Loading...
HomeMy WebLinkAbout0087165-HVAC (a/c) 10 CITY OF OSHKOSH No 87165 OSHKOSH HVAC PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 835 POWERS ST Owner DANIEL J & AMY WARA Create Date 07/02/2001 Contractor CONDON TOTAL COMFORT Category 501 - Residential -Air Conditioning Plan Fuel 1 Gas 1 Oil 1 1 Electric Solar 1 Solid System 0 New I ❑ Replace 1 ❑ Other Li Forced Air U Radiant u Steam J NC u Vent 1 Electric Hot Water Suppl. Con. Burner Chimney Type ) Chimney A () Chimney B () Direct Vent • Not Applicable Heat Loss 0 As Approved 0 Existing • Not Applicable Value BTU Rate K ) As Per Plan () Variable 0 Other Value Use /Nature SFR / INSTALL LENNOX 2 -1/2 TON A/C SYSTEM of Work Fees: Valuation $1,550.00 Plan Approval $0.00 Permit Fee Paid $29.00 Issued By: Sm S Date 07/02/2001 ❑ Permit Voided In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. Signature Date Agent/Owner Address 11 BLACKBURN ST RIPON WI 54971 -0 Telephone Number (920) 748 -3186 • Division of Inepectios Services 211 Church Avenue F.O. lox 1130 411:WA: F a x • (120) =IX" " Phone (920) 211 -5040 HVAC PERMIT APPLICATION All fields /information after bold categories must be provided. Incomplete applications will not be processed. DATE (a? ..2// JOB ADDRESS OWNER ZO c.P . (i9 ov CONTRACTOR (rte c x 1 , X4 • CIRCLE ALL APP USE CATEGOR SINGLE FAMILY DUPLEX MULTI - FAMILY COMMERCIAL INDUSTRIAL FUEL GAS OIL ELECTRIC SOLAR SOLID SYSTEM NEW REPLACE OTHER TYPE FORCED AIR RADIANT STEAM A/C VENT ELECTRIC HOT WATER SUPPL. CON. BURNER IS CHIMNEY BEING LINED — LINER SIZE MANUFACTURER Note: All chimneys shall be sized per the BTU's being vented. CHIMNEY TYPE CHIMNEY A CHIMNEY B DIRECT VENT OTHER . HEAT LOSS APPROVED EXISTING NOT APPLICABLE BTU RATE ' --AS PER PLAN VARIABLE - OTHER VALUE • NATURE OF WORK: / / VALUE (Including labor and materials) $ /STS7? - ELECTRICAL CONTRACTOR,, Electrical installation of new /replacement equipment shall be done by licensed contractors. Valuation Fees $0 to $1,000.00 $1,000.01 to $10,000.00 for first $1,000.00 plus $1.50 per $100.00 valuation or part thereof $10,000.01 to $25 000 00 ..$155.00 for first $10,000.00 plus $1.00 per $100. valuation or part thereof Over $25,000.00 ........ . _ . .......................... .... $305.0o plus $0.50 per $100.00 valuation or part thereof • Submit payment with application. Failure to pay within 30 days will result in fees being doubled or $100.00 plus the normal permit fee, which ever is greater.