HomeMy WebLinkAboutBuilding #R2-3224-0211 City of Oshkosh
Division of Inspection Services
215 Church Avenue
PO Box 1130
Oshkosh WI 54903 -1130
Of HKQIH www.ci.oshkosh.wi.us
ON THE WATER
February 10, 2011
Thomas Karrels
T.R. Karrels & Associates
1934 Algoma Blvd
Oshkosh, WI 54901
Coyote of Wisconsin LLC
PO Box 370948.
Milwaukee, WI 53201
Site: Plan Number: R2 -3224 -0211
Oshkosh Corporation
2211 Oregon St Suite L & M
Oshkosh WI 54901
For:
Description: Interior Alterations
Object Type: Building only
Alteration level: Level 2 Alteration
Plan Submission Date: February 1, 2011
Class of Construction: IIB - 5694 Sq Ft.; unsprinldered
Occupancy: B: Business / Office
The submittal described above, has been reviewed for conformance with applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in Chapter
101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements.
Key Item(s) / Conditions:
• IBC 712.3 Any penetrations of fire rated assemblies are required to be protected with a listed fire stopping system
that matches the rating of the wall assembly being penetrated. Copies of the fire stopping systems are required to
be provided at the time of inspection. Note — priorplans on file indicate a fire wall exists in wall dividing East
section of offices from break room.
• IBC 1006.3 Means of egress illumination is required to be installed per this section.
• IBC 1017.1 Construction. Corridors shall be fire- resistance rated in accordance with Table 1017.1. The
corridor walls required to be fire- resistance rated shall comply with Section 708 for fire partitions. Per email
from designer the total occupant load for this space will not exceed 30. If future use or modification results
in an increased occupant load corridors will be required to be fire rated.
• Comm 61.30(3) — This approval does not include heating, ventilating or air conditioning. The owner should be
reminded that HVAC plans, calculations and appropriate fees are required to be submitted for review and approval
prior to installation. The State of Wisconsin, Safety and Buildings division offers a number of worksheets and
checklists for Commercial Building Code at httn: // commerce. wi. gov /SB /SB CommBldgPlanRevinfo.html that may
assist you in preparing this submittal. Building Designer should coordinate with HVAC designer to avoid problems
with clearance to combustibles, dampers etc. The submitted HVAC plans shall match the approved building plans.
Building Designer is requested to provide complete set of Plans, Energy Calculations and Building Plan Review
Letter to the HVAC Designer to help coordinate review. Note as per Comm 2.10 installation of HVAC without
approved plans could result in double fees.
I:'In:a„eelions\Plan Revic ..2i,1 `i 2 2' 21 122
C -3 24 -0" 2211 C;rcgon . Hite L , ;; L'1 duc
Page 1 of 2
• Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve rules under
this code and which are made to construction documents that have previously been granted approval by the
department or its authorized representative, shall be submitted to the office that granted the approval. All revisions
and modifications to plans shall be approved in writing by the department or its authorized representative prior to the
work involved in the revision or modification being carried out. A revision or modification to a plan, drawing or
specification shall be signed and sealed in accordance with Comm 61.31(1).
SUBMIT:
• IBC 1006.3 Means of egress illumination is required to be installed per this section. All paths of egress are required
to have adequate emergency lighting to meet the performance requirements of IBC 1006.4. Provide complete
emergency lighting plan showing compliance with these requirements prior to installation of emergency lighting
system.
• Comm 61.40 (4) Supervision. Prior to the initial occupancy of a new building or addition and prior to the final
occupancy of an alteration of an existing building the supervising professional shall file a compliance statement
form SBD -9720 with this office. Note: Submittal of a compliance statement will be considered as evidence that
the supervising professional has properly addressed all items identified in this plan review letter.
A copy of the approved plans, specifications, and this letter shall be on -site during construction. If plan index sheets were
submitted in lieu of additional full plan sets, a copy of this approval letter and index sheet shall be attached to plans that
correspond with the copy on file with the copy on file in this office.
All permits are required to be obtained prior to commencement of work.
In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or
additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shall relieve the designer of the responsibility for designing a safe building, structure, or component. The City of
Oshkosh does not take responsibility for the design or construction of the reviewed items.
Inquiries concerning this correspondence may be made to me at the number listed below or the address on this letterhead.
Respec
Brian Noe
Building Systems Consultant
(920) 236 -5051
bnoe @ci.oshkosh.wi.us
cc: Property file
Fee Required $ 600.00
Fee Received $ 600.00
Balance Due $ 0.00
I .hiseecti ns`P1an Pc. ie;= -20I 2- 3`24 -0 2211 0;e2oll ni e L Ed a n ; duc
Page 2 of 2