HomeMy WebLinkAbout0121888-Building 9 CITY OF OSHKOSH No 121888
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 21 W 15TH AVE Owner KENNETH J/TAMMY L VERMEERSCH Create Date 10/04/2006
Designer Contractor PEPPLER REMODELING
Category 140 - Interior Remodeling Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished /Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature SFR/ Bathroom remodel* converting part of the 1st floor enclosed porch into a full bath to serve the master bedroom and remodeling the
of Work existing 2nd floor bathroom.
I
HVAC Contractor Plumbing Contractor UNKNOWN
Electric Contractor GROVER ELECTRIC
Fees: Valuation $9,800.00 Plan Approval $0.00 Permit Fee Paid $88.00 Park Dedication $0.00
Issued By: Date 10/04/2006 Final /O.P. 00 /00 /0000
❑ Permit Voided Parcel Id # 0305130000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh no authori to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit a • . ion withi ement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur> - • / a r Is before starting such activity.
Signature /C / 0- Y Date
Agent/Owner
Address W2380 COUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920 - 361 -7731
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.