitted to the office that granted the approval. All revisions
and modifications to plans shall be approved in writing by the department or its authorized representative prior to the
work involved in the revision or modification being carried out. A revision or modification to a plan, drawing or
specification shall be signed and sealed in accordance with Comm 61.31(1).
SUBMIT:
• IMC 403.3.4 Balancing. Ventilation systems shall be balanced by an approved method. Such balancing shall verify
that the ventilation system is capable of supplying the airflow rates required by Section 403. Balancing report
required to be submitted prior to final occupancy being allowed
• Comm 61.40 (4) Supervision. Prior to the initial occupancy of a new building or addition and prior to the final
occupancy of an alteration of an existing building the supervising professional shall file a compliance statement
form SBD -9720 with this office. Note: Submittal of a compliance statement will be considered as evidence that
the supervising professional has properly addressed all items identified in this plan review letter.
A copy of the approved plans, specifications, and this letter shall be on -site during construction. If plan index sheets were
submitted in lieu of additional full plan sets, a copy of this approval letter and index sheet shall be attached to plans that
correspond with the copy on file with the copy on file in this office.
I`, I.tspt t, ns;I''iu n p2 _ 3 " = -02 14 221 r
i _.: r�.it L �_A.�I �t.,._• t.,.
Page 1 of 2
All permits are required to be obtained prior to commencement of work.
In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or
additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shall relieve the designer of the responsibility for designing a safe building, structure, or component. The City of
Oshkosh does not take responsibility for the design or construction of the reviewed items.
Inquiries concerning this correspondence may be made to me at the number listed below or the address on this letterhead.
Respect
rian oe
Building Systems Consultant
(920) 236 -5051
bnoe@ci.oshkosh.wi.us
cc:. Property file
Fee Required $ 400.00
Fee Received $ 400.00
Balance Due $ 0.00
Page 2 of 2