Loading...
HomeMy WebLinkAbout0121888-Building 9 CITY OF OSHKOSH No 121888 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 21 W 15TH AVE Owner KENNETH J/TAMMY L VERMEERSCH Create Date 10/04/2006 Designer Contractor PEPPLER REMODELING Category 140 - Interior Remodeling Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection Finished /Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature SFR/ Bathroom remodel* converting part of the 1st floor enclosed porch into a full bath to serve the master bedroom and remodeling the of Work existing 2nd floor bathroom. I HVAC Contractor Plumbing Contractor UNKNOWN Electric Contractor GROVER ELECTRIC Fees: Valuation $9,800.00 Plan Approval $0.00 Permit Fee Paid $88.00 Park Dedication $0.00 Issued By: Date 10/04/2006 Final /O.P. 00 /00 /0000 ❑ Permit Voided Parcel Id # 0305130000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh no authori to enforce easement restrictions of which it is not a party, if you perform the work described in this permit a • . ion withi ement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur> - • / a r Is before starting such activity. Signature /C / 0- Y Date Agent/Owner Address W2380 COUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920 - 361 -7731 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.