HomeMy WebLinkAbout1988-Plumbing Phase I #H7-9-588-P May 24,1988
Schmidt Oil Co.
Plumbing Department
425 S. Washington St.
Combined Locks, Wi. 54113
RE: Plumbing Plan Approval for Phase 1
801- 03 -05 -07 Portside Ct. H7- 9 -588P
Gentlemen:
Examination of the plumbing plans and specifications for the
abovementioned project has been completed.
In accord with Chapter 145, Wisconsin Statute, and ILHR 81 through 85,
Wisconsin Administrative Code, the plumbing plans and specifications
are approved contingent upon compliance with the stipulation noted
below:
1. Water calculations are required to size water service pipe.
ILHR82.40
2. Drainage fixture unit loads are required to size sanitary sewer
pipe. ILHR82.30
In the event installation of this plumbing system has not
commenced within two years from this date, this approval shall
become void. A new application accompanied by full examination
fee shall be filed and an updated approval received before work
may commence.
In granting this approval, the City of Oshkosh or its
representative does not hold itself liable for any defects in
plans or specification, plan omissions, examination oversight,
construction or any damage that may result in or after
installation and reserves the right to order changes or additions
should conditions arise making this necessary.
It shall be necessary for installing plumber to obtain a plumbing
permit from the City of Oshkosh before proceeding with actual
installation of this plumbing system or any of its parts.
Sincerely,
RICHARD WOOD, Plumbing Inspector
RW :mr