HomeMy WebLinkAbout1988-Plumbing Phase II #H7-9-558-P CITY HALL
215 Church Avenue
P O Box 1130
Oshkosh,
902 -11130 City of Oshkosh
(j) June 9, 1988
OfHKO H
Sc TmiaTC Oil Co.
Plumbing Department
425 S. Washington St.
Combined Locks, WI 54113
RE: Plumbing Plan Approval for 801- 03 -05 -07 Portside Ct.
H7- 9 -588P Phase II
Gentlemen:
Examination of the plumbing plans and specifications for the
abovementioned project has been completed.
In accord with Chapter 145, Wisconsin Statute, and ILHR 81 through 85,
Wisconsin Administrative Code, the plumbing plans and specifications
are approved contingent upon compliance with the stipulation noted
below:
1. Drain vent system requires minimum 3" trap. ILHR 82.31
2. Vertical wet vent size as per code. ILHR 82.31
3. Drain vent between laundry and building drain brand will require 4"
pipe. ILHR 82.31
4. Control valve and water hammer suppressor required on automatic
dishwasher and laundry hookup. ILHR 82.40
5. Pressure balance valve on showers. ILHR 82.40
In the event installation of this plumbing system has not commenced
within two years from this date, this approval shall become void. A
new application accompanied by full examination fee shall be filed and
and an updated approval received before work may commence.
In granting this approval, the City of Oshkosh or its representative
does not hold itself liable for any defects in plans or specification,
plan omissions, examination oversight, construction or any damage that
may result in or after installation and reserves the right to order
changes or additions should conditions arise making this necessary.
It shall be necessary for installing plumber to obtain a plumbing
permit from the City of Oshkosh before proceeding with actual
installation of this plumbing system or any of its parts.
Sincerely,
RfCHARD WOOD, Plumbing Inspector